{{ MaintenanceDetail }}
Documents such as Excel files (.xls,Xlsx,Xlsm) will need to be downloaded to view please check your download folder
Please note This system only works on modern browsers such as Edge,Chrome,Firefox and Safari (Apple devices)
To download a document use the button.
Note: Documents that contain a large number of pages can take some time to process!
APPLICATION
- Botanical Assessment
- Climate Change Checklist for conversion and change of use developments
- CO28-CCL03467-Environmental Assessment (Rev. 1) Section 1 of 4
- CO28-CCL03467-Environmental Assessment (Rev. 1) Section 2 of 4
- CO28-CCL03467-Environmental Assessment (Rev. 1) Section 3 of 4
- CO28-CCL03467-Environmental Assessment (Rev. 1) Section 4 of 4
- Design and Access Statement V4
- Flood Risk Assessment pdf_Part1
- Flood Risk Assessment pdf_Part2
- Flood Risk Assessment pdf_Part3
- Flood Risk Assessment pdf_Part4
- Flood Risk Assessment pdf_Part5
- Flood Risk Assessment pdf_Part6
- Great Crested Newt Survey pdf
- Ground Investigation Report
- Otter and Water Vole Survey
- Part 1 - Archaeological Assessment and WSI
- Part 2 - Archaeological Assessment and WSI
- Preliminary Arboricultural Assessment
- Preliminary Bat Roost Assessment
- Reptiles Survey
- Riverside Park Signage Strategy_P02
- rtmme154220 BIA - Final
- Stage 1 Road Safety Audit
- Stratford Riverside WFD Scoping Assessment
- Tree Hazard Assessment
- 21.09 Cover letter to SDC(1)
- 2109 Planning Statement FINAL
- Application Form
- GCM-JBAU-XX-XX-LT-HM-0003
- GCM-JBAU-XX-ZZ-RP-HM-0001-A02-C01-FRA_Report(WithApp)
- Landscape Specification
- Package 5 Specification
- 211110 SDC
- Package 6 Specification V2
CIL DOCS
CONDITIONS 004
- Application form redacted
- Bridge Abutment Dwg No. 301
- Bridge Abutment and Gabion Retaining Wall Co-ordinates Dwg No. 306
- Gabion Wall Elevations Dwg No. 307 (P2)
- Footpath and Embankment Co-ordinates Dwg No. 308 (P3)
- Plan and co-ordinates of Gabion Wall adjacent road Dwg No. 312 (P3)
- Cross Section Dwg No. 314 (P2)
- Stratford Riverside - 4mm Gabion info
- Stratford Riverside - Durability of Gabions
- Stratford Riverside - Gabion Stone sample
- Stratford Riverside - Gabion Stone spec
- Stratford Riverside - STRAT-DD-08-T-5
- Stratford Riverside - Gabion Basket RAM
- Ecology Response 26.04.2022
- EA Response
- DISCN/00163/22 Decision Notice
CONDITIONS 005
- Application form
- Masterplan, Package 5 Dwg No. STRAT-DD Sheet 17 T Rev 1
- Blue Diamond Pattern Paver Spec Grp 2 Declaration of Performance No 24333677-A1W2433 issued by Wienerberger on 1 June 2013
- Diamond Pattern Blue Product Technical Information Sheet issued by Wienerberger on 16 October 2020
- DISCN/00273/22 Decision Notice
CONDITIONS 006
- Application Form
- SUPERCEDED Construction Environmental Management Plan (CEMP) Issue 1 dated January 2022
- SUPERCEDED Package 3 Riverside North Dwg No. STRAT-LP 01 Rev 7
- SUPERCEDED Construction Phase, Health, Safety & Environmental Plan dated 28th October 2021
- SUPERCEDED Package 4 Construction Management Plan, Package 4 Dwg No. STRAT-DD 16T Rev 1
- Package 3 Construction Management Plan, Package 3 Dwg No. STRAT-DD Rev 2
- SUPERCEDED Construction Phase Health & Safety Plan prepared by McVeigh
- Natural England response 21.02.22
- SDC Environmental Health response 23.02.22
- EA Response 25.02.22
- WCC Ecology 01.03.22
- WCC Highways 02.03.2022
- agent
- Cobra 3000 Rotary Rig - Spec, rec d 01.03.22
- Cobra B25 Drop Hammer - Spec Sheet, rec d 01.03.22
- COSHH01 Concrete, rec d 01.03.22
- COSHH02 - Hydraulic Oil, rec d 01.03.22
