{{ MaintenanceDetail }}
Documents such as Excel files (.xls,Xlsx,Xlsm) will need to be downloaded to view please check your download folder
Please note This system only works on modern browsers such as Edge,Chrome,Firefox and Safari (Apple devices)
To download a document use the button. Note: Documents that contain a large number of pages can take some time to process!
APPLICATION
- Application forms
- Certificate B notifications
- Agent covering letter
- Air Quality Assessment Report
- Arboricultural Impact Assessment and Tree survey
- Climate change and Sustainability Energy Statement
- Ecological Assessment
- Flood Risk Assessment
- Geo Environmental Report
- Geo-Physical Survey Report
- Heritage Desk based assessment
- Landscape and Visual Appraisal
- Landscape Strategy
- Noise Assessment Report
- Planning Statement
- Retail Assessment
- Service Supply Statement
- Soils and Agricultural use
- Transport Assessment
- Waste Minimisation Statement
- Design and Access Statement
- Biodiversity Impact Assessment
- Archaeological Evaluation
- Landscape Scheme
- Application Form - DISCE/00220/18
CONDITIONS
CONDITIONS 002
CONDITIONS 005
CONDITIONS 009
- Cover Letter
- Application Form
- Section 278 Dedicated Left Turn Lane General Arrangement Dwg No. 22553_03_020_300 Rev C
- Section 278 Dedicated Left Turn Lane Site Clearance Dwg No. 22553_03_030_300 Rev A
- Section 278 Dedicated Left Turn Lane Setting Out Dwg No. 22553_03_050_300 Rev B
- Section 278 Dedicated Left Turn Lane Surface Finishes Dwg No. 22553_03_060_300 Rev B
- Section 278 Dedicated Left Turn Lane Eastern Approach Ads Details Dwg No. 22553_03_060_301
- Section 278 Dedicated Left Turn Lane Catchments Dwg No. 22553_03_070_300
- Section 278 Dedicated Left Turn Lane Road Profile And Cross Sections Dwg No. 22553_03_110_300 Rev B
- Planning Officer Response 07.01.2019
- WCC Highways Response 08.04.2019
- Further Info request 10.04.19
- Application form
- Covering Letter dated 30 May 2022
- Dedicated Left Turn Lane General Arrangement Dwg No. 22553_03_020_300 Rev E
- Street Lighting Layout Dwg No. 22553_03_100_300 Rev B
- Dedicated Left Turn Lane Vehicle Tracking Dwg No. 22553_03_110_302 Rev A
- Dedicated Left Turn Lane Site Clearance Dwg No. 22553_03_200_300
- Dedicated Left Turn Lane Setting Out Dwg No. 22553_03_200_301
- Dedicated Left Turn Lane Contour Plan Dwg No. 22553_03_050_300
- Dedicated Left Turn Lane Road Profile and Cross Sections Dwg No. 22553_03_200_303
- Dedicated Left Turn Lane Catchments Dwg No. 22553_03_500_300
- Dedicated Left Turn Lane Earthworks Plan Dwg No. 22553_03_600_300
- Dedicated Left Turn Lane Pavement Construction Dwg No. 22553_03_700_300
- Dedicated Left Turn Lane G.A and Elevations Dwg No. 22553_05_150_01.1 Rev C
- Highway Retaining Wall for Dedicated Left Turn Lane Sections Dwg No. 22553_05_150_01.2 Rev C
- Highway Retaining Wall for Dedicated Left Turn Lane Reinforcement Dwg No. 22553_05_150_01.3 Rev B
- Design Summary Rev A by Consulting Development Engineers dated 14 July 2021
- DISCN/00495/18 Decision Letter (Cond 9) 13.04.22
- WCC Highways Response 27.06.2022
- DISCN/00274/22 Decision Notice (Cond 9) 05.07.22
CONDITIONS 010
- Application Form
- Section 278 Galanos Roundabout General Arrangement Dwg No. 22553_03_020_400 Rev B
- Section 278 Galanos Roundabout Site Clearance Dwg No. 22553_03_030_400 Rev B
- Section 278 Galanos Roundabout Setting Out Dwg No. 22553_03_050_400 Rev A
