{{ MaintenanceDetail }}
Documents such as Excel files (.xls,Xlsx,Xlsm) will need to be downloaded to view please check your download folder
Please note This system only works on modern browsers such as Edge,Chrome,Firefox and Safari (Apple devices)
To download a document use the button. Note: Documents that contain a large number of pages can take some time to process!
AMENDMENTS
- Highway access drawing - roundabout opposite AML
- Design and Access Statement Addendum
- Retail Addendum Note
- Agricultural Land Classification Study - Amended
- Response to Natural England re Soils
- Applicant s amendments letter
- ES Appendix 9.1 - Transport Assessment (Part 1) (Amended)
- ES Appendix 9.1 - Transport Assessment (Part 2)
- ES Appendix 11.1 Noise contour details and indicative bund details (Amended)
- ES Appendix 12.1 Flood Risk Assessment (Amended)
- ES Appendix 14.1 Built Heritage Statement (Amended)
- ES Appendix 15.1 Ecological Survey Report (Amended)
- ES Appendix 15.3 Ecology Technical Response Note (Additional)
- ES Appendix 15.2 Biodiversity Impact Assessment (Additional)
- ES Appendix 16.1 LVIA - Description of views from residential receptors and Appendix 16.2 Verified View (Additional)
- ES Volume 1 Addendum
- Technical Note - Sustainability & Renewable Energy
- Affordable Housing Statement
- Applicant s clarification of additional noise details
- Background Noise Assessment
- Technical Note: Noise Impact Assessment
- Amended noise chapter of ES Addendum
- Amended Noise Appendices of ES Addendum
- Applicant s clarification regarding additional transport information submitted
- DAS Addendum and applicant s clarification
- Applicant s clarification regarding additional transport information
- Response to Road Safety Audit for off site junction improvements
- Technical Note:Local Village Impacts
- Technical Note: Update regarding access strategy
- Technical Note: Confidence Interval Analysis
- B4100 treatment to reflect 30mph zone
- Affordable Housing Statement
- Brookbanks letter 5.4.16 - addressing various highway matters
- Transport Assessment Rev 6 (Consolidated)
- Technical Note: Transport Modelling Update - Sensitivity Modelling for Warwick District development (17 March 2016)
- Design Matrix (March 2016)
APPLICATION
- Agent covering letter
- Design and Access Statement
- Energy Strategy Statement
- Environmental Statement Vol 1
- Green Infrastructure Study
- Environmental Statement Non Technical summary
- Planning Statement
- Retail Assessment
- Service Supply Statement
- Statement of Community Involvment
- Waste Assessment
- Environmental Statement Vol 2 Vol2A (Full version - individual chapters below)
- Environmental Statement Appendices - List of Appendices & Chapters 1 Introduction, 2 Methodology, & 5 Proposed development
- Environmental Statement Appendices - Chapters 9 Air Quality & 10 Noise
- Environmental Statement - Appendix - Chapter 13 Archaeology and Cultural Heritage
- Environmental Statement - Appendix 14 - Ecology
- Environmental Statement Appendix - Chapter 11 - Hydrology and Flood Risk
- Environmental Statement Appendix - Chapter 12 - Ground conditions
- Environmental Statement Appendix - Chapter 8 Transport, Accessibility and Movement 8.1 Transport Assessment
- Environmental Statement - Chapter 15 - Landscape and Visual Impact Assessment (1 of 20) Appendices 15.1 - 15.11 (Part only of 15.11)
- Environmental Statement - Chapter 15 - Landscape and Visual Assessment (2 of 20) - Appendix 15.11 (part only)
- Environmental Statement Appendices - Chapter 15 - Landscape and Visual Impact - Remainder of Appendix 15.11 & Appendix 15.12 (3a of 20)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (3b of 20) Appendix 15.12 - Draft Tree Protection Plan (1)
- Environmental Statement Chapter 15 - Landscape and Visual Impact (3c of 20) Appendix 15.12 Draft Tree Protection Plan (2)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (3d of 20) Appendix 15.12 Draft Tree Protection Plan (3)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (3e of 20) Appendix 15.12 - Draft Tree Protection Plan (4)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (3f of 20) Appendix 15.12 Draft Tree Protection Plan (5)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (3g of 20) Appendix 15.12 - Draft Tree Protection Plan (6)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (3h of 20) Appendix 15.12 - Draft Tree Protection Plan (7)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (3i of 20) Appendix 15.12 - Draft Tree Protection Plan (8)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (4 of 20) End of Appendix 15.12, & Appendices 15.13 & 15.14 (part)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (5 of 20) - Appendix 15.14 (part)
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (6 of 20) Fig. 15.1
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (7 of 20) Fig. 15.2
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (8 of 20) Fig. 15.3
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (9 of 20) - Fig. 15.4
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (10 of 20) Fig. 15.5
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (11 of 20) Fig. 15.6
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (12 of 20) - Fig. 15.7
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (13 of 20) Table 15.1
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (14 of 20) - Table 15.2
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (15 of 20) Table 15.3
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (16a of 20) Site photos
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (16b of 20) SIte photos
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (16c of 20) Site photos
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (16d of 20) Site photos
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (16e of 20) - Site photos
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (17 of 20) Representative views photos Panels A - E
- Environmental Statement - Chapter 15 - Landscape and Visual Impact 18 of 20 Representative Viewpoint photo Panel F & G
- Environmental Statement - Chapter 15 - Landscape and Visual Impact (19 of 20) Verified views photo panels
- Environmental Statement Chapter 8 Appendix Travel Plan Framework
- Environmental Statement Chapter 14 Appendix 2 Hedgerow Chronology Map
- Environmental Statement Chapter 14 Appendix 3 Hedgerow Impact Map
- Environmental Statement Chapter 14 Appendix 6 Hedgerow Survey data
- Environmental Statement Chapter 14 Appendix 4 Hedgerow Management Plan
- Environmental Statement Chapter 14 Appendix 5 Hedgerow Data Sheet
- Environmental Statement Chapter 15 Verified View Photo V1
- Environmental Statement Chapter 15 Verified View Photo V2
- Environmental Statement Chapter 15 Verified View Photo V3
- Environmental Statement Chapter 15 Verified View Photo V4
- Environmental Statement Appendix - Chapter 13.1 - Archaeological desk based assessment
- Appendix 18 - Woodland Trust response to application 15/0096/OUT
- Application form no personal data.
- Housing Sales Specification
- Landcape and Ecological management Plan (LEMP) fpcr March 2019
- Biodiversity Imapct Assessement
- Housing Sales Specification
- Landcape and Ecological management Plan (LEMP) fpcr March 2019
- Biodiversity Imapct Assessement
- Application Form
- Covering Letter
- S106
- Agent email 29.4.19 + Overall Site Phasing Summary & Affordable Housing Delivery Plan
- Overall Affordable Housing Delivery Plan - 7 January 2020
- SUPERSEDED Biodiversity Impact Assessment - 20/01902/S106
- SUPERSEDED Biodiversity Impact Assessment - 20/01902/S106
- SUPERSEDED Ph2a+2c Landscape And Ecology Management Plan: Phases 2A and 2C Ref edp5292_r008e
- edp592_r007c Biodiversity Impact Assessment (December 2020)
- Revised Biodiversity Impact Assessment Calculations (x3 Excel) December 2020
- Agent covering email 17.12.20
- SUPERSEDED Ph2a+2c LEMP edp5292_r008g (Jan 2021)
- Ph2a+2c LEMP edp5292_r008h (June 2021)
- 1710 Request for approval of Affordable Housing Specification June 2021
- Application Form (DISC/00419/21)
- Cover Letter
CONDITIONS 010
- 10A Covering letter from Claremont Planning Consultancy.
- 10A Geophysical Survey and site location map.
- Trench plan overlaid on draft development concept dwg number:C3429-SK003-LH-17.11.17.
- 10A Condition 10-Phase 1 Identification drawing number: C10 Phase 1.
- 10A Revised Application Form (cond 10) DISC/00313/18 Rec d 25.6.18
- 10B Cover Letter (22.11.18)
- 10B Application Form
- 10B SUDS LLFA response 12.12.18
- 10B WCC Ecology Response (10B) 13.12.2018
- 10B Environment Agency 18.12.2018
- 10B LLFA Response 18.12.2018
- 10B WCC Highways 3.1.19
- 10B(g) Agent response Broadband 16.1.19
- 10B WCC Highways Response 03.01.2019
- 10B WCC Rights Of Way Response 03.10.2019
- 10B Technical Paper prepared by Environmental Economics
- 10B Summary of Phasing & Delivery
- 10B Utilities Statement (19.2.19)
- 10A Cover Letter
- 10A Application Form
- 10A Parameter Plan Access And Movement Dwg no. 00880_PP04 Rev P1
- 10A SUPERSEDED Layout Plan Dwg No. BHSM/P001 Rev M
- 10A SUPERSEDED Layout Plan Dwg No. BHSM/P001 Rev N
- 10A SUPERSEDED Tenure Plan Dwg No. BHSM/P008 Rev E
- 10A Gas Governor Details Dwg No. P270
- 10A Type B V1 Floor Plans And Elevations Dwg No. P210 Rev A
- 10A Type B V2 Floor Plans And Elevations Dwg No. P211 Rev A
- 10A Apartments Ground And First Floor Plans Dwg No. P240 Rev B
- 10A DAS Excerpt Layout Pgs 21 - 22
- 10A DAS Excerpt Pgs 23 - 25 and 29
- 10A DAS Excerpt Pgs 30 - 31
- 10A DAS Excerpt Pgs 55 - 58
- 10A Phase One Site Access General Arrangement Dwg No. 10192-100-241 Rev C
- 10A Type D V1 Floor Plans And Elevations
- 10A SO6 V1-2 Floor Plans And Elevations
- Parameter Plan Access And Movement Dwg No. 00880_PP04 Rev P1
- 10B Open Space Plan To Discharge Planning Condition 10B(e) Dwg No. 003 Rev 08
- 10B Infrastructure Plan To Discharge Planning Condition 10B(h) Dwg No. 005 Rev 06
- 10B Land Use Plan Dwg No. 001 Rev 05
- 10B Explanatory Note (Received 5.4.19)
- 10B Phasing & Delivery Plans (recieved 5.4.19) - 001Rev05; 002Rev08; 003Rev08; 004Rev07; 005Rev06; 006Rev05
- Phasing Plan To Discharge Planning Conditions 10B (a) And (b) (dated 02.04.2019) Dwg No. 002 Rev 08
- Parameter Plans to Discharge Planning Conditions 10B (f) And (i) Dwg No. 004 Rev 07
- Accomodation And Delivery Schedule Rev 2 dated 04.04.2019 prepared by Agent
- Revised Explanatory Note Rev 4 dated February 2019 prepared by Nexus Planning
- 10B DISCN/00453/18 Decision Notice 9.4.19
- C10A PH1 Condition 10 - Phase 1 Identification Drawing Dwg No. C10 Phase 1 DWG Rev P1
- C10A(a) PH1 Accomodation And Delivery Schedule prepared by Agent
- C10A(a) PH1 Sales Specification HA Standard prepared by Bellway
- C10A(a) PH1 Tenure Plan Dwg No. BHSM/P008 Rev H
- C10A(a) PH1 GLH New Settlement - Phase 1 Conditions & S106 prepared by Claremont
- SUPERSEDED C10A(d) PH1 Proposed Services prepared by Bellway
- SUPERSEDED C10A(d) PH1 Gas Main Route Dwg No. 3ec65c40-8f5c-4099-ba92-8a1717e76c7f Rev 1.0
- SUPERSEDED C10A(d) PH1 Gas Main Route Dwg No. 15b8252b-a2b9-43cc-8ad8-c36b3b714779 Rev 1.0
- SUPERSEDED C10A(d) PH1 Gas Main Route Dwg No. 6d6a671d-868a-4457-a52d-90b45c71eb0a Rev 1.0
- SUPERSEDED C10A(d) PH1 Gas Main Route Dwg No. a0744a37-4e5f-415e-8570-9126ac73ba79 Rev 1.0
- C10A(d) PH1 Underground Gas Construction Dwg No. GTC-G-Orpheus 4-10x6x10 Generic 107
- C10A(d) PH1 Underground Gas Construction Dwg No. GTC-G-Orpheus 4-10x6x10 Generic 106
- Ph1 C10A(d) Proposed Services Rev A (2.7.19)
- Ph1 C10A(d) Proposed Services Rev A (2.7.19)
- DISC/00065/19 Decision Notice
- Application Form (DISC/00180/20)
- 10B Revised Phasing & Delivery Plan Cover Letter (DISC/00180/20)
- 10B Revised Phasing Plan Dwg No. 002 Rev 09 amended to change north/west area from2e to 2d (DISC/00180/20)
- 10b Revised Accommodation and Delivery Schedule dated 22.12.20
- 10b Phase 2c Landscaping Delivery Plan 20144/LDP/O1B (recieved 23.12.20)
- 10B Phase 2c Green Infrastructure Delivery Plan (received 23.12.20)
- Officer Response 19.01.2021
- DISC/00180/20 Decision Notice
CONDITIONS 011
- Ph1 11 Electrical Charging Points Dwg No. BHSM/P006
- Ph1 Agent cover letter dated 28.02.19 detailing additional submissions for Cond 11
- Ph1 Energy Supply Technical Paper Version 4 dated 8 January 2019 and prepared by Environmental Economics, rec d 28.02.19
- Ph1 Sustainability Statement dated February 2019 and prepared by JSP Sustainability Ltd, rec d 28.02.19
- GLH Phasing Plan
- SUPERSEDED Car Charging/External Works Layout Parcel C1 Sheet 1 of 2 Dwg No. 17066_EX1
- SUPERSEDED Car Charging/External Works Layout Parcel A2 ·& A4 Sheet 2 of 2 Dwg No. 17066_EX2
- SUPERSEDED External Works: Parcel B1 Dwg No. WD001 Rev B
- SUPERSEDED External Works: Parcel B2 Dwg No. WD002 Rev B
- Kingston Fields, Gaydon (Lighthorne Heath) CEG Development - Electrical Capacity ·& Loading Details
- Ph2a Cover Letter
- SUPERSEDED Proposed Site Layout Dwg No. ME-32-04 P
- Ph2a Email from agent submitting further info (annotations), rec d 04.12.19
- Ph2a Email from agent submitting further info 04.12.19
- Ph2a External Works Parcel B1 Drawing No BWA01 WD001 Rev C, rec d 04.12.19
- Ph2a External Works Parcel B2 Drawing No BWA01 WD002 Rev D, rec d 04.12.19
- Ph2a Parcels A1 + C2 (part) Site Layout Drawing No ME-32-04 Rev R, rec d 04.12.19
- Ph2a Car Charging/External Works Layout Parcel C1 (Sheet 1 of 2) Drawing No 17066 EX1-B, rec d 04.12.19
- Ph2a Car Charging/External Works Layout Parcel A2 and A4 (Sheet 2 of 2) Drawing No 17066 EX2-B, rec d 04.12.19
- Ph2a EV Charging SpecificationPod Point Solo Single Phase Datasheet Issue Ref No PP-D-130042-11 dated January 2019, rec d 04.12.19
- DISC/00468/19 Decision Notice
- DISC/00065/19 Decision Notice
- Application Form.
- SUPERSEDED Covering letter from agent dated 13.01.2020
- SUPERSEDED External Works: Parcel B1 Dwg No: WD001 Rev B.
- SUPERSEDED External Works: Parcel B2 Dwg No: WD002 Rev D.
- Technical Paper produced by Environmental Economics dated 08.01.2020.
- Ph2a Covering letter + Parcel details
- Ph2a Parcels A1+C2(part) Site Layout ME-32-04 Rev R
- Ph2a Parcels A2 A4 (part) 17066-ArchBase-EX2-A2 & A4-B
- Ph2a Parcel B1 BWA01 WD001 Rev C - External Works Parcel B1
- Ph2a Parcel B2 BWA01 WD002 Rev D - External Works Parcel B2
- Ph2a Parcel C1 17066_Archbase-EX1-C1-B
- Ph2a Covering letter 13.01.2020
- Ph2a Timetable for Delivery Agent email 10.6.20
- DISC/00013/20 Decision Notice
- Phase 2b/Parcel C2 - Application Form (DISC/00179/22 Phase 2b/Parcel C2 )
- Phase 2b/Parcel C2 - Covering Letter
- Superseded 2b C2 Sustainability Statement Gaydon Parcel C2 dated 29 April 2022 prepared by Environmental Economics, rec d 09.05.22
- 2d Cover Letter
- 2d Application Form
- 2e Sustainability Statement Gaydon Parcels A3 & B6 dated 09.05.2022 Version 1 prepared by environmental economics
- 2d - Car Charging Plan Parcels A4 And A5 Dwg No. 17066 1010
- 2d Car Charging Plan Parcels A6, B3/B4 and B5 Dwg No. 17066 1002
- SUPERSEDED 2d Sustainability Statement Vailant Fields Phase 2 dated April 2022 prepared by JSP Sustainability LTD
- 2d email 7.6.22
- Supporting Letter
- Application Form Redacted
- SUPERSEDED Sustainability Statement Valant Fields Phase 2 prepared by JSP Sustainability Ltd April 2022
- SUPERSEDED Car Charging Plan Parcel A4b (of Phase 2D) drawing No. A4-010B
- 2d Valiant 2 Sustainability Statement rev a (Rec d 15.9.23)
- A4b 17066-A4-010C - Car Charging Plan (Rec d 15.11.23)
- A4b Valiant 2 Sustainability Statement rev A (Rec d 15.11.23)
- Ph2E A3 Cover Letter
- Ph2E A3 Application Form
- Ph2E A3 Energy Statement prepared by Environmental Economics Version 2 dated 9th January 2024
- Covering Letter
- Application Form
- Energy Statement Heritage Grange, Phase B6 Version 1 dated 19/02/2024 prepared by Environmental Economics
- 2b C2 Sustainability Statement - Issue 2. (1) (Dated 10.9.24)
- 2b C2 BWA17 PL802G Car Charging Plan Parcel C2[52]
- 2b C2 Solar Panel Details OP13589 H7736 Gaydon Phase 2 R3 280524[59]
- DISC/00179/22 Decision Notice
CONDITIONS 012
- PN 1632 Written Scheme of Investigations.
