{{ MaintenanceDetail }}
Documents such as Excel files (.xls,Xlsx,Xlsm) will need to be downloaded to view please check your download folder
Please note This system only works on modern browsers such as Edge,Chrome,Firefox and Safari (Apple devices)
To download a document use the button. Note: Documents that contain a large number of pages can take some time to process!
APPLICATION
- ARBORICULTURAL ASSESSMENT 10026 AA Rev C_compressed
- 210729 - Noise Assessment
- Air Quality Statement
- ARCHAEOLOGICAL DESK BASED ASSESSMENT
- Biodiversity Impact Assessment Calculations v.19.1
- Climate Change Checklist
- Ecological Appraisal
- Outline Construction Management Plan
- Design & Access Statement c P21-0763_18B
- Phase I SITE APPRAISAL GI_A
- Planning Statement Rev A
- Application Form
- Covering Letter
- Transport Statement Issue 03 Part 1
- Transport Statement Issue 03 Part 2
- V3 Flood Risk Assessment and Drainage Strategy
- Geophysical Survey Report (Aachaeology) Received 8.2.22
- Biodiversity Impact Assessment Calculations 9701 030322 WCS_BIA_v.19.1 MACROS DISABLED (Received 8.7.22)
- 9701 BIA Technical Note 230322 Rev B (Received 8.7.22)
- Archaeological Field Evaluation May 2022 (Received 8.7.22)
- Ecology Supporting Ltr 12.04.22 (Received 8.7.22)
- Great Crested Newt Technical Review 29.06.22 (Received 8.7.22)
- Noise Impact Assessment Addendum 14.4.22 (Received 8.7.22)
- P21-0763_18D Design & Access Statement (Received 8.7.22)
- Resubmission Covering Letter Received 08.07.22
- Further Resubmission Covering Letter 31.8.22
- 9701-E-Technical Note-Kingston Fields Farm-30.8.2022 GCN Technical Review
- Up-to-date Application Reports and Plans Schedule 310822 Rev A
- Technical Note - Surface Water Discharge Ditch Capacity Rv01 (23.2.22)
- CHANGE OF APPLICANT notification 19.9.23 from Terra Strategic to Wain Estates
CIL DOCS
CONSULTATIONS
- National Highways (1.2.22)
- WCC Fire and Rescue Services Water Officer - Racha (2.2.22)
- NHS Coventry and Warwickshire CCG (Primary Healthcare) 8.2.22
- WCC Rights of Way (8.2.22)
- SDC Waste & Recycling Officer 9.2.22
- Warwickshire Fire and Rescue (10.2.22)
- SDC Environmental Health 15.02.2022
- Upper Lighthorne Parish Council (21.2.22)
- WCC Ecology (21.2.22)
- South Warwickshire NHS Foundation Trust (Acute & Planned Healthcare) (21.2.22)
- WCC LLFA 22.2.22
- SDC Environmental Health (Land Contamination Conditions) 21.2.22
- WCC Infrastructure - Education + Libraries + PROW + Travel + Safety 4.3.22
- SDC Development & Enabling Officer (4.3.22)
- SDC Development & Enabling Officer (4.4.22)
- WCC Highways
- Jacqui Harris - Ward member
- WCC LLFA Flood Risk Management 28.7.22
- WCC Ecology (4.8.22)
- WCC Highways (22.8.22)
- WCC LLFA (23.9.22)
- Housing Policy 21.9.22
CORRESPONDENCE
PLANS – FOUL & SURFACE DRAINAGE
- 22.03.24 Surface Water Network Calculations (Received 8.7.22)
- 05527 Technical Note - LLFA Planning Response P0 (Received 8.7.22)
- 05527-0200-P4 External Levels (Received 8.7.22)
- P21-0763_24 Water Butt Locations (Received 8.7.22)
- 05527-0215-P5 Flood Exceedance Plan
- 05527-0210-P6 Drainage Strategy
- 05527 0211 P0 (Drainage) Area Contribution Plan
- 05527-0216-P0 Typical SuDS Construction Details
- 05527-0219-P0 Proposed Headwall Construction Detail
- 05527 Drainage O&M Report Rv A (Full)
- 05527-0217-P0 Attenuation Tank Sheet 1 of 2
- 05527-0218-P0 Attenuation Tank Sheet 2 of 2
PLANS – HIGHWAYS
- Priority Junction Works 20-1107_SK03 Rev H (Received 8.7.22)
- Indicative Adoption Plan 20-1107-LA01 Rev B (Received 8.7.22)
- Internal Visibility Spalys 20-1107-SK05 Rev C (Received 8.7.22)
- Dimensions Plan 20-1107-SK06 Rev B (Received 8.7.22)
- Site Access Swept Path Analysis (Estate Car) 20-1107-SP01 Rev D (Received 8.7.22)
