{{ MaintenanceDetail }}
Documents such as Excel files (.xls,Xlsx,Xlsm) will need to be downloaded to view please check your download folder
Please note This system only works on modern browsers such as Edge,Chrome,Firefox and Safari (Apple devices)
To download a document use the button. Note: Documents that contain a large number of pages can take some time to process!
APPLICATION
- APPLICATION FORM
- Statement of Community Involvement (May 2019)
- CIL Form 2C
- Accompanying letter 31.5.19
- PLANNING STATEMENT
- Design Strategy Appendix (TAY0357 Appendix v.4)
- Design, Quality and Compliance Statement (Ref. TAY0357 Design Strategy v.7)
- Agent letter revised description of development (11.9.19)
- Agent covering letter for Amendments (9.9.19)
CONDITIONS 002
CONDITIONS 003
- Application Form.
- Covering Letter from agent dated 09.01.2020.
- SUPERSEDED GA and Plant Schedule Dwg No: 001.
- SUPERSEDED Soft Landscpae Proposals Dwg No: 002.
- Officer Comments To Agent 20.01.2020
- emails Agent 18.2.20
- SUPERSEDED GA and Plant Schedule Dwg No. 001 Rev A
- SUPERSEDED Soft Landscape Proposals Dwg No. 002 Rev A
- SUPERSEDED LA 4081 001 GA and Plant Schedule Rev B
- LA 4081 002 Soft Landscape Proposals Rev B
- LA 4081 001 Phase 2C GA and Schedule Rev B[2]
- DISCN/00018/20 Decision Notice
CONSULTATIONS
- Environment Agency 26.6.19
- Gaydon Parish Council (3.7.19)
- Historic England (3.7.19)
- WCC Flood Risk Management 10.07.2019
- WCC Flood Risk Management 10.07.19 (part 2)
- Highways England 15.07.2019
- Natural England (16.7.19)
- Warwickshire Police (17.7.19)
- WCC Rights of Way (17.7.19)
- WCC Rights of Way (18.7.19)
- WCC Ecology (18.7.19)
- SDC Environmental Health (31.7.19)
- WCC Ecology (25.7.19)
- Play Equipment (20.8.19)
- Foresty Commission England (22.8.19)
- WCC Rights of Way (25.9.19)
- WCC Rights of Way (23.10.19)
CORRESPONDENCE
DECISIONS
OFFICER DOCS
PLANS
- Phase 2a - 21901-110-PH2A-GA GREEN CORRIDOR 01&02-RevC
- 21901-107-MATERIALS AND FURNITURE--PH2A-2C-RevE
- 21901-100-COLOURED LANDSCAPE MASTERPLAN-RevD
- 21901-101-KEY PLAN PH2A-2C-RevH
- 21901-104-SECTIONS- A-D-RevD
- 21901-107-MATERIALS AND FURNITURE--PH2A-2C-RevE
- 21901-108A-PLANT STRATEGY-PH2A-2C-RevE
- 21901-108B-PLANT STRATEGY-PH2A-20-RevA
- 21901-109-PROW KEY PLAN-RevE
- 21901-210-PH2C-GA GREEN CORRIDORS 6-9-RevD
- 21901-211-PH2C-GA CENTRAL CORE LEAP-RevD
- 21901-212-PH2C-NEAP& COMMUNITY GARDEN-RevD
- 21901-213-PH2C-MATERIALS-CENTRAL CORE LEAP-RevD
- 21901-214-PH2C-PLAY EQUIP- CENTRAL CORE LEAP-RevD
- 21901-215-PH2C- MATERIALS NEAP-RevD
- 21901-216-PH2C-PLAY EQUIP NEAP-RevD
- BWA01- PL001 Rev C - Site Location Plan
SUPERSEDED
- BWA01 PL001-Rev B - Location Plan
- Drawing Schedule v2(1)
- 20144/LDP/01 - Landscaping Delivery Plan Phase 2C
- 21901-100-RevB - COLOURED LANDSCAPE MASTERPLAN
- 21901-101-RevC - KEY PLAN PH2A-2C
- 21901-104-RevB - SECTIONS A-D
- 21901-107-RevB - MATERIALS AND FURNITURE-PH2A-2C
- 21901-108-RevB - PLANTING STRATEGY -PH2A-2C
- 21901-210-RevB - General Arrangement GREEN CORRIDORS 6-9 - PH2C
- 21901-211-RevB - General Arrangement CENTRAL CORE LEAP - PH2C
- 21901-212-RevB - General Arrangement NEAP & COMMUNITY GARDEN PH2C
- 21901-213-RevB - MATERIALS-CENTRAL CORE LEAP PH2C
- 21901-214-RevB - PLAY EQUIPMENT- CENTRAL CORE LEAP PH2C-
- 21901-215-RevB - MATERIALS NEAP PH2C
- 21901-216-RevB - PLAY EQUIP NEAP PH2C
- 21901-100-COLOURED LANDSCAPE MASTERPLAN-RevC
- 21901-107-MATERIALS AND FURNITURE--PH2A-2C-RevC
- 21901-108-PLANT STRATEGY-PH2A-2C-RevC
- General Arrangement Green Corridor 6 - 9 Phase 2C Dwg No. 21901/210 Rev C
- General Arrangement Central Core LEAP Phase 2C Dwg No. 21901/211 Rev C
- General Arrangement NEAP & Community Garden Phase 2C Dwg No. 21901/212 Rev C
- Materials - Central LEAP Dwg No. 21901-213 Rev C
- Play - Central LEAP Dwg No. 21901-214 Rev C
- Materials - NEAP Dwg No. 21901-215 Rev C
- Play - NEAP Dwg No. 21901-216 Rev C
- 21901-101-KEY PLAN PH2A-2C-RevF
- 21901-104-SECTIONS- A-D-RevC
- 21901-109-PROW KEY PLAN-RevD
- 21901-100-COLOURED LANDSCAPE MASTERPLAN-RevD
- 21901-101-KEY PLAN PH2A-2C-RevH
- 21901-104-SECTIONS- A-D-RevD
- 21901-108A-PLANT STRATEGY-PH2A-2C-RevD
- 21901-108B-PLANT STRATEGY-PH2A-2C
- 21901-109-PROW KEY PLAN-RevE
- 21901-210-PH2C-GA GREEN CORRIDORS 6-9-RevD
- 21901-211-PH2C-GA CENTRAL CORE LEAP-RevD
- 21901-212-PH2C-NEAP& COMMUNITY GARDEN-RevD
- 21901-213-PH2C-MATERIALS-CENTRAL CORE LEAP-RevD
- 21901-214-PH2C-PLAY EQUIP- CENTRAL CORE LEAP-RevD
- 21901-215-PH2C- MATERIALS NEAP-RevD
- 21901-216-PH2C-PLAY EQUIP NEAP-RevD
- Drawing Schedule v8
- Drawing Schedule v8
- 21901-108A-PLANT STRAT-Rev E
{{PageListing}}