- PN1632 WSI Archaeological desk based assessment Appendix 1 Part 1.
- PN 1632 WSI Appendix 1 Part 2.
- PN1632 WSI Plot of minimally gradiometer data Appendix 2 Part 3.
- PN1632 WSI Abstraction and Interpretation of gradiometer abnomolies Appendix 2 Part 4.
- PN1632 WSI Pictures of trenches dug at location. Appendix 3 Part 2.
- PN1632 WSI Boundary Ditch photgraph. Appendix 3 Part 3.
- Ph2 Condition 12 covering letter.
- PN1632 WSI Archaeological Evaluation Report. Appendix 3 Part 1.
- PN1632 WSI Abstraction and interpretation SE Area. Appendix 2 Part 11.
- PN1632 WSI Plot of minmally processed gradiometer data. Appendix 2 Part 10.
- PN1632 WSI Colour plot of gradiometer data. Appendix 2 Part 9.
- PN1632 WSI Colour plot of gradiometer data. Appendix 2 Part 8.
- PN1632 WSI Plot of minimally processed gradiometer data. Appendix 2 Part 7.
- PN1632 WSI Geophysical Survey colour plot Appendix 2 Part 6.
- PN1632 WSI Geophysical Survey Appendix 2 Part 5.
- PN 1632 WSI Colour plot of Gradiometer data Appendix 2 Part 2.
- PN 1632 WSI Geophysical Survey Report Appendix 2 Part 1.
- PN 1632 WSI Appendix 1 Part 4.
- PN 1632 WSI Appendix 1 Part 3 Ordnance Survey Map.
- Ph2 Decision 12A Archaeology Investigations land east B4100 + sports area - Approved 15.5.18 DISC/00229/18
- Ph1 Application Form
- Archaeology WSI Kingston Grange Phase 1 Plot 1F WSI
- Archaeology Phase 1 Plot 1F WSI Appendix 1 DBA
- Archaeology Phase 1 Plot IF WSI Appendix 2 Geophysics
- Archaeology Phase 1 Plot 1F WSI Appendix 3 Trenching parts 1
- Trenching Part 2
- Trenching Part 3
- Trenching Part 4
- Ph1 Decision 12A land west B4100 Archaeology WSI Approved 4.6.18 DISC/00246/18
- Application form no personal data.
- Condition 10-Phase 1 Identification drawing number:C10 Phase 1
- Trench overlaid on design development concept plan.
- Geophysical Survey - abstraction and interpretation of gradiometer anomalies.
- Covering letter from Calremont Planning Consultancy.
- Withdrawn Letter 28.6.18 (cond 12) DISCE/00056/18
- Ph2 Application Form
- Ph2 Covering Letter
- Archaeological Evaluation Ref 2578
- Ph2 12c Orion Archaeological Mitigation Strategy (East of B4100 + Sports Area) Nov 2018 (received 15.1.19)
- Ph2 Decision 12B + 12C land east B4100 + sports area Archaeological Evaluation + Mitigation approved 16.1.19 DISC/00509/18
- Ph2 DISC/00509/18 Decision Notice 12b 12c archaeology East + Sports approved 16.1.19
- 12B Phase 1 Archaeological Evaluation Report prepared by Wessex Archaeology
- Ph2 Application Form dated 14.05.19
- PH2 Agent cover letter dated 12.05.19, rec d 14.05.19
- Ph2 Letter dated 14 May 2019 from Cathy Patrick of Orion Heritage detailing completion of mediation excavation, rec d 14.05.19
- GLH Phasing Plan
- Ph2 12(c) Interim Statement - Area 2 + Trenches 137+138 (Area 2e to follow)
- Ph2 Interim Statement Area 2 + Trenches 137+138
- DISC/00181/19 Decision Notice
- Application Form.
- Covering Letter from Agent.
- Summary Statement August 2019 completed by Orion Heritage.
- Ph2 Archaeological Excavation Report V2 30.9.19
- DISC/00065/19 Decision Notice
CONDITIONS 013
- Application form redacted
- Cover letter
- SUPERSEDED Village Centre Design Brief (Low resolution version)
- Design:Midlands Design Review Comments 18.5.23
- SUPERSEDED Village Centre Design Brief
- Homes England - no comment 21.9.23
- Warwickshire Fire and Rescue response
- WCC Property & Education - no comments 5.10.23
- Consortium comments via Jason Tait Agent 6.10.23
- SDC/ICB Comments 11.10.23
- Active Travel England Response 17.10.2023
- WCC Highways (Rec d 6.12.23)
- Upper Lighthorne Comment Tracker 240524 Design Brief Amenedments_Update (1) (Dated May 2024)
- 00880I_Village Centre Development Brief_RevE_P (1) (Rec d June 2024)
- 00880I_Village Centre Development Brief_RevF (May 2024) (smaller sized version)
CONDITIONS 014
CONDITIONS 015
- SUPERSEDED----- 15 Materials Distribution Plan Dwg No. BHSM/P002 Rev G
- Ph1 15 Details Of Feature Brickwork Panels Dwg No. D_01
- Ph2a+2c Application Form DISC/00223/19 (15), rec d 12.06.19
- Ph2a+2c Agent cover letter dated 31.05.19
- SUPERSEDED 21901-100-COLOURED LANDSCAPE MASTERPLAN-RevB, rec d 12.06.19
- SUPERSEDED 21901-107-MATERIALS AND FURNITURE--PH2A-2C-RevB, rec d 12.06.19
- SUPERSEDED 21901-108-PLANT STRATEGY-PH2A-2C-RevB, rec d 12.06.19
- SUPERSEDED 21901-110--PH2A-GA GREEN CORRIDOR 01 02-RevB, rec d 12.06.19
- SUPERSEDED 21901-111--PH2A-GA GREEN CORRIDOR 03-RevB, rec d 12.06.19
- SUPERSEDED 21901-112--PH2A-GA GREEN CORRIDOR 04 COPPICE-RevB, rec d 12.06.19
- SUPERSEDED 21901-113--PH2A-GA GREEN CORRIDOR 05 LAKES-RevB, rec d 12.06.19
- SUPERSEDED 21901-114--PH2A-GA NOISE BUND-RevB, rec d 12.06.19
- SUPERSEDED 21901-115--PH2A-GA LAKES LEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-116-PH2A- MATERIALS LAKES LEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-117-PH2A-PLAY EQUIPMENT LAKES LEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-120--PH2A GAPLOTS 1of5-RevB, rec d 12.06.19
- SUPERSEDED 21901-121-PH2A GA-PLOTS 2of5-RevB, rec d 12.06.19
- SUPERSEDED 21901-122--PH2A GA-PLOTS 3of5-RevB, rec d 12.06.19
- SUPERSEDED 21901-123--PH2A GA-PLOTS 4of5-RevB, rec d 12.06.19
- SUPERSEDED 21901-124--PH2A GA-PLOTS 5of5-RevB, rec d 12.06.19
- SUPERSEDED 21901-210-PH2C-GA GREEN CORRIDORS 6-9-RevB, rec d 12.06.19
- SUPERSEDED 21901-211-PH2C-GA CENTRAL CORE LEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-212-PH2C-NEAP COMMUNITY GARDEN-RevB, rec d 12.06.19
- SUPERSEDED 21901-213-PH2C-MATERIALS-CENTRAL CORE LEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-214-PH2C-PLAY EQUIP- CENTRAL CORE LEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-215-PH2C- MATERIALS NEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-216-PH2C-PLAY EQUIP NEAP-RevB, rec d 12.06.19
- SUPERSEDED BWA01 PL201 Material Boundary B1 - Rev C, rec d 12.06.19
- SUPERSEDED BWA01 PL202 Material Boundary B2 - Rev C, rec d 12.06.19
- SUPERSEDED BWA01 PL203 Material Boundary A1 - Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL204 Material Boundary C2 Phase2A - Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL205 Material Boundary - C1 - Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL206 Material Boundary - A2, rec d 12.06.19
- SUPERSEDED BWA01 PL207 Material Boundary -A4 Phase2A Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL440 - Material Palette 1, rec d 12.06.19
- SUPERSEDED BWA01 PL441 - Material Palette 2, rec d 12.06.19
- SUPERSEDED BWA01 PL442 - Material Palette 3, rec d 12.06.19
- SUPERSEDED BWA01 PL443 - Material Palette 4, rec d 12.06.19
- SUPERSEDED BWA01 PL470 - Materials Palette 1, rec d 12.06.19
- SUPERSEDED BWA01 PL471 - Materials Palette 2, rec d 12.06.19
- SUPERSEDED BWA01 PL472 - Materials Palette 3, rec d 12.06.19
- SUPERSEDED BWA01 PL473 - Materials Palette 4, rec d 12.06.19
- GLH Phasing Plan
- Ph1 Roof tile Sample Photographs
- WCC Highways response 11.07.19 (DISCN/00206/19)
- Ph1 Stone Sample Photographs 21.08.2019
- SUPERSEDED----Materials And Furniture Phase 2A/2C Dwg No. 21901/107 Rev C
- SUPERSEDED----Planting Strategy Phase 2A/2C Dwg No. 21901/108 Rev C
- SUPERSEDED----Coloured Landscape Masterplan Phase 2A/2C Dwg No. 21901/100 Rev C
- SUPERSEDED----General Arrangement Green Corridors 1 & 2 Phase 2A Dwg No. 21901/110 Rev C
- SUPERSEDED----General Arrangement Green Corridors 3 Phase 2A Dwg No. 21901/111 Rev C
- SUPERSEDED----General Arrangement Green Corridor 4 & Coppice Phase 2A Dwg No. 21901/112 Rev C
- SUPERSEDED-----General Arrangement Green Corridor 5 & Lakes Phase 2A Dwg No. 21901/113 Rev C
- SUPERSEDED----General Arrangement Noise Bund Phase 2A Dwg No. 21901/114 Rev C
- SUPERSEDED----General Arrangement Lakes LEAP Phase 2A Dwg No. 21901/115 Rev C
- SUPERSEDED----Materials - Lakes LEAP Dwg No. 21901-116 Rev C
- SUPERSEDED-----Play - Lakes LEAP Dwg No. 21901-117 Rev C
- SUPERSEDED-----General Arrangement Parcels - Phase 2A (1 Of 5) Dwg No. 21901/120 Rev C
- SUPERSEDED-----General Arrangement Parcels - Phase 2A (2 Of 5) Dwg No. 21901/121 Rev C
- SUPERSEDED----General Arrangement Parcels - Phase 2A (3 Of 5) Dwg No. 21901/122 Rev C
- SUPERSEDED----General Arrangement Parcels - Phase 2A (4 Of 5) Dwg No. 21901/123 Rev C
- SUPERSEDED----General Arrangement Parcels - Phase 2A (5 Of 5) Dwg No. 21901/124 Rev C
- SUPERSEDED----General Arrangement Green Corridor 6 - 9 Phase 2C Dwg No. 21901/210 Rev C
- SUPERSEDED----General Arrangement Central Core LEAP Phase 2C Dwg No. 21901/211 Rev C
- SUPERSEDED----General Arrangement NEAP & Community Garden Phase 2C Dwg No. 21901/212 Rev C
- SUPERSEDED----Materials - Central LEAP Dwg No. 21901-213 Rev C
- SUPERSEDED----Play - Central LEAP Dwg No. 21901-214 Rev C
- SUPERSEDED----Materials - NEAP Dwg No. 21901-215 Rev C
- SUPERSEDED----Play - NEAP Dwg No. 21901-216 Rev C
- SUPERSEDED----Material and Boundaries:Parcel B1 Dwg No. BWA01 PL201 Rev D
- SUPERSEDED----Material and Boundaries:Parcel B2 Dwg No. BWA01 PL202 Rev D
- SUPERSEDED----Material and Boundaries:Parcel A1 Dwg No. BWA01 PL203 Rev B
- SUPERSEDED----Material and Boundaries:Parcel C2 Dwg No. BWA01 PL204 Rev B
- SUPERSEDED----Material and Boundaries:Parcel C1 Dwg No. BWA01 PL205 Rev B
- SUPERSEDED----Material and Boundaries:Parcel A2 Dwg No. BWA01 PL206 Rev A
- SUPERSEDED----Material and Boundaries:Parcel A4 Phase 2a Dwg No. BWA01 PL207 Rev B
- Sample Photographs
- SUPERSEDED Ph1 Material Distribution Plan Dwg No. BHSM/P002 Rev P
- SUPERSEDED----Ph2a 21901-107-MATERIALS AND FURNITURE--PH2A-2C-RevD
- Ph2a 21901-108A-PLANT STRATEGY-PH2A-2C-RevD
- Ph2a 21901-108B-PLANT STRATEGY-PH2A-2C
- Ph2a 21901-110-PH2A-GA GREEN CORRIDOR 01&02-RevD
- Ph2a 21901-111-PH2A-GA GREEN CORRIDOR 03-RevD
- Ph2a 21901-112-PH2A-GA GREEN CORRIDOR 04&COPPICE-RevD
- Ph2a 21901-113-PH2A-GA GREEN CORRIDOR 05&LAKES-RevD
- Ph2a 21901-114-PH2A-GA NOISE BUND-RevD
- Ph2a 21901-115-PH2A-GA LAKES LEAP-RevD
- Ph2a 21901-116-PH2A-MATERIALS LAKES LEAP-RevD
- Ph2a 21901-117-PH2A-PLAY EQUIPMENT LAKES LEAP-RevD
- Ph2a 21901-120-PH2A GAPLOTS 1of5-RevD
- Ph2a 21901-121-PH2A GA-PLOTS 2of5-RevD
- Ph2a 21901-122-PH2A GA-PLOTS 3of5-RevD
- Ph2a 21901-123-PH2A GA-PLOTS 4of5-RevD
- Ph2a 21901-124-PH2A GA-PLOTS 5of5-RevD
- Ph2c 21901-210-PH2C-GA GREEN CORRIDORS 6-9-RevD
- Ph2c 21901-211-PH2C-GA CENTRAL CORE LEAP-RevD
- Ph2c 21901-212-PH2C-NEAP& COMMUNITY GARDEN-RevD
- SUPERSEDED----Ph2c 21901-213-PH2C-MATERIALS-CENTRAL CORE LEAP-RevD
- Ph2c 21901-214-PH2C-PLAY EQUIP- CENTRAL CORE LEAP-RevD
- SUPERSEDED----Ph2c 21901-215-PH2C- MATERIALS NEAP-RevD
- Ph2c 21901-216-PH2C-PLAY EQUIP NEAP-RevD
- SUPERSEDED----Ph2a BWA01 - PL201 Rev E - Material Boundary parcel B1
- SUPERSEDED----Ph2a BWA01 - PL202 Rev G - Material Boundary parcel B2
- SUPERSEDED----Ph2a BWA01 - PL203 Rev C - Material Boundary parcel A1
- SUPERSEDED----Ph2a BWA01 - PL204 Rev C - Material Boundary parcel C2 Phase 2a
- SUPERSEDED----Ph2a BWA01 - PL205 Rev C - Material Boundary parcel C1
- SUPERSEDED----Ph2a BWA01 - PL206 Rev B - Material Boundary parcel A2
- SUPERSEDED----Ph2a BWA01 - PL207 Rev C - Material Boundary parcel A4 Phase 2A
- SUPERSEDED----ph2a BWA01 - PL201 Rev G - Material Boundary parcel B1
- SUPERSEDED----ph2a BWA01 - PL202 Rev L - Material Boundary parcel B2
- SUPERSEDED----ph2a BWA01 - PL203 Rev E - Material Boundary parcel A1
- SUPERSEDED----ph2a BWA01 - PL204 Rev E - Material Boundary parcel C2 Phase 2a
- SUPERSEDED----ph2a BWA01 - PL205 Rev E - Material Boundary parcel C1
- SUPERSEDED----ph2a BWA01 - PL206 Rev D - Material Boundary parcel A2
- SUPERSEDED----ph2a BWA01 - PL207 Rev E - Material Boundary parcel A4 Phase 2A
- ph2a BWA01 - PL201 Rev H - Material Boundary parcel B1
- ph2a BWA01 - PL202 Rev M - Material Boundary parcel B2
- ph2a BWA01 - PL203 Rev F - Material Boundary parcel A1
- ph2a BWA01 - PL204 Rev F - Material Boundary parcel C2 Phase 2a
- ph2a BWA01 - PL205 Rev F - Material Boundary parcel C1
- ph2a BWA01 - PL206 Rev E - Material Boundary parcel A2
- ph2a BWA01 - PL207 Rev F - Material Boundary parcel A4 Phase 2A
- ph2a 21901-107-MATERIALS AND FURNITURE--PH2A-2C-RevE
- Ph1 Material Distribution Plan Dwg No. BHSM/P002 Rev Q
- SUPERSEDED Material and Boundaries: Parcel B1 Dwg No. BWA01 PL201 Rev J
- Material and Boundaries: Parcel A1 Dwg No. BWA01 PL203 Rev G
- SUPERSEDED Material and Boundaries: Parcel A2 Dwg No. BWA01 PL206 Rev G
- SUPERSEDED Material and Boundaries: Parcel A4 Phase 2a Dwg No. BWA01 PL207 Rev H
- SUPERSEDED Material and Boundaries: Parcel C1 Dwg No. BWA01 PL205 Rev H
- Material and Boundaries: Parcel C2 Dwg No. BWA01 PL204 Rev G
- SUPERSEDED Material and Boundaries: Parcel B2 Dwg No. BWA01 PL202 Rev N
- Ph1 DISC/00065/19 Decision Notice
- VCSR Cover Letter (DISC/00362/20)
- VCSR Application Form (DISC/00362)
- VCSR Site Location Plan Dwg No. 18196 SK01 Rev C
- VCSR Village Centre Surface Finishes Plan - Sheet 1 Dwg No. 18196 VC-107 Rev E
- VCSR Village Centre Surface Finishes Plan - Sheet 2 Dwg No. 18196 VC-108 Rev D
- VCSR Village Centre Kerbing Layout - Sheet 1 Dwg No. 18196 VC-109 Rev D
- VCSR Village Centre Kerbing Layout - Sheet 2 Dwg No. 18196 VC-110 Rev D
- Ph2a Parcels A2+A4+C1 Cover Letter
- Ph2a Parcels A2+A4+C1 Application Form
- SUPERSEDED Ph2a Parcels A2+A4+C2 Materials Layout Parcel C1 Dwg No. 17066 PL205 L
- SUPERSEDED Ph2a Parcels A2+A4+C2 Materials Layout Parcel A2 & A4 Dwg No. 17066 PL206 K
- Ph2a A2+A4 (Revised) 17066-PL206L_Materials Layout Parcel A2 A4
- Ph2a C1 (revised) 17066-PL205M_Materials Layout Parcel C1
- (Ph2A+2C B4100) Application Form (DISC/00472/20)
- (Ph2A+2C B4100) Cover Letter
- (Ph2A+2C B4100) Material Boundary parcel B1 Dwg No. PL201 Rev M
- (Ph2A+2C B4100) Material Boundary parcel B2 Dwg No. PL202 Rev Q
- DISC/00427/20 Decision Noitce
- DISC/00472/20 Decision Notice
- Ph2a 2c DISC/00223/19 approved 15.11.19 but since superseded for Ph2a
- DISC/00419/21 Decision Notice
- Application Form (DISC/00419/21)
- Cover Letter
- Materials Layout Parcel C1 Dwg No. PL205 V
- VCSR Withdrawn Letter 15.09.21