- Swept Path Analysis (Estate Car Passing)20-1107-SP03 Rev D (Received 8.7.22)
- Swept Path Analysis (Delivery Vehicle & Car)20-1107-SP06 Rev D (Received 8.7.22)
- Swept Path Analysis (Fire Appliance) 20-1107-SP07 Rev D (Received 8.7.22)
- Swept Path Analysis (Vehicle & Visitor Parking) 20-1107-SP08 Rev B (Received 8.7.22)
- P21-0763_10-4D Parking Assessment Plan (Received 8.7.22)
PLANS – HOUSE TYPES, ELEVATIONS AND FLOOR PLANS
PLANS – LANDSCAPING & BOUNDARY TREATMENTS
PLANS – LOCATION, LAYOUT & MATERIALS
- P21-0763_01A Site Location Plan
- 06060_prelim geophysical findings
- Site Location Plan DWG P21-0763_01A
- Demolition Plan DWG P21-0763_20A
- Technical Note 05527-T-001-A (Received 8.7.22)
- P21-0763_09i Site Layout (Received 8.7.22)
- P21-0763_10-1D Building Heights (Received 8.7.22)
- P21-0763_10-2D Tenure Plan (Received 8.7.22)
- P21-0763_10-4D Parking Assessment Plan (Received 8.7.22)
- P21-0763_10-5E Materials Plan (Received 8.7.22)
- P21-0763_21B EV Charging Plan (Received 8.7.22)
- P21-0763_24 Water Butt Locations (Received 8.7.22)
REPORTS
SUPERSEDED
- Arboricultural Assessment
- Climate Change Checklist
- Covering Letter 12102021
- CTP-20-107-SK05A Internal Visibility Splays
- Lighthorne FRA Drainage Strategy inc Appendices
- P21-0763_09E Site Layout
- P21-0763_10-1B Building Heights
- P21-0763_10-2B Tenure
- P21-0763_10-3B Refuse Strategy
- P21-0763_10-4B Parking
- P21-0763_10-5C-Materials
- P21-0763_10-6C-Enclosures Plan
- P21-0763_10-7B Garden Sizes
- P21-0763_11 Housepack Part 1
- P21-0763_11 Housepack Part 2
- P21-0763_18A DAS
- P21-0763_19 Substation
- Phase I Site Appraisal
- Planning Statement
- Transport Statement - Part 1
- Transport Statement - Part 2
- 20-107-SP04B Swept Path Analysis (Car)
- 20-107-SP05B Swept Path Analysis (Refuse and Car)
- 20-107-SP07B Swept Path Analysis (Fire)
- 20-1107 - SP01B Access Swepth Path Analysis (Car)
- 20-1107_SK03D Priority Junction S278 Works
- 20-1107-SP03B Swept Path Analysis (Cars Passing)
- 20-1107-SP06B Swept Path Analysis (Car and Delivery)
- 20-1170-SP02B Swept Path Analysis (Refuse)
- 05527-0200-P2 External Levels
- 05527-0210-P2 Drainage Strategy
- 05527-0215-P2 Flood Exceedance Plan
- 10026-L01-02 P03 Detailed Landscape Proposals
- 22781Y_01_Topo Survey
- Baseline Habitat Plan Figure 1
- Habitat Retention plan Figure 2
- Proposed Habitat Plan Figure 3
- BIA technical note 9701 (2021)
- BIA technical note 9701 (2021)
- BIA Calculation
- BIA Calculation
- SWEPT PATH ANALYSIS REFUSE AND CAR DWG 20-107-SP05C
- SWEPT PATH ANALYSIS FIRE APPLIANCE DWG 20-107-SP07C
- SWEPT PATH ANALYSIS REFUSE VEHICLE DWG 20-1070-SP02C
- SITE ACCESS SWEPT PATH ANALYSIS ESTATE CAR DWG 20-1107 - SP01C
- PROPOSED PRIORITY JUNCTION DWG 20-1107_SK03E
- ON SITE SWEPT PATH ANALYSIS OF ESTATE CAR PASSING DWG 20-1107-SP03C
- ON SITE REFUSE ACCESS AND CAR DWG 20-1107-SP04C
- ON SITE SWEPT PATH ANALYSIS OF DELIVERY VEHICLE AND CAR 20-1107-SP06C
- Biodiversity Impact Assessment Rev A
- INTERNAL VISIBILITY SPLAY DWG CTP-20-107-SK05B
- External Levels DWG 0200 Rev P3
- P3 Drainage Strategy
- P3 Flood Exceedance
- P04 Hard Landscape
- P04 Soft Landscape
- Site Layout DWG P21-0763_09G-02
- Building Heights DWG P21-0763_10-1C
- Tenure DWG P21-0763_10-2C
- Refuse Strategy DWG P21-0763_10-3C
- Parking DWG P21-0763_10-4C
- Materials DWG P21-0763_10-5C
- Enclosures Plan DWG P21-0763_10-6C
- Garden Sizes DWG P21-0763_10-7C
- ELEVATIONS AND PLANS P21-0763_11A Housepack_comp
- Charging Plan P21-0763_21A EV
- 05527-0210-P5 Drainage Strategy (Received 8.7.22)
- 05527-0215-P4 Flood Exceedance Plan (Received 8.7.22)
- Up-to-date Application Reports and Plans Schedule 31.8.22
{{PageListing}}