{{ MaintenanceDetail }}
Documents such as Excel files (.xls,Xlsx,Xlsm) will need to be downloaded to view please check your download folder
Please note This system only works on modern browsers such as Edge,Chrome,Firefox and Safari (Apple devices)
To download a document use the button. Note: Documents that contain a large number of pages can take some time to process!
APPLICATION
CIL DOCS
CONSULTATIONS
- Upper Lighthorne Parish Council (18.7.24)
- WCC Rights of Way Team (18.7.24)
- LLFA 18.7.24
- WCC Ecology Weekly List 01.07.2024
- Ecology Team
- WCC Highways (22.7.24)
- WCC Highways Annotated comments 1 of 4 22.7.24
- WCC Highways Annotated comments 2 of 4 22.7.24
- WCC Highways Annotated comments 3 of 4 22.7.24
- WCC Highways Annotated comments 4 of 4 22.7.24
- Warwickshire Fire and Rescue Service 10.09.24
- LLFA 27.9.24
- WCC Highways (29.10.24)
- WCC Highways (29.10.24)
CORRESPONDENCE
PLANS – FOUL & SURFACE DRAINAGE
- SUPERSEDED by Rev A (9.9.24) 19002 2E_2D Main infrastructure Drainage Report_Part1
- SUPERSEDED by Rev A (9.9.24) 19002 2E_2D Main infrastructure Drainage Report_Part2
- SUPERSEDED by Rev A (9.9.24) 19002 2E_2D Main infrastructure Drainage Report_Part3
- SUPERSEDED by Rev A (9.9.24) 19002 2E_2D Main infrastructure Drainage Report_Part4
- 19002 2E_2D Main infrastructure Drainage Report_Part5
- 19002 - Kingston Grange phase 2D_2E MI LLFA response 30.08.24
- 19002 2E_2D Main infrastructure Drainage Report - rev A (Rec d 9.9.24)
- MI-1F Preliminary Finished Floor Levels and Drainage Strategy
- MI-2F Preliminary Finished Floor Levels and Drainage Strategy
- MI-3-1C - Preliminary Finished Floor Levels and Drainage Strategy
- MI-3F Preliminary Finished Floor Levels and Drainage Strategy
- MI-19B Flood Routing Plans - Sheet 1
- MI-20B Flood Routing Plans - Sheet 2
- MI-21B Flood Routing Plans - Sheet 3
PLANS – HIGHWAYS
- Highway comments 22.7.24 plus designer response 15.08.24
- Approved RSA1 Brief - Upper Lighthorne Main Infrastructure
- SA4626 S38 REVISED RSA1
- Upper Lighthorne Meeting SDC and WCC 19th April v2
- Upper Lighthorne MI S38 RSA1 - Designer Response
- 19002 - Kingston Grange phase 2D_2E MI response to highway comments at planning 18.11.24
- MI-4G - Adoption and Visibility Plan
- MI-5-1C - Adoption and Visibility Plan
- MI-5G - Adoption and Visibility Plan
- MI-6F - Swept Path Analysis - MPV - Sheet 1
- MI-7-1B - Swept Path Analysis - MPV- Sheet 3
- MI-7E - Swept Path Analysis - MPV- Sheet 2
- MI-8F - Swept Path Analysis - Fire Appliance- Sheet 1
- MI-9-1B - Swept Path Analysis - Fire Appliance- Sheet 3
- MI-9F - Swept Path Analysis - Fire Appliance- Sheet 2
- MI-10-1G - Swept Path Analysis - Refuse - Sheet 1-1
- MI-10-2G - Swept Path Analysis - Refuse - Sheet 1-2
- MI-10-3B - Swept Path Analysis - Refuse - Sheet 1-3
- MI-11-1C - Swept Path Analysis - Refuse - Sheet 3-1
- MI-11-2G - Swept Path Analysis - Refuse - Sheet 2-2
- MI-11-3C - Swept Path Analysis - Refuse - Sheet 3-2
- MI-11-4B - Swept Path Analysis - Refuse - Sheet 2-3
- MI-11G - Swept Path Analysis - Refuse - Sheet 2-1
- MI-12E - Road and Sewer Long Sections - Sheet 1