- (Ph 2b/Parcel C2) Application Form (DISC/00063/22), rec d 17.02.22
- 2b superseded Agent cover letter, rec d 17.02.22
- 2b superseded Materials and Boundaries: Parcel C2 Drawing No BWA17 PL202, rec d 17.02.22
- 2d Application form
- 2d Covering Letter dated 23 May 2022
- 2d Materials and Enclosures Layout parcels A4 and A5 Dwg No. 17066-3001
- 2d Materials and Enclosures Layout parcels A6, B3/B4 and B5 Dwg No. 17066-3002
- 2d Materials and Boundaries Substation A4 Dwg No. BWA17-PL522
- 2d Materials and Boundaries Substation B4 Dwg No. BWA17-PL523
- 2d Materials and Boundaries Substation B5 Dwg No. BWA17-PL524
- 2d Materials Plot Schedule Site Ref 20144 prepared by Taylor Wimpey
- (A4b of Ph 2d) Application Form (DISC/00037/23) rec d 01.02.23
- (A4b of Ph 2d) Agent cover letter
- SUPERSEDED(A4b of Ph 2d) Materials Layout Parcel A4b (of Phase 2D) Dwg No 17066 A4-300 Rev A, rec d 01.02.23
- A4b of 2d Agent email 26.4.23
- SUPERSEDED A4b of 2d 17066-A4-300B - Materials (Rec d 26.4.23)
- A4b 17066-A4-300D - Materials (Rec d 15.11.23)
- Application Form
- Cover Letter
- Materials and Boundaries: Parcel A3 Dwg No. PL200 Rev F
- 2a B1 Covering Letter
- 2a B1 Application Form Redacted
- 2a B1 Material and Boundaries:Parcel B1 Drawing No. PL201 W
- 2b covering email 28.3.24 revised drawing
- DISC/00063/22 Decision Notice
- Covering Letter
- Application Form
- Materials and Boundaries: Parcel B6 Dwg No. PL201 Rev B
- DISCN/00063/24 Decision Notice
CONDITIONS 016
- Ph1 SUPERSEDED Vehicle And Cycling Parking Plan Dwg No. P013 Rev C
- Ph2a+2c Application Form DISC/00224/19 (16, 17), rec d 12.06.19
- Ph2a+2c Agent cover letter dated 31.05.19, rec d 12.06.19
- SUPERSEDED 21901-116-PH2A- MATERIALS LAKES LEAP-RevB(1), rec d 12.06.19
- SUPERSEDED 21901-213-PH2C-MATERIALS-CENTRAL CORE LEAP-RevB, rec d 12.06.19
- SUPERSEDED 21901-215-PH2C- MATERIALS NEAP-RevB, rec d 12.06.19
- GLH Phasing Plan
- Ph 2a 2c WCC Highways Response 31.07.2019
- SUPERSEDED----Materials - Lakes LEAP Dwg No. 21901-116 Rev C
- SUPERSEDED----Materials - Central LEAP Dwg No. 21901-213 Rev C
- SUPERSEDED----Materials - NEAP Dwg No. 21901-215 Rev C
- SUPERSEDED----Ph2a 21901-116-PH2A-MATERIALS LAKES LEAP-RevD
- SUPERSEDED----Ph2c 21901-213-PH2C-MATERIALS-CENTRAL CORE LEAP-RevD
- SUPERSEDED----Ph2c 21901-215-PH2C- MATERIALS NEAP-RevD
- ph2a 17066-Cycle Store
- ph2a BWA01 - PL620 - Cycle & Bin Stores Type A & B - Rev A
- ph2a ME-32-32 Bin & Cycle Stores
- ph2a 21901-215-PH2C- MATERIALS NEAP-RevD
- ph2a 21901-116-PH2A-MATERIALS LAKES LEAP-RevD
- ph2a 21901-213-PH2C-MATERIALS-CENTRAL CORE LEAP-RevD
- ph2a 21901-107-MATERIALS AND FURNITURE--PH2A-2C-RevE
- WCC Highways 29.10.19
- DISC/00065/19 Decision Notice
- (A4b of Ph 2d) Application Form (DISC/00038/23) rec d 01.02.23
- (A4b of Ph 2d) Agent cover letter
- SUPERSEDED (A4b of Ph 2d) Site Layout Parcel A4b (of Phase 2b) Dwg No 17066 A4-001 Rev A, rec d 01.02.23
- SUPERSEDED A4b of 2d Site Layout 17066-A4-001E (Rec d 26.4.23)
- A4b of 2d 17066 - Cycle Store (Rec d 26.4.23)
- A4b of 2d Agent covering email 26.4.23
- A4b 17066-A4-001H - Site Layout A4b (Rec d 11.8.23)
- Ph2B C2 Cover Letter
- Ph2B C2 Application Form
- Ph2B C2 Site Layout Parcel C2 Dwg No. PL102 Rev M
- Ph2B C2 External Works Plan: Parcel C2 Dwg No. WD002 Rev K
- Ph2B C2 SUPERSEDED Bin And Cycle Store Dwg No. PL701 Rev A
- Ph2B C2 Car Charging Plan: Parcel C2 Dwg No. PL802 Rev G
- Ph2B C2 Garage Type 1 - LSG1H8 Dwg No. PL480
- Ph2B C2 Garage Type 2 - LDG2H8 Dwg No. PL481
- Ph2B C2 Garage Type 3 - LDG1H8 Dwg No. PL702 Rev A
- Ph2E A3 Cover Letter
- Ph2E A3 Application Form
- Ph2E A3 Site Layout Parcel A3 Dwg No. PL100 Rev Q
- Ph2E A3 External Works : Parcel A3 Dwg No. WD001 Rev C
- Ph2E A3 Bin And Cycle Store Dwg No. PL700
- Ph2B C2 Cover Letter
- Ph2B C2 Application Form
- Ph2B C2 Site Layout Parcel C2 Dwg No. PL102 Rev M
- Ph2B C2 External Works Plan: Parcel C2 Dwg No. WD002 Rev K
- Ph2B C2 Bin And Cycle Store Dwg No. PL701 Rev A
- Ph2B C2 Car Charging Plan: Parcel C2 Dwg No. PL802 Rev G
- Ph2B C2 Garage Type 1 - LSG1H8 Dwg No. PL480
- Ph2B C2 Garage Type 2 - LDG2H8 Dwg No. PL481
- Ph2B C2 Garage Type 3 - LDG1H8 Dwg No. PL702 Rev A
- Cover Letter
- Application Form
- Garage Type 1 - LSG1H8 Dwg No. PL480
- Garage Type 2 - LDG2H8 Dwg No. PL481
- Car Charging Plan: Parcel B6 Dwg No. PL801 Rev B
- Bin and Cycle Store Dwg No. PL701 Rev A
- Site Layout Parcel B6 Dwg No. PL101 Rev P
- Bin and Cycle Store Dwg No. PL701 Rev A
- 2b Neath Cycle Rack BXMW/NEA Cycle Parking Specification Sheet prepared broxap
- 2bC2 BWA17 - PL701B - Bin and Cycle Store (Rec d 23.8.24)
- DISC/00039/24 Decision Notice
CONDITIONS 017
- Ph1 17 Vehicle And Cycling Parking Plan Dwg No. P013 Rev C
- Ph2a+2c Application Form DISC/00224/19 (16, 17), rec d 12.06.19
- Ph2a+2c Agent cover letter dated 31.05.19, rec d 12.06.19
- SUPERSEDED BWA01 PL003 - Site Layout Parcel B1 Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL004 - Site Layout Parcel B2 Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL005 - Site Layout Parcel A1 Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL006 - Site Layout Parcel C1 Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL007 - Site Layout Parcel C2 Phase 2A Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL008 - Site Layout Parcel A2 Rev A, rec d 12.06.19
- SUPERSEDED BWA01 PL009 - Site Layout Parcel A4 Phase 2A Rev A, rec d 12.06.19
- GLH Phasing Plan
- Ph 2a 2c WCC Highways Response 31.07.2019
- SUPERSEDED---Parcel - B1 Dwg No. BWA01 PL003 Rev C
- SUPERSEDED---Parcel - B2 Dwg No. BWA01 PL004 Rev C
- SUPERSEDED---Parcel - A1 Dwg No. BWA01 PL005 Rev B
- SUPERSEDED---Parcel - C1 Dwg No. BWA01 PL006 Rev B
- SUPERSEDED---Parcel - C2 Phase 2A Dwg No. BWA01 PL007 Rev B
- SUPERSEDED---Parcel - A2 Dwg No. BWA01 PL008 Rev B
- SUPERSEDED---Parcel - A4 Phase 2A Dwg No. BWA01 PL009 Rev B
- Ph2a 21901-116-PH2A-MATERIALS LAKES LEAP-RevD
- SUPERSEDED----Ph2a BWA01 - PL003 Rev D - Site Layout Parcel B1
- SUPERSEDED----Ph2a BWA01 - PL004 Rev D - Site Layout Parcel B2
- SUPERSEDED----Ph2a BWA01 - PL005 Rev C- Site Layout Parcel A1
- Ph2a BWA01 - PL006 Rev C - Site Layout Parcel C1
- Ph2a BWA01 - PL008 Rev C - Site Layout Parcel A2
- Ph2a BWA01 - PL009 Rev C - Site Layout Parcel A4 Phase 2A
- ph2a BWA01 - PL003 Rev E - Site Layout Parcel B1
- ph2a BWA01 - PL004 Rev E - Site Layout Parcel B2
- ph2a BWA01 - PL005 Rev D- Site Layout Parcel A1
- ph2a BWA01 - PL007 Rev D - Site Layout Parcel C2 Phase 2A
- WCC Highways Response 29.10.2019
- DISC/00065/19 Decision Notice
- (A4b of Ph 2d) Application Form (DISC/00047/23) rec d 01.02.23
- (A4b of Ph 2d) Agent cover letter
- SUPERSEDED (A4b of Ph 2d) Site Layout Parcel A4b (of Phase 2b) Dwg No 17066 A4-001 Rev A, rec d 01.02.23
- A4b of 2d Agent covering email 26.4.23
- SUPERSEDED A4b of 2d 17066-A4-001E - Site Layout A4b (Rec d 26.4.23)
- A4b of 2d 17066-A4-007D - Visitors Parking Plan (Rec d 26.4.23)
- A4b 17066-A4-001H - Site Layout A4b (Rec d 11.8.23)
- Ph2E A3 Cover Letter
- Ph2E A3 Application Form
- Ph2E A3 Site Layout Parcel A3 Dwg No. PL100 Rev Q
- Ph2E A3 External Works : Parcel A3 Dwg No. WD001 Rev C
- Ph2E A3 Bin And Cycle Store Dwg No. PL700
- Cover Letter
- Application Form
- Garage Type 1 - LSG1H8 Dwg No. PL480
- Garage Type 2 - LDG2H8 Dwg No. PL481
- Car Charging Plan: Parcel B6 Dwg No. PL801 Rev B
- Bin and Cycle Store Dwg No. PL701 Rev A
- Site Layout Parcel B6 Dwg No. PL101 Rev P
- DISC/00053/24 Decision Notice
CONDITIONS 018
- SUPERSEDED 18 Preliminary Finished Floor Level Plan Dwg No. P_ENG_003 Rev D
- SUPERSEDED 18 Drainage Strategy Plan Sheet 1 Dwg No. P_ENG_007 Rev D
- SUPERSEDED 18 Drainage Strategy Plan Sheet 2 Dwg No. P_ENG_008 Rev C
- Ph2a+2c Application Form DISC/00225/19 (18, 29, 30) rec d 12.06.19
- Ph2a+2c Agent cover letter dated 31.05.19
- SUPERSEDED BWA01 PL300 Ridge Heights - Parcel B1, rec d 12.06.19
- SUPERSEDED BWA01 PL301 Ridge Heights - Parcel B2, rec d 12.06.19
- SUPERSEDED BWA01 PL302 Ridge Heights - Parcel A1, rec d 12.06.19
- SUPERSEDED BWA01 PL303 Ridge Heights - Parcel C2 - Phase 2A, rec d 12.06.19
- SUPERSEDED BWA01 PL304 Ridge Heights - Parcel C1, rec d 12.06.19
- SUPERSEDED BWA01 PL305 Ridge Heights - Parcel A2, rec d 12.06.19
- SUPERSEDED BWA01 PL306 Ridge Heights - Parcel A4 - Phase A2, rec d 12.06.19
- SUPERSEDED 1F - Drainage Strategy - Phase 2a - Sheet 1, rec d 13.06.19
- SUPERSEDED 2F - Drainage Strategy - Phase 2a - Sheet 2, rec d 13.06.19
- SUPERSEDED 3F - Drainage Strategy - Phase 2a - Sheet 3, rec d 13.06.19
- SUPERSEDED 4F - Drainage Strategy - Phase 2a - Sheet 4, rec d 13.06.19
- SUPERSEDED 5F - Drainage Strategy - Phase 2a - Sheet 5, rec d 13.06.19
- SUPERSEDED 6F - Drainage Strategy - Phase 2a - Sheet 6, rec d 13.06.19
- GLH Phasing Plan
- Ph1 BHSM_KG_ENG_500 Rev I - Detailed Engineering Layout 1_500
- Ph1 BHSM_KG_ENG_850 Rev # - Cross Sections
- Ph1 BHSM_KG_ENG_500 Rev I - Detailed Engineering Layout 1_500
- Ph1 BHSM_KG_ENG_850 Rev # - Cross Sections
- Drainage Strategy - Phase 2A - Sheet 1 Dwg No. 19002 1 Rev H
- Drainage Strategy - Phase 2A - Sheet 2 Dwg No. 19002 2 Rev H
- Drainage Strategy - Phase 2A - Sheet 3 Dwg No. 19002 3 Rev H
- Drainage Strategy - Phase 2A - Sheet 4 Dwg No. 19002 4 Rev H
- Drainage Strategy - Phase 2A - Sheet 5 Dwg No. 19002 5 Rev H
- Drainage Strategy - Phase 2A - Sheet 6 Dwg No. 19002 6 Rev G
- SUPERSEDED----Ridge Heights - Parcel - B1 Dwg No. BWA01 PL300 Rev A
- SUPERSEDED----Ridge Heights - Parcel - B2 Dwg No. BWA01 PL301 Rev A
- Ridge Heights - Parcel - A1 Dwg No. BWA01 PL302 Rev A
- SUPERSEDED----Ridge Heights - Parcel C2 - Phase 2a Dwg No. BWA01 PL303 Rev A
- Ridge Heights - Parcel - C1 Dwg No. BWA01 PL304 Rev A
- SUPERSEDED----Ridge Heights - Parcel - A2 Dwg No. BWA01 PL305 Rev A
- SUPERSEDED----Ridge Heights - Parcel A4 - Phase 2A Dwg No. BWA01 PL306 Rev A
- SUPERSEDED----Ph2a BWA01 - PL301 Rev B - Ridge Heights Parcel B2
- Ph2a BWA01 - PL303 Rev B - Ridge Heights Parcel C2 Phase 2A
- Ph2a BWA01 - PL305 Rev B - Ridge Heights Parcel A2
- Ph2a BWA01 - PL306 Rev B - Ridge Heights Parcel A4 Phase 2A
- BWA01 - PL301 Rev C - Ridge Heights Parcel B2
- ph2a BWA01 - PL300 Rev B - Ridge Heights Parcel B1
- DISC/00225/19 Decision Notice
- DISC/00065/19 Decision Notice
- VCSR Cover Letter (DISC/00366/20)
- VCSR Application Form (DISC/00366/20)
- VCSR Site Location Plan Dwg No. 18196 SK01 Rev C
- SUPERSEDED VCSR Village Centre, Road And Sewer Long Section - Sheet 1 Dwg No. 18194 VC-201 Rev A
- SUPERSEDED VCSR Village Centre, Road And Sewer Long Section - Sheet 2 Dwg No. 18194 VC-202 Rev A
- VCSR VC-201B - Road and Sewer Long Section - Sheet 1
- VCSR VC-202B - Road and Sewer Long Section - Sheet 2
- VCSR Withdrawn Letter 15.09.21
- (Ph 2b/Parcel C2) Application Form (DISC/00070/22), rec d 17.02.22
- 2b superseded Agent cover letter, rec d 17.02.22
- 2b Superseded Ridge Heights: Parcel C2 Drawing No BWA17 PL302, rec d 17.02.22
- 2b superseded Preliminary Finished Floor Levels and Drainage Strategy Drawing No 19002 C2-1, rec d 17.02.22
- 2d Cover Letter
- 2d Application Form
- 2d Storey Height Plan Dwg No. 17066 1004
- 2d Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-1
- 2d Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-2
- 2d Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-3
- (A4b of Ph 2d) Application Form (DISC/00039/23) rec d 01.02.23
- (A4b of Ph 2d) Agent cover letter
- SUPERSEDED(A4b of Ph 2d) Preliminary Finished Floor Levels and Drainage Strategy Dwg No 19002 A4b-1 Rev A
- SUPERSEDED (A4b of Ph 2d) Ridge and Storey Heights Parcel A4b (of Phase 2D)
- A4b of 2d Agent covering email 26.4.23
- A4b of 2d 17066-A4-003D - Ridge Heights (Rec d 26.4.23)
- SUPERSEDED A4b of 2d A4b-1C Preliminary Finished Floor Levels and Drainage Strategy (Rec d 26.4.23)
- A4b A4b-1D Preliminary Finished Floor Levels and Drainage Strategy (Rec d 11.8.23)
- A4b Site Sections 17066-A4-020
- Application Form Redacted
- Phase 2e Parcel A3 - Parcel A3 (Phase E) Preliminary FFL s and Drainage Strategy Drawing No. 19002 A3-1 F
- Phase 2e Parcel A3 - Ridge Heights: Parcel A3 Drawing No. BWA17-PL300 Rev E
- Application Form
- Cover Letter
- Ridge Heights Parcel B6 Dwg No. PL301 Rev C
- Parcel B6 - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. B6-1 Rev B
- 2b Cover email revised drawings 28.3.24
- DISC/00070/22 Decision Notice
- (Ph 2D and 2E) Cover Letter
- (Ph 2D and 2E) Application Form
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-3 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-1 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-3-1 Rev A
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-2 Rev D
CONDITIONS 021
CONDITIONS 023
- Phase 2a + 2c Application Form DISC/00227/19 (23) rec d 12.06.19
- Ph2a+2c Agent cover letter dated 31.05.19, rec d 12.06.19
- SUPERSEDED----Bus Stop and Unallocated Parking Locations Drawing No T15034 SK190 Rev B, rec d 12.06.19
- GLH Phasing Plan
- Ph 2a 2c WCC Highways 31.7.19
- SUPERSEDED----Bus Stop and Unallocated Parking Locations Drawing No T15034 SK190 Rev D
- SUPERSEDED----Ph2a T15034 SK190_E Proposed Bus stop and Visitor Parking
- Ph2a 19002 31A - Highway Construction and Bus Arrangement Details
- ph2a T15034 SK190_D Proposed Bus stop and Visitor Parking
- Agent email 5.3.20 with bus stop position drawing 20144/BSP/01
- email to Agent 1.4.20
- Bus Stop Positions Drawing 20144/BSP/01B (received 12.6.20)
- Bus Stop Position Dwg No. 20144/BSP/01 B
- DISC/00227/19 Decision Notice
CONDITIONS 024
- Amendment to Condition 24 (19/01068/AMD)
- Cover Letter
- Application Form
- S278 Agreement dated 2021
- 19/01068/AMD approved amendment Condition 24
- GLH Fosse Way Junctions Bond Agreement 26.1.22
- GLH Fosse Way junctions S278 Agreement 26.1.22
- DISC/00575/21 Decision 1.2.22 C24 Fosse Way works
- DISC/00575/21 Decision Notice
CONDITIONS 025
- Application Form (DISC/00009/21), rec d 13.01.21