- Section 278 Galanos Roundabout Setting Out Dwg No. 22553_03_050_401 Rev A
- Section 278 Galanos Roundabout Surface Finishes Dwg No. 22553_03_060_400
- Section 278 Galanos Roundabout Impermeable Areas Plan Dwg No. 22553_03_070_400 Rev A
- Section 278 Galanos Roundabout Construction Details Dwg No. 22553_03_080_02 Rev B
- Section 278 Galanos Roundabout Cross Sections Dwg No. 22553_03_110_400 Rev A
- Section 278 Galanos Roundabout Road Long Sections Dwg No. 22553_03_110_401 Rev A
- Planning Officer Response 07.01.2019
- WCC Highways Response 08.04.2019
- Further Info request 10.04.19
- Application form
- Covering Letter dated 30 May 2022
- General Arrangement Dwg No. 22553_03_020_400 Rev D
- Street Lighting Layout Dwg No. 22553_03_100_400 Rev A
- Vehicle Tracking Dwg No. 22553_03_110_402
- Site Clearance Dwg No. 22553_03_200_400
- Setting Out Dwg No. 22553_03_200_401
- Setting Out Dwg No. 22553_03_200_402
- Road Long Sections Dwg No. 22553_03_200_403
- Impermeable Areas Plan Dwg No. 22553_03_500_400
- Earthworks Dwg No. 22553_03_600_400
- Cross Sections Dwg No. 22553_03_600_401
- Pavement Construction Dwg No. 22553_03_700_400
- Kerbs and Paved Areas Dwg No. 22553_03_1100_400
- Traffic Signs and Road Markings Dwg No. 22553_03_1200_400
- DISCN/00493/18 Decision Letter (Cond 10) 13.04.22
- WCC Highways response 23.06.22
- DISCN/00272/22 Decision Notice 23.06.22
CONDITIONS 011
CONDITIONS 013
- Cover Letter
- Application Form
- Construction Management Plan prepared by Taylor Wimpey
- Temporary Sales Layout Dwg No. 20139/SL/01 A
- Sales Area Layout Dwg No. 20139/SL/02 A
- SWMP Process prepared by Taylor Wimpey
- Build Phase Plan (PHASE 2) 20139-BPP-02E (Condition 13)
- Reserved Matters Phasing Plan 20139-PL-04E (condition 13)
- 20138-BPP-01E Build Phase Plan (PHASE 1)(condition 13)
- Build Phase Plan (Phase 1) Dwg No. 20139/BPP/01F
- Build Phase Plan (Phase 2) Dwg No. 20139/BPP/02F
- Construction Management Plan Rev B (14.11.17) prepared by Agent
- Construction Management Plan prepared by Taylor Wimpey
- Agent Correspondence
- Highways Response 05.04.2018
- CMS rev D
- Reserved Matters Phasing Plan 20139/PL/04E
- SWMP Process
- Build Phase Plan Dwg No. 20139-200-BP(C)
- Southam Routing Plan
- WCC Highways Response 15.05.2018
- Construction Management Plan Rev D (Amended) prepared by Agent
- 20139 Southam Routing Plan
- WCC Highway Response 30.05.2018
- DISCN/00002/18 Decision Notice
CONDITIONS 014
- Cover Letter (condition 14)
- Application Form (condition 14)
- Phase I Review And Phase II Strategic Geo-Environmental Assessment prepared by GEG (condition 14)
- Environmental Health Response (20.02.2018)
- Environmantal Health Response 15.03.2018
- Wardell Armstong Letter Report - Site Investigation rec d 25.4.18
- Environmental Health Response 02.05.2018
- DISCE/00001/18 Decision Notice
CONDITIONS 015
- Cover Letter (condition 15)
- Application Form (condition 15)
- Environmental Health Response (20.02.2018)
- Remediation Strategy BM11386_REP-001
- Covering Letter 25.4.18 (Cond 15)
- Remediation Strategy Report Ref. JL/AG/BM11386/LET-002
- Environmental Health Response 10.05.2018
- Officer Response 24.05.2018
- DISCE/00220/18 Decision Notice
CONDITIONS 017
- Covering Letter
- ApplicationForm
- FINAL ANALYTICAL TEST REPORT
- SDC Environmental Services response 22.6.18
- Decision Letter 27.6.18 (cond 17) DISCE/00047/18
- Application form no personal data.