- COSHH03 - Paint - Linemarker Linemarking aerosol, rec d 01.03.22
- COSHH04 - Fuel - Petrol, rec d 01.03.22
- COSHH05 - Fuel - Derv-Diesel, rec d 01.03.22
- COSHH06 - Lubricants - Engine Oil, rec d 01.03.22
- COSHH07 - Arc Welding Electrodes - general, rec d 01.03.22
- COSHH08 - Arc Welding Electrodes - dust & fume, rec d 01.03.22
- COSHH09 - Lubricants - K 42 EP Grease, rec d 01.03.22
- Rev. C01 Stratford Upon Avon - Bridge Demo MS, rec d 01.03.22
- J & S Piling Method Statement - 2021223, rec d 01.03.22
- J & S Piling Risk Assessment - 2021223, rec d 01.03.22
- Murlac Frame Dam Method Statement 31.01.22, rec d 01.03.22
- Risk Assesment(Construction Vehicle Bridges), rec d 01.03.22
- lift plan 2201cp Stratford Upon Avon, rec d 01.03.22
- MS CB24 HEAVY, rec d 01.03.22
- SUPERCEDED Package 3 Construction Phase Health & Safety Plan prepared by McVeigh Rev 1, rec d 01.03.22
- Package 3 - Method Statement - Working Round Trees, rec d 01.03.22
- Package 3 - Planning Notes, rec d 01.03.22
- SUPERCEDED Package 3 - Construction Environmental Management Plan (CEMP) Issue 2 dated March 2022 rec d 01.03.22
- SUPERCEDED Package 4 - CEMP Appendix B - Site Layout and Logistics Plan 1, Riverside North Dwg No. STRAT-LP 01 Rev 7 rec d 01.03.22
- SUPERCEDED Package 4 - CEMP Appendix C - Haul Routes and Site Access 1, Dwg No. STRAT-DD 16T Rev 1 rec d 01.03.22
- SUPERCEDED Package 4 - CEMP Appendix D - WelfareUnit, rec d 01.03.22
- SUPERCEDED Package 4 Construction Phase, Health, Safety & Environmental Plan Rev 2 dated 28th October 2021 rec d 01.03.22
- SUPERCEDED Package 4 - Planning Condition Information, rec d 01.03.22
- Package 3 Rev. C01 Stratford Upon Avon - Bridge Demo MS, rec d 01.03.22
- Risk Assesment(Construction Vehicle Bridges), rec d 01.03.22
- SUPERCEDED Package 4 - Planning Condition Information
- SUPERCEDED Package 3 - Further Information Requested by WCC Highways - 020322, rec d 22.03.22
- SUPERCEDED Package 4 & 5 - Planning Condition Information (rev a), rec d 22.03.22
- WCC Ecology response 30.03.22
- WCC Highways Response
- CEMP feedback - Ecology - Stratford Riverside
- WCC Highways Response 06.04.2022
- WCC Ecology Response 12.04.2022
- Environmental Health Response 27.04.2022
- correspondance 28.04.2022
- Package 3 - Further Information Requested by WCC Highways - 020322 rec d 04.04.22
- Package 3 - CEMP feedback - Ecology - Stratford Riverside rec d 04.04.22
- SUPERCEDED Package 4 Construction Phase, Health, Safety & Environmental Plan Rev 2 dated 28th October 2021 rec d 04.04.22
- SUPERCEDED Package 3 - Construction Environmental Management Plan (CEMP) Issue 3 dated May 2022 rec d 04.05.22
- Package 3 Construction Phase Health & Safety Plan prepared by McVeigh dated 12.02.22, rec d 04.05.22
- SUPERCEDED Appendix B - Site Layout and Logistics Plan packages 4 and 5
- Appendix C - Haul Routes and Site Access packages 4 and 5
- Appendix D - WelfareUnit packages 4 and 5
- Package 3 CEMP - Rev 3
- Stratford Riverside 4 and 5- Construction & Environmental Phase Plan 2.0 Issued for Construction 22.02.22V3
- Construction Phase, Health, Safety & Environmental Plan dated 28 October 2021 Rev 4.0
- Pre-work Wildlife Inspection Checklist EP 1.3
- Environmental Aspects & Impact Assessment Procedure EP 1 dated 10 July 2020
- Stratford Riverside - Construction & Environmental Phase Plan 2.0 Issued for Construction 22.02.22V3
- Bird nesting checksheet Stratford Riverside
- EP 1 Environmental Aspects & Impact Assessment Procedure
- Environmental Health Response 07.06.2022
- Stratford Riverside - Construction & Environmental Phase Plan 2.0 Issued for Construction 090622 v4.