- Agent cover letter dated 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-101 Rev A11 (Sheet 1 of 4), rec d 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-102 Rev A14 (Sheet 2 of 4), rec d 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-103 Rev A11 (Sheet 3 of 4), rec d 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-104 Rev A11 (Sheet 4 of 4), rec d 31.01.21
- WIE14591-SA-S278-201 - Site Clearance E02-Sheet 1
- WIE14591-SA-S278-202 - Site Clearance E02-Sheet 2
- WIE14591-SA-S278-203 - Site Clearance E02-Sheet 3
- WIE14591-SA-S278-204 - Site Clearance E03-Sheet 4
- WIE14591-SA-S278-601 - Earthworks E02-Sheet 1
- WIE14591-SA-S278-602 - Earthworks E02-Sheet 2
- WIE14591-SA-S278-603 - Earthworks E02-Sheet 3
- WIE14591-SA-S278-604 - Earthworks E02-Sheet 4
- Decision Letter 10.03.21 (cond 25) DISC/00009/21 (B4100)
- WIE14591-SA-S278-101 - General Arrangement - E01-Sheet 1
- WIE14591-SA-S278-202 - Site Clearance E02-Sheet 2
- WIE14591-SA-S278-103 - General Arrangement - E01-Sheet 3
- WIE14591-SA-S278-104 - General Arrangement - E01-Sheet 4
CONDITIONS 026
- Application Form (DISC/00011/21), rec d 13.01.21
- Agent cover letter dated 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-101 Rev A11 (Sheet 1 of 4), rec d 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-102 Rev A14 (Sheet 2 of 4), rec d 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-103 Rev A11 (Sheet 3 of 4), rec d 13.01.21
- SUPERSEDED S278 Works - General Arrangement Drawing No WIE14591-SA-S278-104 Rev A11 (Sheet 4 of 4), rec d 31.01.21
- WIE14591-SA-S278-201 - Site Clearance E02-Sheet 1
- WIE14591-SA-S278-202 - Site Clearance E02-Sheet 2
- WIE14591-SA-S278-203 - Site Clearance E02-Sheet 3
- WIE14591-SA-S278-204 - Site Clearance E03-Sheet 4
- WIE14591-SA-S278-601 - Earthworks E02-Sheet 1
- WIE14591-SA-S278-602 - Earthworks E02-Sheet 2
- WIE14591-SA-S278-603 - Earthworks E02-Sheet 3
- WIE14591-SA-S278-604 - Earthworks E02-Sheet 4
- Decision Letter 10.03.21 (cond 26) DISC/00011/21 (B4100)
- WIE14591-SA-S278-101 - General Arrangement - E01-Sheet 1
- WIE14591-SA-S278-202 - Site Clearance E02-Sheet 2
- WIE14591-SA-S278-103 - General Arrangement - E01-Sheet 3
- WIE14591-SA-S278-104 - General Arrangement - E01-Sheet 4
CONDITIONS 027
- Application Form (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction General Arrangement Dwg No. 10192-100-211 Rev I (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Construction Details Dwg No. 10192-150-211 Rev D (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Site Clearance Dwg No. 10192-200-211 Rev G (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Drainage Layout Dwg No. 10192-500-100 Rev F (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Earthworks Dwg No. 10192-600-100 Rev F (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Isopachyte Plan Dwg No. 10192-600-101 Rev A (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Pavement and Kerbs Dwg No. 10192-700-100 Rev H F(DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Setting Out - Plan Dwg No. 10192-800-211 Rev C (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Longitudinal Section Dwg No. 10192-800-212 Rev C (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Setting Out - Plan Dwg No. 10192-800-211 Rev C (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Cross-Sections - Sheet 1 of 2 Dwg No. 10192-810-212 Rev C (DISC/00235/20)
- Off-site Mitigation Measures at Meadow Close Priority Junction Road Marking & Traffic Sign Layout Dwg No. 10192-1200-211 Rev G (DISC/00235/20)
- WCC Highways 8.7.20 objection
- DISC/00235/20 Decision Notice
CONDITIONS 028
- GLH Phasing Plan
- Application Form.
- Noise Bund Plan Dwg No: 10192-NB-001 Rev A.
- Noise Bund Sections Dwg No:10192-NB-002 Rev A.
- Noise Bund Sections Sheet 2 of 8 Dwg No:10192-NB-003 Rev A.
- Noise Bund Sections Sheet 3 of 8 Dwg No: 10192-NB-004.
- Noise Bund Sections Sheet 4 of 8 Dwg No: 10192-NB-005.
- Noise Bund Sections Sheet 5 of 8 Dwg No: 10192-NB-006.
- Noise Bund Sections Sheet 6 of 8 Dwg No: 10192-NB-007.
- Noise Bund Sections Sheet 7 of 8 Dwg No: 10192-NB-008.
- Noise Bund Sections Sheet 8 of 8 Dwg No: 10192-NB-009.
- Detailed Layout Noise Assessment/ Mitigation Measure Report No: 10192TN51 Rev 0.
- Covering letter from Planningprospects.
- Highways England Response 08.11.2019
- Existing Cutting Geotechnical Impact Assessment
- Noise Bund Plan Dwg No. 10192-NB-001 Rev B
- Noise Bund Sections Sheet 1 Dwg No. 10192-NB-002 Rev B
- Noise Bund Sections Sheet 2 Dwg No. 10192-NB-003 Rev B
- Noise Bund Sections Sheet 3 Dwg No. 10192-NB-004 Rev A
- Noise Bund Sections Sheet 4 Dwg No. 10192-NB-005 Rev A
- Noise Bund Sections Sheet 5 Dwg No. 10192-NB-006 Rev A
- Noise Bund Sections Sheet 6 Dwg No. 10192-NB-007 Rev A
- Noise Bund Sections Sheet 7 Dwg No. 10192-NB-008 Rev A
- Noise Bund Sections Sheet 8 Dwg No. 10192-NB-009 Rev A
- Highways England response 20.1.20
- Kingston Grange_18318_1_Performance Specification for Engineered Fill_January 2020
- Geotechnical Statement Of Intent prepared by ceg
- Flood Risk Assessment prepared Brookbanks
- Phase I Review & Phase II Strategic Geo-Environmental Assessment prepared by Geo Environmental Group
- Phase II Geotechnical Investigation (Factual) prepared by Geo Environmental Group
- Geo‐Environmental Phase 1 Desk Study prepared by Commercial Estates Group
- Noise Bund Plan Dwg No. 10192-NB-001 Rev C
- Existing Cutting Geotechnical Impact Assessment prepared by Geo Environmental Group
- Highways England Correspondence 14.02.2020
- email Highways England 20.02.20
- Geotechnical Statement Of Intent prepared by CEG
- Flood Risk Assessment Appendix 1 prepared by Commercial Estates Group
- Flood Risk Assessment Doc Ref. 10192/FRA/01 Rev 2 without appendices prepared by Commercial Estates Group
- Flood Risk Assessment Doc Ref. 10192/FRA/01 Rev 2 prepared by Commercial Estates Group
- Phase I Review And Phase II Strategic Geo-Environmental Assessment dated August 2016
- Phase II Geotechnical Investigation (Factual) dated November 2019
- Geo‐Environmental Phase 1 Desk Study Doc Ref. 10192/DS/01 Rev 1 prepared by Commercial Estates Group
- Noise Bund Plan Dwg No. 10192-NB-001 Rev D
- Noise Bund Sections Sheet 1 Dwg No. 10192-NB-002 Rev C
- Noise Bund Sections Sheet 2 Dwg No. 10192-NB-003 Rev C
- Noise Bund Sections Sheet 3 Dwg No. 10192-NB-004 Rev B
- Noise Bund Sections Sheet 4 Dwg No. 10192-NB-005 Rev B
- Noise Bund Sections Sheet 5 Dwg No. 10192-NB-006 Rev B
- Noise Bund Sections Sheet 6 Dwg No. 10192-NB-007 Rev B
- Noise Bund Sections Sheet 7 Dwg No. 10192-NB-008 Rev B
- Noise Bund Sections Sheet 8 Dwg No. 10192-NB-009 Rev B
- Existing Cutting Geotechnical Impact Assessment dated October 2019
- Topographical Survey Sheets 1 - 67
- 10192-NB-001_F Noise Bund Plan
- Agent email 17.3.20 + Summary + Plan 001F
- DISC/00427/19 Decision Notice
- Highways England 23.03.2020
- (Ph 2A part) Letter dated 9 August 2022 from Jason Tait, Planning Prospects Ltd, detailing revised design of boundary bund, rec d 09.08.22
- (Ph 2A part) Application form (DISC/00323/22), rec d 09.08.22
- (Ph 2A part) Noise and Bund Cross -Sections Drawing No WS-117, rec d 09.08.22
- (Ph 2A part) Whole Site - Bund Setting Out Drawing No WS-115 Rev A, rec d 009.08.22
- (Ph 2A part) Whole Site - Bund Setting Out Drawing No WS-114 Rev A, rec d 09.08.22
- (Ph 2A part) Whole Site - Bund Setting Out drawing WS-116 Rev B, rec d 09.8.22
- (Ph 2A part) Acoustic Barrier Earthworks Specification reference GRM/P9886/ES Bund dated April 2022 prepared by GRM Development Solutions Ltd, rec d 09.08.22
- (Ph 2A part) Acoustic Barrier Geotechnical Statement of Intent reference GRM/P9886/SOI.1 dated June 2022 prepared by GRM Development Solutions Ltd, rec d 09.08.22
- (Ph 2A part) Acoustic Bund Stability Assessment reference P9886/Bund.Stability.1 dated June 2022 prepared by GRM Development Solutions Ltd, rec d 09.08.22
- SUPERSEDED (Ph 2A part) Environmental Noise Survey report number 19911A-1 dated 13 January 2022 prepared by Noise.co.uk Ltd, rec d 09.08.22
- National Highways Response 30.08.2022
- SUPERSEDED Ph2a Noise Report 19911A-1-R1 (15 September 2022)
- SUPERSEDED Noise UK Report 16064B-1 (12.12.22)
- Agent email 3.5.23 + Revised Noise Report + Comments
- Noise Report 16064B-1-R1 dated 14 April 2023 (Rec d 3.5.23)
- DISC/00323/22 Decision Notice
CONDITIONS 029
- Ph1 29 Drainage Strategy Plan Sheet 1 Dwg No. P_ENG_007 Rev D
- Ph1 29 Drainage Strategy Plan Sheet 2 Dwg No. P_ENG_008 Rev C
- Ph1 29 Drainage Strategy Pond Sections Dwg No. P_ENG009 Rev A
- Ph1 LLFA response Objection 4.3.19
- LLFA Response 04.03.2019
- Ph1 RACE FRA Rev A + Appendices A-D + Part Appendix E (pages 1-13)
- Ph1 RACE FRA Rev E Appendices E (pages 14-36) + F-G
- Ph1 RACE FRA Rev E Appendices G-H
- Ph1 LLFA Objection 12.4.19
- Ph1 Email 16.4.19 from RACE to Daniel Lamb (WCC LLFA)
- Ph1 Local Topographical Survey (submitted 16.4.19)
- Ph1 SUPERSEDED Drainage Design report (submitted 16.4.19)
- Ph1 BHSM_KG_ENG_500 Rev D - Detailed Engineering Layout 1_500 (submitted 16.4.19)
- Ph1 BHSM_KG_ENG_525 Rev E - Private Drainage Layout 1_200 (submitted 16.4.19)
- Ph1 SUPERSEDED BHSM_KG_ENG_535 Rev B - Flood Routing Plan (submitted 16.4.19)
- Ph1 BHSM_KG_ENG_720 Rev C - Private Kerbing & Materials Plan (submitted 16.4.19)
- Ph1 Landowner/promotor (via Savills) letter 15.2.19 agreement to drainage works (submitted 16.4.19)
- Ph1 LLFA response objection 25.4.19
- Ph1 LLFA Response 16.04.2019
- Ph1 Email Dave Hughes RACE to LLFA 1.5.19
- Ph1 BHSM_KG_ENG_535 Rev D - Flood Routing Plan
- Ph1 BHSM_KG_ENG_557 Rev D - Typical Balancing Pond Details
- Ph1 BHSM_KG_ENG_558 Rev C - Typical Swale Details
- Ph1 BHSM_KG_ENG_576 Rev A - Long Sections Sheet 7
- Ph1 BHSM_KG_ENG_715 Rev B - Typical Check Dam Detail
- Ph1 Drainage Design Report BSM_KG_SW_1in2_30_100+40
- Ph1 Longitudinal Sections Sheet 7 Of 7 Dwg No. ENG_576 Rev A
- Ph1 Typical Swale Details Dwg No. ENG_558 Rev C
- Ph1 Drainage Design Report prepared by Causeway
- Ph1 Typical Check Dam Detail Dwg No. ENG_715 Rev B
- Ph1 Typical Balancing Pond Details Dwg No. ENG_557 Rev D
- Ph1 Flood Routing Plan Dwg No. ENG_535 Rev D
- Ph1 WCC LLFA response 22.5.19 (no objection)
- Ph1 LLFA Response 22.05.2019
- SUPERSEDED 21 - Road and Sewer Long Section - Sheet 1, rec d 12.06.19
- SUPERSEDED 22 - Road and Sewer Long Section - Sheet 2, rec d 12.06.19
- SUPERSEDED 23 - Road and Sewer Long Section - Sheet 3, rec d 12.06.19
- SUPERSEDED 24 - Road and Sewer Long Section - Sheet 4, rec d 12.06.19
- SUPERSEDED 25 - Road and Sewer Long Section - Sheet 5, rec d 12.06.19
- SUPERSEDED 26 - Road and Sewer Long Section - Sheet 6, rec d 12.06.19
- SUPERSEDED 27 - Road and Sewer Long Section - Sheet 7, rec d 12.06.19
- SUPERSEDED 28 - Road and Sewer Long Section - Sheet 8, rec d 12.06.19
- SUPERSEDED 29 - Road and Sewer Long Section - Sheet 9, rec d 12.06.19
- SUPERSEDED 30 - Road and Sewer Long Section - Sheet 10, rec d 12.06.19
- SUPERSEDED 1F - Drainage Strategy - Phase 2a - Sheet 1, rec d 13.06.19
- SUPERSEDED 2F - Drainage Strategy - Phase 2a - Sheet 2, rec d 13.06.19
- SUPERSEDED 3F - Drainage Strategy - Phase 2a - Sheet 3, rec d 13.06.19
- SUPERSEDED 4F - Drainage Strategy - Phase 2a - Sheet 4, rec d 13.06.19
- SUPERSEDED 5F - Drainage Strategy - Phase 2a - Sheet 5, rec d 13.06.19
- SUPERSEDED 6F - Drainage Strategy - Phase 2a - Sheet 6, rec d 13.06.19
- GLH Phasing Plan
- EA acknowledgement 14.06.19
- Ph2 Environment Agency Response 24.06.2019
- Ph2a Drainage Report 19002 Travis Baker 24.6.19
- Ph2a Drainage Report 19002 Travis Baker 24.6.19
- Ph2 LLFA objection 1.7.19
- Ph2 LLFA objection 1.7.19
- PH1 Engineering Layout 1:500 Sheet 1 Of 3 Dwg No. ENG_500 Rev M
- PH1 Typical Headwall Details Sheet 1 Dwg No. ENG_553 Rev E
- PH1 Typical Headwall Details Sheet 2 Dwg No. ENG_554 Rev B
- Ph2 Response to LLFA comments (Travis Baker 30.8.19)
- Typical Pond Section Dwg No. 10B
- Watercourse And Ponds Schematic Dwg No. 11
- Flood Route Plan (Phase 2a) Dwg No. 12B
- Flood Route Plan (Phase 2a) Dwg No. 13B
- Flood Route Plan (Phase 2a) Dwg No. 14B
- Road And Sewer Long Section - Sheet 11 Dwg No. 33A
- Road And Sewer Long Section - Sheet 12 Dwg No. 34A
- Attenuation Pond A Dwg No. 35A
- Attenuation Pond B Dwg No. 36A
- Attenuation Pond C Dwg No. 37A
- Drainage Strategy - Phase 2A - Sheet 1 Dwg No. 19002 1 Rev H
- Drainage Strategy - Phase 2A - Sheet 2 Dwg No. 19002 2 Rev H
- Drainage Strategy - Phase 2A - Sheet 3 Dwg No. 19002 3 Rev H
- Drainage Strategy - Phase 2A - Sheet 4 Dwg No. 19002 4 Rev H
- Drainage Strategy - Phase 2A - Sheet 5 Dwg No. 19002 5 Rev H
- Drainage Strategy - Phase 2A - Sheet 6 Dwg No. 19002 6 Rev G
- Road And Sewer Long Section - Sheet 1 Dwg No. Dwg No. 19002 21 Rev B
- Road And Sewer Long Section - Sheet 2 Dwg No. Dwg No. 19002 22 Rev B
- Road And Sewer Long Section - Sheet 3 Dwg No. Dwg No. 19002 23 Rev B
- Road And Sewer Long Section - Sheet 4 Dwg No. Dwg No. 19002 24 Rev B
- Road And Sewer Long Section - Sheet 5 Dwg No. Dwg No. 19002 25 Rev B
- Road And Sewer Long Section - Sheet 6 Dwg No. Dwg No. 19002 26 Rev B
- Road And Sewer Long Section - Sheet 7 Dwg No. Dwg No. 19002 27 Rev B
- Road And Sewer Long Section - Sheet 8 Dwg No. Dwg No. 19002 28 Rev B
- Road And Sewer Long Section - Sheet 9 Dwg No. Dwg No. 19002 29 Rev B
- Road And Sewer Long Section - Sheet 10 Dwg No. Dwg No. 19002 30 Rev B
- LLFA Response 13.09.2019
- WFRS Response 23.09.2019
- DISC/00225/19 Decision Notice
- DISC/00065/19 Decision Notice
- VCSR Cover Letters (DISC/00367/20)
- VCSR Application Form (DISC/00367/20)
- VCSR Site Location Plan Dwg No. 18196 SK01 Rev C
- SUPERSEDED VCSR Village Centre Drainage Layout - Sheet 1 Dwg No. 18196 VC-103 Rev D
- SUPERSEDED VCSR Village Centre Drainage Layout - Sheet 2 Dwg No. 18196 VC-104 Rev D
- VCSR LLFA consultation response (objection)
- VCSR MI-108E S104 Drainage Layout - Sheet 4
- VCSR S104 tech compliance letter 21.09.20
- VCSR SUDs and headwall maintenance schedule
- VCSR US20-03008-Approval Paperwork