- Covering letter application to discharge condition 17 from Turley.
- Site Investigation and Asbestos Validation Sampling Report Ref BM11386-003
- Environmental Health Response 17.07.2018
CONDITIONS 019
CONDITIONS 020
CONDITIONS 021
- Application Form 5/4/2017 (Condition 21) DISCN/00135/17
- Condition 21 - Covering Letter
- Condition 21 External Plan - CCTV
- Condition 21 - CCTV Specification Document Ref 10010.02
- Application Form (Condition 22) DISCE/00052/17
- Enviroment Agency Response
- DISCN-00135-17 Decision Letter (Cond 21) 07.06.17
CONDITIONS 022
CONDITIONS 023
- Cover Letter
- Application Form
- Severn Trent Water AMP6 Design And Build Requisition Dwg No. A6W/12208/04/03/90 (1/2)
- Severn Trent Water AMP6 Design And Build Requisition Dwg No. A6W/12208/04/03/90 (2/2)
- Water Supply Request – Fire Hydrant Requirements prepared by Agent
- WCC Fire and Rescue Service response 23.1.18
CONDITIONS 024
- Cover Letter (condition 24)
- Application Form (condition 24)
- Phase 1 S38 Street Lighting Layout Dwg No. 22553_02_100_01.1 Rev M (condition 24)
- Phase 1 S38 Street Lighting Layout Dwg No. 22553_02_100_01.2 Rev L (condition 24)
- Phase 2 S38 Street Lighting Layout Dwg No. 22553_02_100_01.3 Rev K (condition 24)
- Phase 2 S38 Street Lighting Layout Dwg No. 22553_02_100_01.4 Rev K (condition 24)
- SDC Officer comments 11.01.18
- Env Health Response 16.01.18
- WCC Ecology Response 25.1.18
- Agent Response
- Amended S38 Street Lighting Plan
- Ecology Response 8.02.2018
CONDITIONS 025
- Cover Letter (condition 25)
- Application Form (condition 25)
- Design Criteria for Storm Sewers prepared by M-EC (condition 25)
- SUDS Management Strategy prepared by Taylor Wimpey (condition 25)
- Drainage Report (22553/06-17/4980 Rev A) (condition 25)
- Engineering Layout (Drawing Ref: 22553_02_070_01 Rev M) (condition 25)
- Phase 1 Engineering Layout (Drawing Ref: 22553_02_070_02 Rev S) (condition 25)
- Phase 2 Engineering Layout (Drawing Ref: 22553_02_070_03 Rev N (condition 25)
- Phase 1 Flood Routing Plan (Drawing Ref: 22553_02_070_04.1 Rev G)(condition 25)
- Phase 2 Flood Routing Plan (Drawing Ref: 22553_02_070_04.2 Rev E)(condition 25)
- Drainage Construction Details Sheet 1 of 2 (Drawing Ref: 22553_02_080_02.1 Rev A)(condition 25)
- Drainage Construction Details Sheet 2 of 2 (Drawing Ref: 22553_02_080_02.2 Rev A)(condition 25)
- Flow Control Chamber Construction details Drawing Ref: 22553_02_080_04 Rev A)(condition 25)
- Phase 1 Site Cross Sections (Drawing Ref: 22553_02_110_01.1 Rev M)(condition 25)
- Phase 2 Site Cross Sections (Drawing Ref: 22553_02_110_01.2 Rev H)(condition 25)
- Phase 1 Outfall Swale Layout and Profiles (Drawing Ref: 22553_02_110_01.3 Rev B)(condition 25)
- Agent Correspondence (07.02.2018)
- Drainage Report 22553/06-17/4980 Rev B prepared by M-E-C
- WCC Flood Risk Management Response
- FRM Response 19.02.2018
- Agent And LLFA Response 13.02.2018
- SUPERCEDED Engineering Layout Sheet 1 OF 3 Dwg No. 22553_02_020_04.1 Rev O