- MI-13E - Road and Sewer Long Sections - Sheet 2
- MI-14-1 - Road and Sewer Long Sections - Sheet 4
- MI-14E - Road and Sewer Long Sections - Sheet 3
- MI-15B Highway Construction Detail
- MI-16C General Arrangement
- MI-17C General Arrangement
- MI-18C General Arrangement
PLANS – LOCATION, LAYOUT & MATERIALS
SUPERSEDED
- MI-1C Preliminary Finished Floor Levels and Drainage Strategy
- MI-2C Preliminary Finished Floor Levels and Drainage Strategy
- MI-3-1 - Preliminary Finished Floor Levels and Drainage Strategy
- MI-3C Preliminary Finished Floor Levels and Drainage Strategy
- MI-4D - Adoption and Visibility Plan
- MI-5-1 - Adoption and Visibility Plan
- MI-5D - Adoption and Visibility Plan
- MI-6D - Swept Path Analysis - MPV - Sheet 1
- MI-7-1 - Swept Path Analysis - MPV - Sheet 3
- MI-7C - Swept Path Analysis - MPV - Sheet 2
- MI-8D - Swept Path Analysis - Fire - Sheet 1
- MI-9-1 - Swept Path Analysis - Fire - Sheet 3
- MI-9D - Swept Path Analysis - Fire - Sheet 2
- MI-10D - Swept Path Analysis - Refuse - Sheet 1
- MI-11-1 - Swept Path Analysis - Refuse - Sheet 3
- MI-11D - Swept Path Analysis - Refuse - Sheet 2
- MI-12C - Road and Sewer Long Sections - Sheet 1
- MI-13C - Road and Sewer Long Sections - Sheet 2
- MI-14C - Road and Sewer Long Sections - Sheet 3
- MI-15B Highway Construction Detail
- MI-16 General Arrangement (Rec d 21.6.24)
- MI-17 General Arrangement (Rec d 21.6.24)
- MI-18 General Arrangement (Rec d 21.6.24)
- MI-1D Preliminary FFL and DS
- MI-2D Preliminary FFL and DS
- MI-3-1A Preliminary FFL and DS
- MI-3D Preliminary FFL and DS
- MI-19 Flood Routing Plans - Sheet 1
- MI-20 Flood Routing Plans - Sheet 2
- MI-21 Flood Routing Plans - Sheet 3
- MI-1D Preliminary FFL and Drainage Strategy
- MI-2D Preliminary FFL and Drainage Strategy
- MI-3-1A - Preliminary FFL and Drainage Strategy
- MI-3D Preliminary FFL and Drainage Strategy
- MI-19 Flood Routing Plans - Sheet 1
- MI-20 Flood Routing Plans - Sheet 2
- MI-21 Flood Routing Plans - Sheet 3
- MI-4E - Adoption and Visibility Plan
- MI-5-1A - Adoption and Visibility Plan
- MI-5E - Adoption and Visibility Plan
- MI-6D - Swept Path Analysis - MPV - Sheet 1 - Copy
- MI-6D - Swept Path Analysis - MPV - Sheet 1
- MI-7C - Swept Path Analysis - MPV - Sheet 2
- MI-7-1 - Swept Path Analysis - MPV - Sheet 3
- MI-8D - Swept Path Analysis - Fire - Sheet 1
- MI-9D - Swept Path Analysis - Fire - Sheet 2
- MI-9-1 - Swept Path Analysis - Fire - Sheet 3
- MI-10-1E - Swept Path Analysis - Refuse - Sheet 1-1
- MI-10-2E - Swept Path Analysis - Refuse - Sheet 1-2
- MI-10-3 - Swept Path Analysis - Refuse - Sheet 1-3
- MI-11-1A - Swept Path Analysis - Refuse - Sheet 3-1
- MI-11-2E - Swept Path Analysis - Refuse - Sheet 2-2
- MI-11-3A - Swept Path Analysis - Refuse - Sheet 3-2
- MI-11-4 - Swept Path Analysis - Refuse - Sheet 2-3
- MI-11E - Swept Path Analysis - Refuse - Sheet 2-1
- MI-12D - Road and Sewer Long Sections - Sheet 1
- MI-13D - Road and Sewer Long Sections - Sheet 2
- MI-14D - Road and Sewer Long Sections - Sheet 3
- MI-16A General Arrangement
- MI-17A General Arrangement
- MI-18A General Arrangement
{{PageListing}}