- VCSR VC-103E - Drainage Layout - Sheet 1
- VCSR VC-104E - Drainage Layout - Sheet 2
- VCSR VC-201B - Road and Sewer Long Section - Sheet 1
- VCSR VC-201B - Road and Sewer Long Section - Sheet 1
- VCSR VC-501 - Manhole Schedules
- VCSR Agent email 28.9.20
- VCSR LLFA 2nd response 12.10.20 objection
- VCSR Agent email 2.11.20 + Drawing MI-124A + Calcs
- VCSR LLFA 3rd 13.11.20 objection
- VCSR Withdrawn Letter 15.09.21
- (Ph 2b/Parcel C2) Application Form (DISC/00071/22), rec d 17.02.22
- (Ph 2b/Parcel C2) Agent cover letter, rec d 17.02.22
- SUPERSEEDED----(Ph 2b/Parcel C2) Preliminary Finished Floor Levels and Drainage Strategy Drawing No 19002 C2-1, rec d 17.02.22
- SUPERSEEDED----(Ph 2b/Parcel C2) Preliminary Road and Sewer Long Section - Sheet 1 Drawing No 19002 C1-4, rec d 17.02.22
- SUPERSEEDED----(Ph 2b/Parcel C2) Preliminary Road and Sewer Long Section - Sheet 2 Drawing No 19002 C2-5, rec d 17.02.22
- Ph2b - LLFA objection 22.3.22
- 2d2e Cover Letter (DISC/00205/22) rec d 23.05.22
- 2d2e Application Form (DISC/00205/22) rec d 23.05.22
- 2d2e Parcel B6 - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 B6-1
- 2d2e Parcel A3 - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 A3-1 Rev B
- 2d2e Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-1
- 2d2e Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-2
- 2d2e Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-3
- 2d 2e LLFA objection 24.6.22
- MI-108G S104 Drainage Layout - Sheet 4[22].pdf rec 25.7.22
- MI-105K S104 Drainage Layout - Sheet 1[63].pdf rec 25.7.22
- MI-106H S104 Drainage Layout - Sheet 2[75].pdf rec 25.7.22
- MI-107H S104 Drainage Layout - Sheet 3[68].pdf rec 25.7.22
- MI-1004 - Section 104 Drainage Layout - Sheet 2[80].pdf rec 25.7.22
- MI-1003 - Section 104 Drainage Layout - Sheet 1.pdf rec 25.7.22
- 19002-SW NETWORK 2 CALCULATIONS.xlsx rec 25.7.22
- 19002-SW NETWORK 3 CALCULATIONS.xlsx rec 25.7.22
- 2d2e LLFA objection (23.8.22)
- (A4b of Ph 2d) Application Form (DISC/00041/23) rec d 01.02.23
- SUPERSEDED(A4b of Ph 2d) Preliminary Finished Floor Levels and Drainage Strategy Dwg No 19002 A4b-1 Rev A, rec d 01.02.23
- (A4b of Ph 2d) Cover Letter
- (A4b of Ph 2d) Application Form
- A4b of 2d LLFA objection 20.2.23
- A4b of 2d Agent email 26.4.23
- SUPERSEDED A4b of 2d A4b-1C Preliminary Finished Floor Levels and Drainage Strategy (Rec d 26.4.23)
- Severn Trent Response 23.05.2023
- A4b A4b-1D Preliminary Finished Floor Levels and Drainage Strategy (Rec d 11.8.23)
- A4b 17066-A4-001H - Site Layout A4b
- A4b 19002 - Kingston Grange Parcel A4b LLFA Technical Note
- A4b 1054949 - Land Off Banbury Road, Warwick - Technical Compliance
- A4b A4-102 B - Section 104 Layout
- A4b A4-108A - Flood Route Plan
- SUPERSEDED A4b A4-701A - Private Drainage - Sheet1
- A4b A4-702A - Private Drainage - Sheet2
- A4b MI-107H S104 Drainage Layout - Sheet 3
- A4b MI-124B Flood Route Plan - Sheet 2
- Application Form Redacted
- Phase 2e Parcel A3 - Parcel A3 (Phase 2E) Preliminary Road and Sewer Long Section Drawing No. 19002 A3-6 Rev. C
- Phase 2e Parcel A3 - Parcel A3 - Preliminary Road and Sewer Long Sections Drawing No. 19002 A3-7 Rev. C
- Phase 2e Parcel A3 - Parcel A3 (Phase E) Preliminary FFL s and Drainage Strategy Drawing No. 19002 A3-1 Rev. F
- A4b LLFA Objection 18.12.23
- Agent email 28.2.24
- A4b A4-701B - Private Drainage - Sheet1 (Rec d 28.2.24)
- A4b 19002 hydraulic calcs (storm) Network 2 (SW Detailed Design pfd 19.02.24 (Rec d 28.2.24)
- A4b 19002-1001 SW Outfall Plan (Rec d 28.2.24)
- A4b LLFA Response 19.03.2024
- DISC/00041/23 Decision Notice
- Cover Letter
- Application Form
- Parcel B6 - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. B6-1 Rev B
- Parcel B6 - Preliminary Road And Sewer Long Sections - Sheet 1 Dwg No. B6-6 Rev A
- Parcel B6 - Preliminary Road And Sewer Long Sections - Sheet 2 Dwg No. B6-7 Rev A
- Parcel B6 - Preliminary Road And Sewer Long Sections - Sheet 3 Dwg No. B6-8 Rev A
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 1 Dwg No. MI-105 Rev K
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 2 Dwg No. MI-106 Rev H
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 3 Dwg No. MI-107 Rev H
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 4 Dwg No. MI-108 Rev F
- (Ph 2b/Parcel C2) Parcel C2 Section 104 Drainage Layout Dwg No. C2-102
- (Ph 2b/Parcel C2) Preliminary Road And Sewer Long Section - Sheet 1 Dwg No. C2 ALT-4
- (Ph 2b/Parcel C2) Preliminary Road And Sewer Long Section - Sheet 2 Dwg No. C2 ALT-5
- (Ph 2b/Parcel C2) Main Infrastructure Pond Cross Section - Sheet 1 Dwg No. MI-410 Rev B
- (Ph 2b/Parcel C2) Main Infrastructure Pond Cross Section - Sheet 2 Dwg No. MI-411 Rev B
- (Ph 2b/Parcel C2) Parcel C2 Flood Route Plan Dwg No. C22-108
- (Ph 2b/Parcel C2) Main Infrastructure - Drainage Construction Detail - Flow Control - Sheet 1 Dwg No. MI-402 Rev B
- (Ph 2b/Parcel C2) Main Infrastructure - Drainage Construction Detail - Flow Control - Sheet 2 Dwg No. MI-403 Rev B
- (Ph 2b/Parcel C2) Preliminary FFL s and Drainage Strategy Dwg No. C2 ALT-1 Rev B
- 2b LLFA objection 29.4.24
- (Ph 2D and 2E) Application Form
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-3 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-1 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-3-1 Rev A
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-2 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Flood Route Plan Sheet 1 Dwg No. MI-19
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Flood Route Plan Sheet 2 Dwg No. MI-20
- 2D 2E SUPERSEDED Drainage Report For Phase 2D/2E Main Infrastructure Drainage dated 09.07.24
- (Ph 2D and 2E) Road And Sewer Long Section - Sheet 4 Dwg No. 24 Rev B
- (Ph 2D and 2E) Flood Route Plan Phase 2a Dwg No. 13 Rev B
- (Ph 2D and 2E) FW Outfall Plan Dwg No. FW-OUT-1002
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Road And Sewer Long Sections Dwg No. MI-12 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Road And Sewer Long Sections Dwg No. MI-13 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Road And Sewer Long Sections Dwg No. MI-14 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Sheet 3 Dwg No. MI-21
- 2eA3 LLFA response 19.1.24
- (Ph 2D and 2E) LLFA Response 23.08.2024
- 2d2e LLFA response 23.8.24
- 2d2e Response 2.9.24 to LLFA objection
- 2d2e 19002 2E_2D Main infrastructure Drainage Report - rev A (Dated
- 2d2e LLFA 27.9.24
CONDITIONS 030
- Ph1 30 Drainage Strategy Plan Sheet 1 Dwg No. P_ENG_007 Rev D
- Ph1 30 Drainage Strategy Plan Sheet 2 Dwg No. P_ENG_008 Rev C
- Ph1 Severn Trent Response 15.03.2019
- SUPERSED 21 - Road and Sewer Long Section - Sheet 1, 12.06.19
- SUPERSEDED 22 - Road and Sewer Long Section - Sheet 2, rec d 12.06.19
- SUPERSEDED 23 - Road and Sewer Long Section - Sheet 3, rec d 12.06.19
- SUPERSEDED 24 - Road and Sewer Long Section - Sheet 4, rec d 12.06.19
- SUPERSEDED 25 - Road and Sewer Long Section - Sheet 5, rec d 12.06.19
- SUPERSEDED 26 - Road and Sewer Long Section - Sheet 6
- SUPERSEDED 27 - Road and Sewer Long Section - Sheet 7, rec d 12.06.19
- SUPERSEDED 28 - Road and Sewer Long Section - Sheet 8, rec d 12.06.19
- SUPERSEDED 29 - Road and Sewer Long Section - Sheet 9, rec d 12.06.19
- SUPERSEDED 30 - Road and Sewer Long Section - Sheet 10, rec d 12.06.19
- SUPERSEDED 1F - Drainage Strategy - Phase 2a - Sheet 1, rec d 13.06.19
- SUPERSEDED 2F - Drainage Strategy - Phase 2a - Sheet 2, rec d 13.06.19
- SUPERSEDED 3F - Drainage Strategy - Phase 2a - Sheet 3, rec d 13.06.19
- SUPERSEDED 4F - Drainage Strategy - Phase 2a - Sheet 4, rec d 13.06.19
- SUPERSEDED 5F - Drainage Strategy - Phase 2a - Sheet 5, rec d 13.06.19
- SUPERSEDED 6F - Drainage Strategy - Phase 2a - Sheet 6, rec d 13.06.19
- GLH Phasing Plan
- 6F - Drainage Strategy - Phase 2a - Sheet 6, rec d 13.06.19
- EA acknowledgement 14.06.19
- Ph2a Drainage Report 19002 Travis Baker 24.6.19
- Ph2a Drainage Report 19002 Travis Baker 24.6.19
- Ph2 Environment Agency Response 24.06.2019
- Typical Pond Section Dwg No. 10B
- Watercourse And Ponds Schematic Dwg No. 11
- Flood Route Plan (Phase 2a) Dwg No. 12B
- Flood Route Plan (Phase 2a) Dwg No. 13B
- Flood Route Plan (Phase 2a) Dwg No. 14B
- Road And Sewer Long Section - Sheet 11 Dwg No. 33A
- Road And Sewer Long Section - Sheet 12 Dwg No. 34A
- Attenuation Pond A Dwg No. 35A
- Attenuation Pond B Dwg No. 36A
- Attenuation Pond C Dwg No. 37A
- Drainage Strategy - Phase 2A - Sheet 1 Dwg No. 19002 1 Rev H
- Drainage Strategy - Phase 2A - Sheet 2 Dwg No. 19002 2 Rev H
- Drainage Strategy - Phase 2A - Sheet 3 Dwg No. 19002 3 Rev H
- Drainage Strategy - Phase 2A - Sheet 5 Dwg No. 19002 5 Rev H
- Drainage Strategy - Phase 2A - Sheet 6 Dwg No. 19002 6 Rev G
- Road And Sewer Long Section - Sheet 1 Dwg No. Dwg No. 19002 21 Rev B
- Road And Sewer Long Section - Sheet 2 Dwg No. Dwg No. 19002 22 Rev B
- Road And Sewer Long Section - Sheet 3 Dwg No. Dwg No. 19002 23 Rev B
- Road And Sewer Long Section - Sheet 4 Dwg No. Dwg No. 19002 24 Rev B
- Road And Sewer Long Section - Sheet 5 Dwg No. Dwg No. 19002 25 Rev B
- Road And Sewer Long Section - Sheet 6 Dwg No. Dwg No. 19002 26 Rev B
- Road And Sewer Long Section - Sheet 7 Dwg No. Dwg No. 19002 27 Rev B
- Road And Sewer Long Section - Sheet 8 Dwg No. Dwg No. 19002 28 Rev B
- Road And Sewer Long Section - Sheet 9 Dwg No. Dwg No. 19002 29 Rev B
- Road And Sewer Long Section - Sheet 10 Dwg No. Dwg No. 19002 30 Rev B
- DISC/00225/19 Decision Notice
- DISC/00065/19 Decision Notice
- (Ph 2b/Parcel C2) Application Form (DISC/00063/22), rec d 17.02.22
- (Ph 2b/Parcel C2) Agent cover letter, rec d 17.02.22
- (Ph 2b/Parcel C2) Preliminary Finished Floor Levels and Drainage Strategy Drawing No 19002 C2-1, rec d 17.02.22
- (Ph 2b/Parcel C2) Preliminary Road and Sewer Long Section - Sheet 1 Drawing No 19002 C1-4, rec d 17.02.22
- (Ph 2b/Parcel C2) Preliminary Road and Sewer Long Section - Sheet 2 Drawing No 19002 C2-5, rec d 17.02.22
- 2d2e Cover Letter
- 2d2e Application Form
- 2d2e Parcel B6 - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 B6-1
- 2d2e Parcel A3 - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 A3-1 Rev B
- 2d2e Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-1
- 2d2e Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-2
- 2d2e Main Infrastructure - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. 19002 MI-3
- (A4b of Ph 2d) Application Form (DISC/00045/23) rec d 01.02.23
- SUPERSEDED(A4b of Ph 2d) Preliminary Finished Floor Levels and Drainage Strategy Dwg No 19002 A4b-1 Rev A, rec d 01.02.23
- (A4b of Ph 2d) Cover Letter
- (A4b of Ph 2d) Application Form
- A4b of 2d Agent email 26.4.23
- SUPERSEDED A4b of 2d A4b-1C Preliminary Finished Floor Levels and Drainage Strategy (Rec d 26.4.23)
- A4b Severn Trent Response 23.05.2023
- A4b A4b-1D Preliminary Finished Floor Levels and Drainage Strategy (Rec d 11.8.23)
- A4b A4-102 B - Section 104 Layout
- A4b A4-701A - Private Drainage - Sheet1
- A4b A4-702A - Private Drainage - Sheet2
- A4b MI-107H S104 Drainage Layout - Sheet 3
- Application Form Redacted
- Phase 2e Parcel A3 - Parcel A3 (Phase 2E) Preliminary Road and Sewer Long Section Drawing No. 19002 A3-6 Rev. C
- Phase 2e Parcel A3 - Parcel A3 - Preliminary Road and Sewer Long Sections Drawing No. 19002 A3-7 Rev. C
- Phase 2e Parcel A3 - Parcel A3 (Phase E) Preliminary FFL s and Drainage Strategy Drawing No. 19002 A3-1 Rev. F
- Phase 2e Parcel A3 LLFA Response 19.01.2024
- Application Form
- Parcel B6 - Preliminary Finished Floor Levels And Drainage Strategy Dwg No. B6-1 Rev B
- Parcel B6 - Preliminary Road And Sewer Long Sections - Sheet 1 Dwg No. B6-6 Rev A
- Parcel B6 - Preliminary Road And Sewer Long Sections - Sheet 2 Dwg No. B6-7 Rev A
- Parcel B6 - Preliminary Road And Sewer Long Sections - Sheet 3 Dwg No. B6-8 Rev A
- (Ph 2b/Parcel C2) Main Infrastructure - Drainage Construction Detail - Flow Control - Sheet 1 Dwg No. MI-402 Rev B
- (Ph 2b/Parcel C2) Main Infrastructure - Drainage Construction Detail - Flow Control - Sheet 2 Dwg No. MI-403 Rev B
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 1 Dwg No. MI-105 Rev K
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 2 Dwg No. MI-106 Rev H
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 3 Dwg No. MI-107 Rev H
- (Ph 2b/Parcel C2) Main Infrastructure - Section 104 Drainage Layout - Sheet 4 Dwg No. MI-108 Rev F
- (Ph 2b/Parcel C2) Preliminary Road And Sewer Long Section - Sheet 1 Dwg No. C2 ALT-4
- (Ph 2b/Parcel C2) Preliminary Road And Sewer Long Section - Sheet 2 Dwg No. C2 ALT-5
- (Ph 2b/Parcel C2) Preliminary FFL s and Drainage Strategy Dwg No. C2 ALT-1 Rev B
- (Ph 2b/Parcel C2) Parcel C2 Section 104 Drainage Layout Dwg No. C2-102
- (Ph 2b/Parcel C2) Main Infrastructure Pond Cross Section - Sheet 1 Dwg No. MI-410 Rev B
- (Ph 2b/Parcel C2) Main Infrastructure Pond Cross Section - Sheet 2 Dwg No. MI-411 Rev B
- (Ph 2b/Parcel C2) Parcel C2 Flood Route Plan Dwg No. C22-108
- (Ph 2D and 2E) Application Form
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-3 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-1 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-3-1 Rev A
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Preliminary FFL S & Drainage Strategy Dwg No. MI-2 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Flood Route Plan Sheet 1 Dwg No. MI-19
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Flood Route Plan Sheet 2 Dwg No. MI-20
- (Ph 2D and 2E) Drainage Report For Phase 2D/2E Main Infrastructure Drainage dated 09.07.24
- (Ph 2D and 2E) Road And Sewer Long Section - Sheet 4 Dwg No. 24 Rev B
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Road And Sewer Long Sections Dwg No. MI-12 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Road And Sewer Long Sections Dwg No. MI-13 Rev D
- (Ph 2D and 2E) Main Infrastructure (Phase 2D & 2E) Road And Sewer Long Sections Dwg No. MI-14 Rev D
CONDITIONS 031
- Ph2a+2c Application Form.