- SUPERCEDED Engineering Layout Sheet 2 OF 3 Dwg No. 22553_02_020_04.2 Rev N
- SUPERCEDED Engineering Layout Sheet 3 OF 3 Dwg No. 22553_02_020_04.3 Rev N
- Balancing Pond And Swale Details Sheet 2 Of 2 Dwg No. 22553_02_050_02.2 Rev C
- Engineering Layout Sheet 1 Of 3 Dwg No. 22553_02_020_04.1 Rev P
- Engineering Layout Sheet 2 Of 3 Dwg No. 22553_02_020_04.2 Rev O
- Engineering Layout Sheet 3 Of 3 Dwg No. 22553_02_020_04.3 Rev O
- Surface Water Outfall Plan Dwg No. 22553_02_020_08
- Flood Route Plan Sheet 1 Of 3 Dwg No. 22553_02_070_08.1 Rev D
- Flood Route Plan Sheet 2 Of 3 Dwg No. 22553_02_070_08.2 Rev D
- Flood Route Plan Sheet 3 Of 3 Dwg No. 22553_02_070_08.3 Rev D
CONDITIONS 026
- Cover Letter
- Application Form
- Landscape and Ecology Management Plan Ref: 5169-LEMP-PM-vf2 (condition 26)
- Ecology Response
- Landscape Management Schedule LDS407K-LMS prepared by LDS
- WCC Ecology Response (16.03.2018)
- Agent Response 27.03.2018
- Agent Correspondence 27.03.2018
- Landscape Management Schedule LDS407(M)-LMS prepared by LDS
- WCC Ecology Response 28.03.2018
- Ecology Response 29.03.2018
CONDITIONS 027
CONDITIONS 028
CONDITIONS 030
- Cover Letter (condition 30)
- Application Form (condition 30)
- Tree Works - Phase 1 Drawing Ref: LDS407-12F prepared by Landscape Design Solutions and dated 18.12.17 (condition 30)
- Tree Works - Phase 2 Drawing Ref: LDS407-12F prepared by Landscape Design Solutions and dated 18.12.17
- Tree Works - Phase 1 Dwg No. LDS407-12J
- Tree Works - Phase 2 Dwg No. LDS407-12H
- Officer Response 09.02.2018
CONDITIONS 032
- Cover Letter (condition 32)
- Application Form (condition 32)
- Landscape 1 of 8 (Phase 2) Drawing Ref: LDS407-02I dated 15.12.17
- Landscape 5 of 8 (Phase 2) Drawing Ref: LDS407-06I dated 15.12.17 (condition 32)
- Landscape Design Master (Phase 2) Drawing Ref: LDS407-10I dated 15.12.17 (condition 32)
- Landscape Specification LDS407(I)-LS (PHASE 2) 18.12.17
- Consultant Louisa Hill Response 23.1.18
- Landscape Maintenance Dwg No. LDS407-11L
- Landscape 1 Of 8 (Phase 1) Dwg No. LDS407-02N
- Landscape 1 Of 8 (Phase 2) Dwg No. LDS407-02N
- Landscape Design Master (Phase 1) Dwg No. LDS407-10N
- Landscape Design Master (Phase 2) Dwg No. LDS407-10N
CONDITIONS 033
- Application Form (condition 33)
- Cover Letter (condition 33)
- SUPERCEDED Materials Layout (Phase 2) Drawing Ref: 20138/ML/01F (condition 33)
- Highway Construction Details Drawing Ref: 22553_02_080_01 Rev A dated 7.11.17 (condition 33)
- Material Samples (Tiles) rec d 26.1.18
- SDC Officer Response/Agent Correspondance
- Materials Layout (Phase 2) Drawing Ref: 20138/ML/01_RevG rec d 2.2.18
- Material Samples (Wienerberger Bricks) rec d 7.2.18
- Material Brick Samples Samples (14.03.2018)
- Officer Correspodence (08.02.2018)
- Officer Correspondence (15.03.2018)
- Sample Photograph
- Sample Photograph
- Officer Comments 11.05.2018
- Materials Layout (Phase 2) Dwg No. 20138/ML/01H
- DISCN/00010/18 Decision Notice
- Brindle Paver