- Environmental Health Response 24.06.2022
- WCC Highways Response 29.06.2022
- Agent response to Highways comments 30.06.22
- Appendix B - Site Layout and Logistics Plan packages 4 and 5 (Rev 300622)
- DISCN/00059/22 Decision Notice
CONDITIONS 008
- Application Form
- Package 3 - Tree Protection Plan issue P1 dated 21 January 2022
- Package 3 - Tree Protection Plan - Package 3
- SUPERCEDED Package 3 - CEMP Rev 2
- SUPERCEDED Package 3 - CPP Rev 1
- Package 3 - Planning Notes, rec d 01.03.22
- Package 4 - CEMP Appendix B - Site Layout and Logistics Plan 1, Riverside North Dwg No. STRAT-LP 01 Rev 7 rec d 01.03.22
- Package 4 Construction Phase, Health, Safety & Environmental Plan Rev 2 dated 28th October 2021 rec d 04.04.22
- Package 3 - Construction Environmental Management Plan (CEMP) Issue 3 dated May 2022 rec d 04.05.22
- Package 3 - Construction Phase Health & Safety Plan prepared by McVeigh dated 12.02.22, rec d 04.05.22
- Package 3 Construction Management Plan Package 3 Dwg No. STRAT-DD Rev 2
- Package 4 & 5 - Planning Condition Information (rev a), rec d 22.03.22
- Phase/Package 3 Arboricultural Method Statement
- Stratford Riverside - Construction & Environmental Phase Plan 2.0 Issued for Construction 22.02.22V3
- Haul Routes for Stratford REV A
- Stratford Riverside - Package 4&5 Haul Routes & Tree Protection
- DISCN/00060/22 Decision Notice
CONDITIONS 010
- ApplicationFormRedacted
- Remediation Verification Report No. CCL03467.CR33 Dated January 2023
- Removal of ACMs Document ref. CCL03467.CQ50 - Rev 2 Dated August 2022
- Environmental Health Response 06.03.2023
- Environmental Health Response 14.03.2023
- EHO
- Technical Design Note - Land Contamination - Project Review Hydrock and dated 14 March 2023
- letter to J Dicker 25.5.23
- DISCE/00014/23 Decision Notice
CONSULTATIONS
- WCC Rights of Way
- Play Areas
- Stratford-upon-Avon Town Council
- Canal & River Trust
- Environmental Health
- FRM
- Building Regulations
- Stratford-upon-Avon Town Council
- Historic England
- WCC Highways
- Natural England
- Elizabeth Dixon
- Environment Agency
- Environment Agency - Hydraulic Model Review
- Warwickshire Police
- WCC Rights od Way
- Environment Agency
- WCC Flood Risk Management
- Stratford-upon-Avon Town Council
- WCC Highways
CORRESPONDENCE
DECISIONS
PLANS
- Draft Construction Management Plan
- RT-MME-154220 Part 1
- RT-MME-154220 Part 2
- RT-MME-154220 Part 3
- RT-MME-154220 Part 4
- RT-MME-154220 Part 5#
- RT-MME-154220 Part 6
- STRAT-LP Redline Boundary Rev 2
- STRAT-LP-06-1 Proposed Elevations 03
- STRAT-LP-07-5 Area Adjacent to Leisure Centre Car Park
- STRAT-LP-08-5 Replacement Footbridge and Associated Ramp
- STRAT-LP-09-4 Bridgefoot Park-Marina Access
- 12018-001 Fishermans Car Park Access
- 21500-21-01 Topographic Site Survey Central
- 21500-21-01 Topographic Site Survey North
- 21500-21-01 Topographic Site Survey South
- 1. Impervious are plan-pre-proposal
- 2. Impervious are plan-post-proposal
- 3. Exceedance flows- post proposalV2
- 4. Exceedance flows- post proposalV2
- STRAT-DD-24-T Package 6 Construction Details
- STRAT-LP-01-8 Riverside North
- STRAT-LP-03-4 Proposed Elevations 01
- STRAT-LP-04-6 Reedbed and Swales
- STRAT-LP-05-5 Proposed Elevations 02
- STRAT-LP-010-T Rev A
- 280 Stratford Riverside - Northern Area Package Division Rev 1
- STRAT-DD-010 -T - Rev B Footbridge L Detailed Design
- STRAT-DD-17 T-2 Masterplan Package 5
- STRAT-DD-24-T - Rev B Package 6 Construction
REPORTS
SUPERSEDED
- STRAT-LP-01-6 Riverside North
- STRAT-LP-03-2 Proposed Elevations 01
- STRAT-LP-04-4 Reedbed and Swales
- STRAT-LP-05-2 Proposed Elevations 02
- STRAT-LP-04-5 Reedbed and Swales
- STRAT-LP-03-3 Proposed Elevations 01
- STRAT-LP-05-3 Proposed Elevations 02
- STRAT-LP-01-7 Riverside North
- 280 Stratford Riverside - Northern Area Package Division
- Package 6 Specification
![Go Home](/eplanningviewer/lib/openseadragon/images/home_rest.png)
![Zooming in](/eplanningviewer/lib/openseadragon/images/zoomin_rest.png)
![Zooming out](/eplanningviewer/lib/openseadragon/images/zoomout_rest.png)
![rotate left](/eplanningviewer/lib/openseadragon/images/rotateleft_rest.png)
![rotate right](/eplanningviewer/lib/openseadragon/images/rotateright_rest.png)
![Enable Full Screen mode](/eplanningviewer/lib/openseadragon/images/fullpage_rest.png)
![First Page](/eplanningviewer/lib/openseadragon/images/first_rest.png)
![Previous Page](/eplanningviewer/lib/openseadragon/images/previous_rest.png)
![Next Page](/eplanningviewer/lib/openseadragon/images/next_rest.png)
![Last Page](/eplanningviewer/lib/openseadragon/images/last_rest.png)
![Save page as a JPG](/eplanningviewer/lib/openseadragon/images/save_rest.png)
![Download the document](/eplanningviewer/lib/openseadragon/images/download_rest.png)
{{PageListing}}