- Ph2a+2c Covering Letter from Jason Tait Planning Prospects.
- SUPERSEDED Ph2a+2c Dwg No: 21901/106 Rev B (EA Requirements Condition 31 Phase 2A/2C)
- GLH Phasing Plan
- Ph2 Environment Agency Response 17.06.2019
- Officer Response 02.07.2019
- Ph2 DISC/00205/19 Decision Notice
- Application Form.
- EA Requirements Condition 31 Phase 2A/2C Dwg No: 21901/106 Rev D.
- Tree Protection and Removals Phase 2A/2C (1of2) Dwg No: 21901/102 Rev F.
- Tree Protection and Removals Phase 2A/2C (2 of2) Dwg No: 21901/103 Rev F.
- Phase 2a - Landscape and Ecology Management Plan Ref No: edp5292_r005a.
- Phase 2c - Landscape and Ecology Management Plan Ref No: edp5292_r006a.
- WCC Ecology Response 08.11.2019
- Environment Agency Response 13.11.2019
CONDITIONS 032
- Ph1 32 Fire Tender Tracking - Locations Dwg No. P_ENG_410 Rev D
- Ph1 32 Fire Tender Tracking - Sheet 2 Dwg No. P_ENG_411 Rev D
- Ph1 WFRS Response 01.03.2019
- Ph1 Fire Tender Tracking - Sheet 2 Dwg No. P_ENG_411 Rev H
- Ph1 Fire Tender Tracking - Locations Dwg No. P_ENG_410 Rev H
- SUPERSEDED Severn Trent Water AMP6 Design And Build Requisition Dwg No. A6W/12209/04/09/80-CY-0101
- Ph1 WFRS Response 04.03.2019
- GLH Phasing Plan
- Ph1 Agent email 21.6.19
- Ph1 Bellway email correspondence
- SUPERSEDED Ph1 D_7339_Mains Kingston Grange, Lighthorne - 8342325 18.04.19
- Ph1 Agent email
- Ph1 Bellway emails
- Ph1 Severn Trent Water AMP6 Design And Build Requisition Dwg No. A6W/12209/04/09/80-CY-0101 Rev C (Received 11.7.19)
- Severn Trent Water AMP6 Design And Build Requisition Dwg No. A6W/12209/04/09/80-CY-0101 Rev C (recieved 11.7.19)
- Ph1 Warwickshire Fire & Rescue response 18.07.19
- DISC/00065/19 Decision Notice
- Application Form (DISC/00502/19
- Cover Letter (DISC/00502/19)
- Banbury Road, Warwick Chase Dwg No. A6W/12779/04/09/14-CY-0101 Rev A (DISC/00502/19)
- Banbury Road, Warwick Chase Dwg No. A6W/12779/04/09/14-CY-0102 Rev A (DISC/00502/19)
- WFRS Response 30.12.2019
- Water Supply Request – Fire Hydrant Requirements
- Officer Response 05.08.2020
- Ph2D A4b Cover Letter
- Ph2D A4b Application Form
- Ph2D A4b Severn Trent Water AMP7 Design & Build Requisition Dwg No. A7W/14055/04/02/60-CY-0101
- Ph2D A4b Severn Trent Water AMP7 Design & Build Requisition Dwg No. A7W/14055/04/02/60-CY-0102
- Ph2D A4b Severn Trent Water AMP7 Design & Build Requisition Dwg No. A7W/14055/04/02/60-CY-0103
- DISC/00036/24 Decision Notice
- 2B C2 Covering Letter
- 2B C2 Application Form Redacted
- 2B C2 Banbury Road, Warwick Chase Plan Drawing No. A7W/13737/04/04/65-CY-0101
- 2B C2 WFRS response 15.7.24
- DISC/00264/24 Decision Notice
CONDITIONS 033
- Ph1 33A Phase 1 Review And Phase 2 Strategic GEO-Environmental Assessment prepared by Geo Environmental Group
- Ph1 33A Appendix A to Geo Environmental Assessment
- Ph1 33A Appendix B to Geo Environmental Assessment
- Ph1 33A Appendix C to Geo Environmental Assessment
- Ph1 33A Appendix D to Geo Environmental Assessment
- Ph1 33A Appendix E to Geo Environmental Assessment
- Ph1 33A Appendix F to Geo Environmental Assessment
- Ph1 33A Environmental Health Response 20.03.2019
- GLH Phasing Plan
- Application Form.
- Covering Letter from Planningprospects.
- Phase 1 Review and Phase 2 Strategic Geo-Environmental Assessment Project Ref:GEG-14-315/P2
- Appendix A Figures and Plans
- Appendix B Part 1 Photographic Record.
- Appendix B Part 2 Photographic Records.
- Appendix C Exploratory Hole Logs.
- Appendix D Chemical Analysis Results
- Appendix E Statistical Assessment of Chemical Results.
- Appendix F Geotechnical Testing.
- Environmental Health Response 28.10.2019
- DISC/00065/19 Decision Notice
- Phasing Plan To Discharge Planning Conditions 10B (a) And (b) Dwg No. 002 Rev 08
- Additional Ground Investigation prepared by georisk management
- Environmental Health 11.2.20
- (Ph2b-2f) Application Form (DISC/00469/21)
- (Ph2b-2f) Cover Letter
- Ph2b-f email Agent 14.3.22
- Ph2b-f Georisk Remediation Method Statement and Validation PLan No. 18318/3 (Feb 2022)
- Environmental Health Response 06.05.2022
- DISC/00469/21 Decision Notice
CONDITIONS 036
- Ph1 Tree Protection Plan Dwg No. BHSM/T001 Rev V
- Ph2a+2c Application Form DISC/00226/19 (36), rec d 12.09.19
- Ph2a+2c Agent cover letter dated 31.05.19, rec d 12.06.19
- SUPERSEDED 21901-102-TREE PROTECTION REMOVALS-1of2-RevC, rec d 12.06.19
- SUPERSEDED 21901-103-TREE PROTECTION REMOVALS-2of2-RevC, rec d 12.06.19
- GLH Phasing Plan
- SUPERSEDED Ph1 Arboricultural Method Statement RT-MME-150065 (June 2019 Middlemarch)
- SUPERSEDED - ARBORICULTURAL METHOD STATEMENT rt-mme-150065 (AMS)
- Ph1 ARBORICULTURAL METHOD STATEMENT rt-mme-150065 (AMS) Rev A
- Ph1 ARBORICULTURAL METHOD STATEMENT rt-mme-150065 (AMS) Rev A
- SUPERSEDED----Tree Protection And Removals Phase 2A/2C (1 Of 2) Dwg No. 21901/102 Rev E
- SUPERSEDED----Tree Protection And Removals Phase 2A/2C (2 Of 2) Dwg No. 21901/103 Rev E
- SUPERSEDED----Ph2c 21901-102-TREE PROTECTION & REMOVALS-1of2-RevF
- SUPERSEDED----Ph2c 21901-103-TREE PROTECTION & REMOVALS-2of2-RevF
- SUPERSEDED ph2a 21901-102-TREE PROTECTION & REMOVALS-1of2-RevF
- SUPERSEDED ph2a 21901-103-TREE PROTECTION & REMOVALS-2of2-RevF
- Ph1 DISC/00065/19 Decision Notice
- Ph 2a + Ph2c Tree Protection And Removals Phase 2A/2C (1 Of 2) Dwg No. 21901/102 Rev J
- Ph 2a + Ph2c Tree Protection And Removals Phase 2A/2C (2 Of 2) Dwg No. 21901/103 Rev J
- SUPERSEDED Arboricultural Method Statement prepared by Taylor Wimpey
- Ph2a + Ph2c Arboricultural Method Statement CE-UL1650-RP01A-Final dated 9.1.20
- Officer Response 09.01.2020
- B4100 Cover Letter
- B4100 Application Form
- B4100 Arboricultural Method Statement Rev A dated 9 January 2020
- B4100 Tree Protection Plan (Sheet 1 Of 5) Dwg No. DW01-01
- B4100 Tree Protection Plan (Sheet 2 Of 5) Dwg No. DW01-02
- B4100 Tree Protection Plan (Sheet 3 Of 5) Dwg No. DW01-03
- B4100 Tree Protection Plan (Sheet 4 Of 5) Dwg No. DW01-04
- B4100 Tree Protection Plan (Sheet 5 Of 5) Dwg No. DW01-05
- B4100 WIE14591-SA-S278-201 - Site Clearance E02-Sheet 1
- B4100 WIE14591-SA-S278-202 - Site Clearance E02-Sheet 2
- B4100 WIE14591-SA-S278-203 - Site Clearance E02-Sheet 3
- B4100 WIE14591-SA-S278-204 - Site Clearance E03-Sheet 4
- B4100 WIE14591-SA-S278-601 - Earthworks E02-Sheet 1
- B4100 WIE14591-SA-S278-602 - Earthworks E02-Sheet 2
- B4100 WIE14591-SA-S278-603 - Earthworks E02-Sheet 3
- B4100 WIE14591-SA-S278-604 - Earthworks E02-Sheet 4
- B4100 WIE14591-SA-S278-101 - General Arrangement - E01-Sheet 1
- B4100 WIE14591-SA-S278-202 - Site Clearance E02-Sheet 2
- B4100 WIE14591-SA-S278-103 - General Arrangement - E01-Sheet 3
- B4100 WIE14591-SA-S278-104 - General Arrangement - E01-Sheet 4
- Decision Letter 10.03.21 (cond 36) DISC/00334/20 (B4100)
- Ph2b,d,e Application Form (DISC/00027/22)
- Ph2b,d,e Cover Letter (DISC/00027/22)
- SUPERSEDED Ph2b,d,e Retention and Removal Plan Phase 2B 2D and 2E Dwg No. CE-UL-2030-DW03
- SUPERSEDED Ph2b,d,e Retention and Removal Plan Phases 2D and 2E Dwg No. CE-UL-2030-DW02
- Ph2b,d,e Arboricultural Method Statement Ref: CE-UL-2030-RP01-Draft V.1
- Ph2b,d,e CE-UL-2030-DW02-Rev A. Retention and Removal Plan. Phases 2D and 2E Rec d 11.2.22
- Ph2b,d,e CE-UL-2030-DW03-Rev A . Retention and Removal Plan. Phase 2B 2D and 2E rec d 11.2.22
- Decision DISC/00027/22 Ph2b,2d,2e
- DISC/00027/22 Decision Notice
- Ph2D A4b SUPERSEDED Utility and Landscaping Plan Dwg No 20145/ULP/001
- Ph2D A4b Cover Letter
- Ph2D A4b Application Form
- Ph2D A4b SUPERSEDED Utility and Landscaping Plan Dwg No 20145/ULP/001
- Ph2D A4b Cover Letter
- Ph2D A4b Application Form
- 2dA4b Agent email 8.5.24
- DISC/00085/24 Decision Notice
- 2b ApplicationFormRedacted
- 2b Cover letter
- 2b Parcel C2 Landscape Utility Overlay-Layout1 plan
CONDITIONS 038
- Ph1 38 Detailed Layout Noise Assessment/Mitigation Measures prepared by Brookbanks
- Ph1 38 Environmental Health Response 20.03.2019
- Ph1 38 Noise Mitigation Measures Plan BHSM/P014 Rev B
- Ph1 38 Noise Assessment Mitigation Measures Technical Note 10192TN38
- GLH Phasing Plan
- Application Form.
- Covering Letter from agent.
- Environmental Noise Survey and Assessment (Auto Repairs) Prepared 23 October 2019 Report No: 20521-1.
- Environmental Noise Survey and Assessment (Sub-Station) Prepared 30 August 2019 Report No: 20287-R1
- Environmental Noise Survey (B4100 Noise) Prepared 4 April 2019 Report No: 19911-1.