CONSULTATIONS
- Sport England
- Warwickshire Police
- Coal Authority
- Cllr Chris Williams
- Historic England
- Archeaological - 18.1.16
- WCC - Fire and Rescue
- Highways England
- Natural England
- South Warwickshire Foundation Trust (NHS)
- Southam Town Council
- Warwickshire Police
- Napton Parish Council
- Napton Parish Council
- Warwickshire Wildlife Trust
- Sport England
- Environment Agency
- WCC Rights of Way
- NHS South Warwickshire Clinical Commissioning Group
- Place Partnership on Behalf of Warwickshire and West Mercia Police
- Severn Trent Water
- Cllr Tony Bromwich
- Warwickshire Police Road Safety
- WCC Archaeology
- LLFA (FRM)
- LLFA (FRM) Comments
- WCC Ecology
- WCC Highways
- WCC Infrastructure
CORRESPONDENCE
DECISIONS
- Notice of Decision 16/12/16
- Decision Letter (condition 23)
- Decision Notice Condition 27
- Decision Notice Condition 30
- DISCE/00002/18 Decision Notice (Conds 15 & 19)
- Decision Notice DISCN/00003/18 (Cond 24)
- DISCN/00011/18 Decision Letter (Cond 32)
- Section 106 Agreement 16/12/2016
- Decision Letter 27.6.18 (cond 17) DISCE/00047/18
- DISCE/00061/18 Decision Notice (Cond 17)
- DISCN/00006/18 Decision Notice (Cond 26)
- DISCN/00283/18 (Cond 36) Decision Notice
- DISCN/00005/18 (Cond 25) Decision Notice
- DISCN/00493/18 Decision Letter (Cond 10) 13.04.22
- DISCN/00495/18 Decision Letter (Cond 9) 13.04.22
- DISCN/00272/22 Decision Notice (Cond 10) 23.06.22
- DISCN/00274/22 Decision Notice (Cond 9) 05.07.22
- DISCE/00084/17 Decision Letter (Cond 20) 08.08.17
- DISCE/00052/17 Decision Letter (Cond 22) 07.06.17
- Decision Letter
OFFICER DOCS
PLANS
REPORTS
SECTION 106
- Section 106 Agreement
- Daventry Road South Affordable Housing Spec
- Red Line Location plan
- Specificaiton Appendix A
- Approval Details for Planning Obligations
- Application Form for Affordable Housing Specification
- Affordable Housing Specification June 2017
- Section 106 Agreement
- Application Form
- Appendix 1 - Managed Areas Plan - Southam Flying Fields
- Appendix 2 - LEMP - Southam Flying Fields
- Southam Flying Fields Management Plan August 2024
- Appendix 3 - Landscape Specifications - Southam Flying Fields
- Appendix 4 - SUDS - Southam FLying Fields
- Appendix 5 - Play Areas - Southam Flying Fields
- S106 reponses - Southam Flying Fields
- Southam FLying Fields Certified Completed Transfer_Redacted
- LEAP Information
- MUGA Information
- Application Form
- Southam Flying Fields Management Plan August 2024
- Appendix 1 - Managed Areas Plan - Southam Flying Fields
- Appendix 2 - LEMP - Southam Flying Fields
- Appendix 3 - Landscape Specifications - Southam Flying Fields
- Appendix 4 - SUDS - Southam FLying Fields
- Appendix 5 - Play Areas - Southam Flying Fields
- S106 reponses - Southam Flying Fields
- Southam FLying Fields Certified Completed Transfer_Redacted
- LEAP Information
- MUGA Information
- Western Landscape Buffer
- Landscape Specifications
- Landscape Specifications
SECTION 106A
{{PageListing}}