- SDC Environmental Health response to Report No.20521-1 rec d 22.11.19
- Email request to agent for further info 22.11.19
- SDC Environmental Health Response to report No. 19911-1 rec d 28.11.19
- Environmental Health Response 29.11.2019
- Officer Email To Agent 03.12.2019
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Plan Dwg No. 10192-NB-001 Rev B
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 1 Dwg No. 10192-NB-002 Rev B
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 2 Dwg No. 10192-NB-003 Rev B
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 3 Dwg No. 10192-NB-004 Rev A
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 4 Dwg No. 10192-NB-005 Rev A
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 5 Dwg No. 10192-NB-006 Rev A
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 6 Dwg No. 10192-NB-007 Rev A
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 7 Dwg No. 10192-NB-008 Rev A
- Ph2a M40 Noise Bund Details For Condition 28 Drawing Noise Bund Sections Sheet 8 Dwg No. 10192-NB-009 Rev A
- DISC/00065/19 Decision Notice (Phase 1)
- Environmental Noise Survey & Assessment (Sub-Station) prepared 5th December 2019 (20287)
- Environmental Noise Survey & Assessment (Auto Repair Garage) prepared 5th December 2019 (20521)
- Noise Consultant email to EHO
- Brookbanks Technical Note - detailed layout (M40) Noise Assessment & mitigation 7.10.19
- DISC/00439/19 Decision Notice
- (Ph 2B Parcel C2) Application Form (DISC/00335/22)
- (Ph 2B Parcel C2) Agent cover letter dated 17.08.22 (DISC/00335/22)
- SUPERSEDED (Ph 2B Parcel C2) Environmental Noise Survey report number 19911A-1 dated 13 January 2022 prepared by Noise.co.uk Ltd (DISC/00335/22)
- (Ph 2D & 2E) Application Form (DISC/00334/22)
- (Ph 2D & 2E) Agent cover letter dated 17.08.22 (DISC/00334/22)
- SUPERSEDED (Ph 2D & 2E) Environmental Noise Survey report number 19911A-1 dated 13 January 2022 prepared by Noise.co.uk Ltd (DISC/00334/22)
- Ph2b(C2) Noise Report 19911A-1-R1 (15 September 2022)
- SUPERSEDED Ph2d&2e Noise Report 19911A-1-R1 (15 September 2022)
- SUPERSEDED Ph2d 2e Noise UK Report 16064B-1 (12.12.22)
- SUPERSEDED Ph2b Noise UK Report 16064B-1 (12.12.22)
- Parcel A4b (of Phase 2d) Application Form
- SUPERSEDED Parcel A4b (of Phase 2d), Environmental Noise Survey Report No 16064B-1 prepared 12th December 2022 by Noise.co.uk Ltd
- Noise Report 16064B-1-R1 dated 14 April 2023 (Rec d 3.5.23)
- Ph2b Agent email 3.5.23 + Revised Noise Report + Comments
- Ph2d2e Agent email 3.5.23 + Revised Noise Report + Comments
- 2dA4b Ph2b Agent email 3.5.23 + Revised Noise Report + Comments
- Ph2dA4b SUPERSEDED 16064B-2-R2 - Technical Memo - A4B Kingston Grange - JS - 230626
- 16064B-2-R2 - Technical Memo 10 July 2023 - A4B Kingston Grange - JS - 230710 (Rec d 13.7.23)
- Non Material Amendment NOD 23/02899/AMD 21.11.23
- 2b noise.co.uk Technical Memo dated 20.11.23 (Rec d 21.11.23) 16064D-1 - Technical Memo -
- A4b 16064B-3-Technical Memo-A4B Kingston Grange noise.co.uk (Rec d 12.9.23)
- 2d MEC Acoustics and Overheating Assessment 22501-ENV-0401-A (Rec d 16.1.24)
- Ph2E A3 - Acoustic and overheating Assessment Report Ref 28582-ENV-0401-REV A - prepared by MEC Consulting Group dated February 2024
- Application Form
- Ph2E A3 - Cover Letter prepared by Planning Prospects Limited dated 21 February 2024
- Ph2E A3 - Acoustic and overheating Assessment Report Ref 28582-ENV-0401-REV A - prepared by MEC Consulting Group dated February 2024
- Application Form
- Ph2E A3 - Cover Letter prepared by Planning Prospects Limited dated 21 February 2024
- Application Form
- Acoustics and Overheating Assessment February 2024 Report Ref. 28577-ENV-0401 prepared by MEC
- 2dA4b 16064B-2-R3 - Technical Memo - A4B Kingston Grange - Dated 26 July 2023
- DISC/00040/23 Decision Notice
CONDITIONS 040
- SUPERSEDED 40 Construction And Environmental Management Plan prepared by Agent
- SUPERSEDED C40 PH1 Sales Area General Arrangement Dwg No. AN1/SK100 Rev P2
- SUPERSEDED C40 PH1 Construction And Environmental Management Plan prepared by Bellway
- SUPERSEDED C40 PH1 GTC CDM Construction Plan document Ref. GU-DPR-FM-1013 Part A Rev 02
- SUPERSEDED C40 PH1 Compound General Arrangements Dwg No. SK-AN1-2019-02-08-1500 Rev P1
- SUPERSEDED C40 PH1 Compound General Arrangements Dwg No. SK-AN1-2019-02-08-1500 Rev P3
- GLH Phasing Plan
- SUPERSEDED Ph1 CEMP Rev5 Construction Environment Management Plan (June 2019)
- Ph1 Arboricultural Method Statement (Appendix to CEMP) RT-MME-150065 (June 2019 Middlemarch)
- SUPERSEDED Ph1 Compound & Holding Area (SK-AN1-2019-19-1030 Rev P3) Received 19.6.19
- Ph1 Great Crested Newt Capture & Exclusion Measures Stage 2 (Fig E4a(i)) FPCR
- Ph1 Sales Area Plan (AN1-SK100 P3) Recieved 19.6.19
- SUPERSEDED CEMP Kingston Grange 2019 June
- Ph1 Great Crested Newts Figure E4a(i) - Capture & Exclusion Measures_with compound_compressed
- SUPERSEDED ARBORICULTURAL METHOD STATEMENT rt-mme-150065 (AMS)
- SUPERSEDED SK-AN1-2019-06-19-1030 Compound GA - Option P3-Layout1
- Ph1 AN1-SK100 P3 Sales Area Plan - Kings Grove
- Ph1 Environmental Health Response 25.06.2019
- Ph1 WCC Ecology 2.7.19
- WCC Ecology 2.7.19
- SUPERSEDED Ph1 CEMP Revision 6 (dated 05.07.19) Construction Environmental Management Plan
- Ph1 CEMP Rev 7 (Construction Environmental Management Plan) 19.7.19
- Email request to agent for further info 19.07.19
- SUPERSEDED Ph1 CEMP Rev 7
- Ph1 WCC Highways Response 01.08.2019
- SUPERSEDED Construction and Environmental Management Plan Revision 8
- Ph1 v9 Construction and Environmental Management Plan Revision 9
- DISC/00065/19 Decision Notice
- Ph2a DRAFT Construction Ecological Mitigation Plan edp5292_r009
- Ph2c DRAFT Construction Ecological Mitigation Plan edp5292_r010
- Ph2a&2c Application Form.
- Ph2a&2c Covering Letter from agent dated 23.04.2020-JV
- SUPERSEDED Ph2a&2c Construction Environmental Management Plan provided by Arcadis Version 03 dated April 2020.
- SUPERSEEDED - Ph2a & 2c Exit Strategy Dwg No. BWA01 WD101
- Ph2a & 2c Execution Plan Dwg No. H7897-EP-01 Rev A
- Ph2a & 2c Phase 1 & 2 Combined Build Phase Plan Dwg No. 20144/BPP/01B
- SUPERSEDED Ph2a & 2c Upper Lighthorne Warwickshire Project CEMP Plan Dwg No. 10030994-ARC-0100-DR-HE-0001
- SUPERSEDED Ph2a & 2c Upper Lighthorne Warwickshire Project Infrastructure Plan Dwg No. XXX-XX-SKETCH-0001
- Ph2a & 2c Tree Protection & Removals Phase 2A/2C (1 Of 2) Dwg No. 21901/102 Rev J
- Ph2a & 2c Tree Protection & Removals Phase 2A/2C (2 Of 2) Dwg No. 21901/103 Rev J
- SUPERSEEDED - Ph2a & 2c Phase 2a - Construction Ecological Mitigation Plan Report Ref. edp5292_r009
- SUPERSEEDED - Ph2a & 2c Phase 2c - Construction Ecological Mitigation Plan Report Ref. edp5292_r010
- SUPERSEEDED - Ph2a & 2c Landscape And Ecology Management Plan Report Ref. edp5292_r008a
- SUPERSEDED Ph2a & 2c Construction Environmental Management Plan dated April 2020
- Ph2a & 2c NB For illustrative purposes only not part of CEMP application - Existing Farm Road To Estate Road Farm Vehicle Tracking Direction 1 (Sheet 1 Of 2) Dwg No. T15034 SK302
- Ph2a & 2c NB For illustrative purposes only not part of CEMP application - Existing Farm Road To Estate Road Farm Vehicle Tracking Direction 2 (Sheet 2 Of 2) Dwg No. T15034 SK303
- Ph2a & 2c Gaydon/Lighthorne Heath New Settlement (Phases 2A And 2C) Construction Environmental Management Plan (CEnMP) dated July 2020 with Appendices
- SUPERSEDED Ph2a & 2c Gaydon/Lighthorne Heath New Settlement (Phases 2A And 2C) Construction Environmental Management Plan (CEnMP) dated July 2020
- Ph2a & 2c Appendix A.1 BWM Build Phase Plan Dwg No. BWA01 WD101
- Ph2a & 2c Appendix A.1 DW Build Phase Plan Dwg No. H7897-EP-01 Rev A
- Ph2a & 2c Appendix A.1 TW Build Phase Plan Dwg No. 20144/BPP/01B
- SUPERSEDED Ph2a & 2c Appendix A.2 - Project Infrastructure Plan Dwg No. XXX-XX-SKETCH-0001
- SUPERSEDED Ph2a & 2c Appendix A.2.1 Compound Drawing Dwg No. 20144/COM/01
- SUPERSEDED Ph2a & 2c Appendix A.2.2 - Routing Plan V1
- Ph2a & 2c Appendix A.3 21901-102-Tree Protection & Removals - Rev J
- Ph2a & 2c Appendix A.3 21901-103-Tree Protection & Removals - Rev J
- Ph2a & 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 1 Dwg No. DW01-01
- SUPERSEDED Ph2a & 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 2 Dwg No. DW01-02
- Ph2a & 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 3 Dwg No. DW01-03
- Ph2a & 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 4 Dwg No. DW01-04
- Ph2a & 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 5 Dwg No. DW01-05
- SUPERSEDED Ph2a Appendix B Phase 2a - Construction Ecological Mitigation Plan Ref. edp5292_r009
- SUPERSEDED Ph2c Appendix B Phase 2a - Construction Ecological Mitigation Plan Ref. edp5292_r010
- SUPERSEDED Ph2a & 2c Appendix C Landscape And Ecology Management Plan: Phases 2A And 2C Ref. edp5292_r008c
- Ward Member response 26.07.2020
- Ph2a 2c Environmental Health Response 31.07.2020
- Ph2a 2c WCC Ecology response 13.08.2020 (DISCN/00327/20)
- SUPERSEDED Construction Environmental Management Plan v2 August 2020
- Ph2a 2c Highways response 9.9.20
- Ph2a Construction Ecological Mitigation Plan submitted 6.10.20 edp5292_r009a_2A_CEcMP_public
- Ph2c Construction Ecological Mitigation Plan submitted 6.10.20 edp5292_r010a_2C_CEcMP_public
- SUPERSEDED Ph2a 2c Updated CEnMP October 2020 v3 with Appendices
- Ph2a 2c Appendix A.2.2 - Routing Plan (see also Routing Plan with housebuilders roundabout access)
- Ph2a 2c Appendix A.2.1 Barratt DB-SD13-008_A Generic Standard (External) Site Compound
- Ph2a 2c Appendix A.2.1 TW Typical Compound
- Ph2a 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v2.1-Sheet 2
- SUPERSEDED Ph2a 2c Appendix A.2.3 Temp Construction Access TM Plan
- SUPERSEDED Ph2a 2c Appendix A.2.4 Temp Access Clarification and Use Scenarios
- SUPERSEDED Ph2a 2c Appendix A.2.6 Delivery Control - Site Access
- Ph2a 2c Appendix A.2.7 WS-110A Site Access Sheet 3
- Ph2a 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 1
- Ph2a 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 3
- Ph2a 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 4
- Ph2a 2c Appendix A.3 CE-UL1682-DW02- Tree Protection Plan v1.2-Sheet 5
- SUPERSEDED Ph2a 2c Updated CEnMP October 2020 v3 (without appendices)
- Ph2a 2c Updated CEnMP October 2020 v4 with Appendices
- Ph2a 2c Updated CEnMP October 2020 v4 (without appendices)
- Ph2a 2c Appendix A.2.2.1 Temporary and Main Construction Access Points
- Ph2a 2c Appendix A.2.3 Temp Construction Access TM Plan v2
- Ph2a 2c Appendix A.2.4 Temp Access Clarification and Use Scenarios v4
- Ph2a 2c Appendix A.2.5 Delivery Control - crossing Location (1)
- Ph2a 2c Appendix A.2.6 Delivery Control - Site Access (1)
- Ph2a 2c Appendix A.2.7 WS-110A Site Access Sheet 3 (1)
- Ph2a 2c Appendix A.3 - Extent of Tree Surgery on T80
- Ph2a 2c Appendix A.3 Additional Protective Fencing (1)
- Ph2a 2c WCC Highways 14.10.20 no objection
- DISCN/00327/20 Decision Letter (Cond 40) Phases 2a & 2c 14.10.20
- Ph2a 2c Rights Of Way Response 09.10.2020
- 2dA4b Application Form redacted
- 2dA4b JT to SDC Gaydon Ph 2d A4b Cond 40 Covering Letter
- 2dA4b SUPERSEDED Construction Environmental Management Plan Addendum September 2023
- 2dA4b WCC Highways Response 18.10.2023
- 2dA4b WCC Ecology Response 23.10.2023
- 2dA4b WCC Rights Of Way Response 25.10.2023
- 2dA4b SUPERSEDED Construction Environmental Management Plan Oct 2023 (Rec d 2.11.23)
- 2dA4b Construction Environmental Management Plan Oct 2023 (Corrected)
- 2dA4b Agent email 7.11.23 amended CEMP
- 2dA4b WCC Ecology Response 22.11.2023
- DISC/00393/23 Decision Notice
- 2b Covering Letter
- 2b Application Form Redacted
- 2b SUPERSEDED Occupational Safety, Health and Environmental System Construction Phase Safety, Health and Environmental Plan Issue date: Oct 2021
- 2b Execution and Compound Plan Drawing No. H7736/EP/01
- 2b WCC Ecology Response 18.07.2024
- 2b WCC Highways 29.7.24
- 2b SUPERSEDED Addendum received 6.8.24 to Construction Phase Safety, Health & Environmental Plan Oct 2021
- 2b Construction Phase Safety, Health & Environmental Plan Addendum Rev A (Rec d 10.9.24)
- DISC/00265/24 Decision Notice
- DISC/00265/24 Decision Notice
CONDITIONS 041
- Ph1 41 Lighting Scheme Plan Dwg No. MMA 15037
- GLH Phasing Plan
- Ph1 Agent Correspondence 23.07.2019
- SUPERSEDED Outdoor Lighting Report dated 10 May 2019 prepared by MMA Lighting Consultancy Ltd
- SUPERSEDED Environmental Impact Assessment And Lighting Design Category Selection Process prepared by MMA Lighting Consultancy Ltd
- SUPERSEDED Lighting Design Rev R3 dated July 22 2019 prepared by MMA Lighting Consultancy Ltd
- SUPERSEDED Street Lighting Design Dwg No. MMA15037/001 Rev R3
- SUPERSEDED Risk Management Form dated 22.07.2019 prepared by MMA Lighting Consultancy Ltd
- Ph1 Environmental Health Response 12.08.2019
- WCC Ecology Response 28.08.2019
- SUPERSEDED Ph1 Kingston Grange, Warwickshire S38 - Proposed Lighting - Risk Assessments - R4
- SUPERSEDED Ph1 Kingston Grange, Warwickshire S38 - Proposed Lighting - Print to Scale - R4
- SUPERSEDED Ph1 Kingston Grange, Warwickshire S38 - Proposed Lighting - Design Document - R4
- SUPERSEDED Ph1 Kingston Grange, Warwickshire S38 - Proposed Lighting - Area Calc - R4
- Wcc Highways Response 11.09.2019
- Ph1 Electrical Connections Scedule Rev 4
- Ph1 S38 - Proposed Lighting - Design Document - R5
- Ph1 S38 - Proposed Lighting - Area Calc - R5
- Ph1 S38 - Proposed Lighting - Layout Drawing - R
- Ph1 S38 - Proposed Lighting - Connections Schedule - R5
- DISC/00065/19 Decision Notice
- Ph2a&2c Application Form (DISC/00182/20)
- Ph2a&2c Cover Letter (DISC/00182/20)
- SUPERSEDED Ph2a Proposed S38 Street Lighting Layout Parcel B1 + A1 (part) Dwg No. 01658-01 (DISC/00182/20)
- SUPERSEDED Ph2a Area Lighting Report - Parcel B2 Dwg No. 01658 AR1 (DISC/00182/20)
- SUPERSEDED Ph2a Proposed Spine Road Lighting and Illuminance Layout Dwg No. 2479-D-01 Rev C (DISC/00182/20)
- SUPERSEDED Ph2a Proposed Spine Road Lighting and Illuminance Layout Dwg No. 2479-D-02 Rev C (DISC/00182/20)
- SUPERSEDED Ph2a Proposed Spine Road Lighting and Illuminance Layout Dwg No. 2479-D-03 Rev C (DISC/00182/20)
- SUPERSEDED Ph2a Proposed Section 38 Parcel A2 Lighting and Illuminance Layout Dwg No. 2479-D-10 Rev C (DISC/00182/20)
- SUPERSEDED Ph2a Proposed Section 38 Parcel C1 Lighting and Illuminance Layout Dwg No. 2479-D-11 Rev C (DISC/00182/20)
- SUPERSEDED Ph2a Proposed Section 38 Parcel C2 (part) & A4 (part) Lighting and Illuminance Layout Dwg No. 2479-D-12 Rev C (DISC/00182/20)
- SUPERSEDED Ph2a Ecology Briefing Note Ref. edp5292_r004a (DISC/00182/20)
- SUPERSEDED Ph2a Kingston Grange, Moreton Morrell Lighting Report Ref. 2479 Rev C dated 28.02.2020 (DISC/00182/20)
- SUPERSEDED Ph2a Area Lighting Report - Parcel B1 + A1 Dwg No. 01657 AR1 (DISC/00182/20)
- SUPERSEDED Ph2a Proposed S38 Street Lighting Layout Parcel B2 Dwg No. 01658-01 (DISC/00182/20)
- Ph2a&2c Revised Cover Letter (24.4.20)
- Environmental Health Response 22.05.2020
- WCC Ecology Response 26.05.2020
- SUPERSEDED Ph2a 2c 01657-01 Parcel B1 Proposed Lighting Layout Drawing
- SUPERSEDED Ph2a 01658-01 Parcel B2 Proposed Lighting Layout Drawing
- SUPERSEDED Ph2a Road through Parcel B6 01692-01 s38 Lighting Layout
- Ph2a 2479-D-01-rev F (Spine)
- Ph2a 2479-D-02-rev F (Spine)
- Ph2a 2479-D-03-rev F (Spine)
- SUPERSEDED Ph2a 2479-D-10-rev F (A2)
- SUPERSEDED Ph2a 2479-D-11-rev F (C1)
- SUPERSEDED Ph2a 2479-D-12 rev F (A4)
- SUPERSEDED Ph2a 2c Ecological Briefing Note Lighting edp5292_r004b
- Ph2a 2c Agent Covering email 17.12.20 Amended Lighting Scheme
- WCC Highways 5.3.21
- SUPERSEDED Ph2a 01657 AR1 Rev B - Area Lighting Report - Parcels A1 & B1 & C2(part) - Upper Lighthorne, Gaydon
- Ph2a 01657 RR1 9.0M P5 SS 14W
- Ph2a 01657 RR2 9.0M P5 ST 14W
- Ph2a 01657 RR3 9.5M P4 SS 19W
- Ph2a 01657 RR4 9.5M P4 ST 19W
- Ph2a 01657 RR5 9.5M P4 SS 23W
- Ph2a 01657 RR6 9.5M P4 ST 23W
- SUPERSEDED Ph2a 01657-01 Rev A Proposed S38 Lighting Layout Drawing Parcel B1
- SUPERSEDED Ph2a 01657-02 Rev A Proposed S38 Lighting Layout Drawing Parcel A1+C2 (part)
- SUPERSEDED Ph2a 01658 AR1 - Area Light Report - Parcel B2 - Upper Lighthorne, Gaydon
- SUPERSEDED Ph2a 01658 AR1 Rev A - Area Light Report - Parcel B2 - Upper Lighthorne, Gaydon
- Ph2a 01658 RR1 9.0M P5 SS
- Ph2a 01658 RR2 9.0M P5 ST
- Ph2a 01658 RR3 9.5M P4 SS
- Ph2a 01658 RR4 9.5M P4 ST
- SUPERSEDED Ph2a 01658-01 Rev A Proposed Lighting Layout Drawing Parcel B2
- SUPERSEDED Ph2a 01658-01 Parcel B2 Proposed Lighting Layout Drawing
- Ph2a 2479-D-11-rev H (C1)
- Ph2a 2479-D-12-rev G A2(part) + A4(part)
- Ph2a 2479-D-A0-01-rev H (Taylor Wimpey)
- Ph2a 2479-SD-rev H Nick Smith Lighting Report
- Ph2a 20144-EL-02-External Lighting Plots T036 to T043 and T065 to T072 Parcel C1
- Ph2a 20144-ELAB-01- External Lighting Apartment Block (A4part)
- Ph2a 20144-ELAB-01- External Lighting Apartment Block[81] Parcel A4 (part)
- Ph2a BWA26 PL705_01 External Lighting Apartment Block-A1 Plots 60-65
- Ph2a BWA26 PL705_02 External Lighting Apartment Block-A1 Plots 80-85
- Ph2a BWA26 PL705_03 External Lighting Apartment Block-A1 Plots 106-114
- Ph2a BWA26 PL705_04 External Lighting Apartment Block-B2 Plots 43-48
- Ph2a BWA26 PL705_05 External Lighting Apartment Block-B2 Plots 90-120
- Ph2a DAT199-BC13-Solar-Nova-Bollard-Light-UK
- Ph2a edp5292_r004-C-Ecology briefing note
- Ph2a Covering email for Amendments 28.9.21
- Ph2a 2479-D-10-rev G Parcel A2
- Ph2a 2c WCC Ecology response 13.10.21
- Ph2a Environmental Health Response 18.10.2021
- Ph2a 01657-01 Rev E Proposed S38 Lighting Layout Drawing Parcel B1[51]
- Ph2a 01658-01 D Proposed Lighting Layout Drawing Parcel B2
- Ph2a 01657-02 Rev C Proposed S38 Lighting Layout Drawing Parcel A1
- Ph2a 01657 AR1 Rev D - Area Lighting Report - Parcels A1 & B1 - Upper Lighthorne, Gaydon
- Ph2a 01658 AR1 Rev C - Area Light Report - Parcel B2 - Upper Lighthorne, Gaydon
- Ph2a 20.11.209.08_Approval_Certificate_Upper_Lighthorne_Parcel_B2_Kingston Grange
- Ph2a 20.11.209.08_Approval_Certificate_Upper_Lighthorne_ParcelsA1+B1_Kingston Grange
- Ph2a WCC Lighting Technical Approval 3.12.20
- Ph2a 2c Decision DISC/00182/20 23.6.22
- DISC/00182/20 Decision Notice
- Application Form
- Application Form
- A4b Cover Letter
- A4b SUPERSEDED Proposed Section 38 Parcel A4 Lighting and Illuminance Layout Dwg. No. 2829-A4-01-rev C
- A4b SUPERSEDED Proposed Section 38 Parcel A4 Lighting and Illuminance Layout Dwg. No. 2829-A4-01-rev C
- A4b WCC Ecology Response 06.03.2024
- 2dA4b Agent email 8.5.24
- DISC/00058/24 Decision Notice
- 2b ApplicationFormRedacted
- 2b Proposed S38 Street Lighting Layout Parcel C2 Dwg No. 01889-03 Rev B
CONSULTATIONS
- Building Control
- Coventry Airport Ltd
- Warwickshire Fire and Rescue
- Gloucestershire County Council
- Highways England
- Woodland Trust
- Department for Communities and Local Government NPCU
- Sports England
- Highway Authority
- Compton Verney Parish Meeting
- Lighthorne Heath Parish Council
- Burton Dassett Parish Council
- Highways England
- Highways England
- Harbury Parish Council
- Severn Trent Water
- Historic England
- Warks CC Flood Risk Management
- Warwickshire Wildlife Trust
- Ramblers Association
- SDC Conservation Consultant
- Banbury Ornithological Society
- South Warwickshire NHS Foundation Trust
- Bishops Itchington Parish Council
- WCC Infrastructure Team
- Moreton Morrell Parish Council
- Newbold Pacey and Ashorne Parish Council
- Ward Member C Kettle
- WCC Rights of Way Team
- JLR
- Ward member C Mills
- Gaydon PC
- Ward Member J Harris
- Rights of Way
- Network Rail
- SDC Planning Policy re Retail impact
- Oxfordshire County Council
- WCC Highways/Highways England joint response
- SDC Conservation Consultant - Supplementary comments
- Natural England
- Natural England
- Gloucestershire CC
- CHESTERTON & KINGSTON PARISH MEETING
- LIGHTHORNE PC and FORSE
- Warwickshire Police and West Mercia Police
- Environment Agency
- Ward Member J Harris
- Environment Agency
- Environmental Health (Karen Dixon)
- SDC Environmental Health
- WCC Rights of Way - follow up
- Gaydon PC - additional comments
- MADE
- Highways England
- WCC Flood Risk
- SDC Community safety
- Lighthorne Parish Council
- Lighthorne Parish Council
- Lighthorne Parish Council
- Natural England - interim response
- Sport England - conditions
- Sport England - Supplementary comments
- EHO re lighting
- Coventry Airport
- Sport England
- NATS
- SDC Leisure
- Highways England
- Ambulance Trust
- SPORT ENGLAND
- SDC Leisure Services
- Cllr Chris Kettle
- Banbury Ornithological Society
- Joint Health response
- Joint Health response - supporting documents
- Bishops Itchington Parish Council
- Chesterton & Kingston Parish
- Gerald Eve LLP on behalf of Jaguar Land Rover
- Woodland Trust
- Natural England
- NHS South Warwickshire Clinical Commissioning Group
- WCC Ecology - supplementary comment
- WCC Ecology
- SDC Conservation Officer
- SWFT NHS
- Historic England
- Woodland Trust
- WWT
- Health - defib
- SDC Landscape Consultant
- WCC Rights of Way
- Environment Agency
- Defence Infrastructure Organisation
- Joint response - Lighthorne Parish Council and FORSE
- Lighthorn Heath Parish Council
- Gaydon Parish Council
- WCC Archaeology
- WCC Health
- Joint Health Response
- Harbury Parish Council
- SDC EHO Consultant
- Police Crime Prevention officer
- Public Health conditions
- WCC Highways (13.1.16) (NB Version with incorrect letter date)
- WCC Education
- Public Health (CCG)
- Bishops Itchington PC 28.5.25
- Gaydon PC (14.1.16)
- Banbury Ornithological Society 25.1.16
- Harbury Parish Council 1.2.16
- Bishops Itchington Parish Council 1.2.16
- Bishops Itchington Parish Council 9.2.16
- Gerard Eve (for JLR) 17.2.16
- Historic England 11.4.16
- Cllr Harris (16.4.16)
- Burton Dassett Parish Council 21.4.16
- Highways England (21.4.16)
- SDC CCTV (28.4.16)
- Oxfordshire County Council (29.4.16)
- Bishops Itchington PC (29.4.16)
- Lighthorne Heath Parish Council (3.5.16)
- Chesterton & Kingston Parish (3.5.16)
- Kineton Parish Council (4.5.16)
- Gaydon Parish Council (3.5.16)
- Gerard Eve (5.5.16 for JLR)
- Harbury Parish Council (9.5.16)
- WCC Highway Authority (11.5.16) (NB version with typo errors)
- WCC Highway Authority 11.5.16 (NB version with corrected typo errors )
- WCC Highway Authority 13.1.16 (NB Version with correct letter date)
- FORSE 12.05.2016
- Lighthorne PC 12.05.2016
- Bishop s Itchington Parish Council (12.5.16)
- Councillor J Harris (12.5.16)
- Lighthorne Parish Council
- Lighthorne PC (17.5.16)
- Councillor Kettle (with British Cycling comments) (20.5.16)
- WCC Highway Authority (20.5.16) (Responses to Parishes)
- Councillor Kettle (20.5.16) + see separate file for related Appendix (TRICS Guide)
- Cllr Kettle Appendix (20.5.16) TRICS Guide
- Kineton Parish Council (20.5.16)
- WCC Highway Authority (23.5.16) (Response to Cllr Kettle matters raised 20.5.16)
- Submission by Cllr Kettle (24.5.16) of Cycling UK Campaign Briefing 7c (November 2015) ‘Cycling to school or college’
- SWFT NHS Acute Healthcare Updated request March 2017
- John Gordon 14.5.19
- Case Officer Refusal 14.5.19
- Ecology 17.02.2020
- WCC Ecology 20.4.20
- WCC Ecology 21.8.20 - Acceptable
- WCC Ecology
- Ecology
- WCC Ecology (24.8.22)
- WFRS Response 12.02.2024
CORRESPONDENCE
- Applicant to Historic England - in response to comments made
- Ward Member J Harris
- Highways England/Brookbanks re modelling
- JMP re highway response
- WCC Ecology re info required
- Warks Police - clarification
- Arup report - POS Play Sport provision
- Agent re ecology LEMP
- Letter from Land Trust
- WCC Highways email to Cllr Harris 5.2.16 Re: Public Transport
- WCC Highways to Cllr Kettle 5.2.16 Re: Various Highway Matters
- WCC Highways to Cllr Harris 23.2.16 Re: B4100 Bypass
- WCC letter to Cllr Kettle & Cllr Harris re Highway Matters 13.4.16
- email SDC to Brookbanks 3.3.16
- WCC Highways to Councillor Harris Re: Bypass Policy Documents 9.5.16
- WCC Highways to Cllr Kettle inc. data requested (22.6.16)
- email to NPCU 4.7.16 Re referral to Secretary of State
- Update to NPCU re CS Adoption 12.7.16
- Letter 21.7.16 from NCPU - Secretary of State not calling in the case
- Case Officer email to Agent 17.8.20
- email to Agent 24.8.20 outstanding matters + EOT request
- Agent email 4.3.21 with Rev r008g of LEMP
- Agent email 13.10.22 corrected BIA Report revB
DECISIONS
- Notice of Decision - Outline Permission 14.12.17
- Section 106 Agreement
- Addendum to Notice of Decision
- Post decision EIA Regs Statement
- DISC/00229/18 Decision Notice Condition 10A (part) Archaeology WSI (East) 15.5.18 Approved
- DISC/00246/18 Decision Notice
- DISC/00313/18 Decision Notice
- 18/03640/S106 Temporary Healthcare facility not required (by NHS) S106 obligation complied with 20.2.19
- Temp Healthcare facility not required (by NHS) obligation complied with 20.2.19
- 19/01068/AMD Approval Non Material Amendment Condition 24
- Decision (Affordable Housing S106 obligations) Refused 15.5.19
- DISC/00181/19 Decision Notice
- DISC/00205/19 Decision Notice
- DISC/00369/19 Decision Notice
- DISC/00223/19 Decision Notice
- DISC/00224/19 Decision Notice
- DISC/00225/19 Decision Notice
- DISC/00428/19 Decision Notice
- DISC/00468/19 Decision Notice
- DISC/00065/19 Decision Notice
- DISC/00226/19 Decision Notice
- 19/01538/S106 Overall Affordable Housing Delivery Plan Decision
- DISC/00429/19 Decision Notice
- DISC/00427/19 Decision Notice
- DISC/00013/20 Decision Notice
- DISC/00439/19 Decision Notice
- DISC/00227/19 Decision Notice
- DISC/00235/20 Decision Notice
- DISC/00502/19 Decision Notice
- DISCN/00327/20 Decision Letter (Cond 40) Phases 2a & 2c 14.10.20
- DISC/00427/20 Decision Noitce
- DISC/00472/20 Decision Notice
- DISC/00180/20 Decision Notice
- Decision Letter 10.03.21 (cond 25) DISC/00009/21 (B4100)
- Decision Letter 10.03.21 (cond 26) DISC/00011/21 (B4100)
- Decision Letter 10.03.21 (cond 36) DISC/00334/20 (B4100)
- DISC/00419/21 Decision Notice
- 21/03083/AMD Ph2a A1 amended materials 14.10.21
- DISC/00575/21 Decision Notice
- DISC/00027/22 Decision Notice
- 20/00039/20 Notice of Decision Community Champion 4.3.22
- DISC/00469/21 Decision Notice
- DISC/00182/20 Decision Notice
- Decision Letter (BIA 2b 2d 2e)
- Decision 20/03112/S106 Phase 1 AHS
- DISC/00323/22 Decision Notice
- DISC/00036/24 Decision Notice
- Decision Letter (Phase 1 First Homes)
- DISC/00041/23 Decision Notice
- DISC/00063/22 Decision Notice
- DISC/00070/22 Decision Notice
- DISC/00393/23 Decision Notice
- DISC/00053/24 Decision Notice
- DISC/00058/24 Decision Notice
- DISC/00085/24 Decision Notice
- DISC/00264/24 Decision Notice
- DISC/00039/24 Decision Notice
- DISC/00265/24 Decision Notice
- DISC/00265/24 Decision Notice
- DISCN/00063/24 Decision Notice
- DISC/00179/22 Decision Notice
- S106 agreement 15.06.2023
- S104 31st October 2019
- DISC/00040/23 Decision Notice
DOCUMENTS
OFFICER DOCS
PLANS
- Illustrative Masterplan 00880 MP02 P1
- Land use 00880 OPP01 OPA
- Density 00880 PP02 OPA
- Building Heights 00880 PP03 P1 OPA
- Access and Movement 00880 PP04 P1 OPA
- Open space Provision 00880 PP05 P1 OPA
- Site Location plan 00880 SK36 D1 OPA
- B4100 and Village Centre Access Arrangements 1 of 2 10192-HL-60
- Highway access plan 10192-HL-61B (Amended)
- Tree Constraints plans - Appendix to Pre-Development Arboricultural Survey (1)
- Tree Constraints plans - Appendix to Pre-development Arboricultural Survey (2)
- Tree constraints plans - Appendix to Pre-development Arboricultural survey
- Demolition Plan (From ES Vol 2 Apx 5.4)
- Soft Landscape Plan 1 of 3
- Soft Landscape Plan 2 of 3
- Soft Landscape Plan 3 of 3
- Soft Landscape Plan 1 of 3
- Soft Landscape Plan 2 of 3
- Soft Landscape Plan 3 of 3
- Overall Affordable Housing Delivery Plan
- T15034 SK101_D PRIMARY ROAD DETAILS
- T15034 SK102_D SECONDARY ROAD 1 DETAILS
- T15034 SK103_C SECONDARY ROAD 2 DETAILS
- T15034 SK111_D PRIMARY ROAD - VISIBILITY (SHEET 1 OF 2)
- T15034 SK112_D PRIMARY ROAD - VISIBILITY (SHEET 2 OF 2)
- T15034 SK113_D SECONDARY ROAD 1 - VISIBILITY
- T15034 SK121_D PRIMARY ROAD SWEPT PATH - BUS
- T15034 SK122_D PRIMARY ROAD SWEPT PATH - BUS-RCV (SHEET 1 OF 2)
- T15034 SK123_D PRIMARY ROAD SWEPT PATH - BUS-RCV (SHEET 2 OF 2)
- T15034 SK124_D PRIMARY ROAD SWEPT PATH - BUS-FA (SHEET 1 OF 2)
- T15034 SK125_D PRIMARY ROAD SWEPT PATH - BUS-FA (SHEET 2 OF 2)
- T15034 SK126_D PRIMARY ROAD SWEPT PATH -RCV TURNING
- Materials Layout Parcel C1 Dwg No. PL205 V
- C3429 - Conveyance Plans-Conveyance Plot 96
- C3429 - Conveyance Plans-Conveyance Plot 98
- C3429 - Conveyance Plans-Conveyance Plot 119
- C3429 - Conveyance Plans-Conveyance Plot 120
- C3429 - Conveyance Plans-Conveyance Plot 138
- C3429 - Conveyance Plans-Conveyance Plot 139
- C3429 - Conveyance Plans-Conveyance Plot 137
- Drawing Number P300 Rev C - Estate Layout Plan dated 07.06.2019
- Drawing Number P300 Rev C - Estate Layout Plan dated 07.06.2019
REPORTS
- Committee Report
- Preliminary Update Report to Planning Committee East (NB Associated documents can be viewed in the Consultations section of the planning file)
- Appendix 1 to Preliminary Update Report - Councillor kettle comments 20.5.16
- Appendix 2 to Preliminary Update Report - Councillor Kettle Appendix to his comments 20.5.16
- Appendix 3 to Preliminary Update Report - WCC Highway Authority letter dated 20.5.16
- Preliminary Update Report (including Appendices) to Planning Committee (sent 20.5.16)
- Final Update Report (including appendices) to Planning Committee (sent 24.5.16)
- Minutes from 24.5.16 Planning Committee
SECTION 106
- B4100 Works Application (17/01017/S106)
- Background Documents B4100 Works Application (17/01017/S106)
- Comments B4100 Works Application (17/01017/S106)
- Consultations B4100 Works Application (17/01017/S106)
- Correspondance B4100 Works Application (17/01017/S106)
- Decision B4100 Works Application (17/01017/S106)
- Documents
- Plans B4100 Works Application (17/01017/S106)
- Reports B4100 Works Application (17/01017/S106)
- Application Form (Temp Healthcare Ph2)
- Temporary Healthcare facility not required (by NHS) S106 obligation complied with 20.2.19
- Ph1 Landscape & Ecological Management Plan (March 2019)
- Ph1 Biodiversity Impact Assessment
- Ph1 Tenure Plan
- Ph1 Affordable Housing Covering Letter
- Ph1 Application Form (Affordable Housing, Green Infrastructure Spec, BIA, LEMP)
- Ph1 Natural England Meeting Minutes 11.1.19 (Protected Species)
- Ph1 Landscape Plan 1 of 3
- Ph1 Landscape Plan 3 of 3
- Application Form Overall Affordable Housing Delivery (May 2019)
- SUPERSEDED Overall Affordable Housing Delivery Plan
- Section 106 Agreement (14.12.17)
- Location Temporary Community Centre Plan
- Temp Community Building
- Floorplan Proposed New Temp Hub
- Application Form - 20/00039/S106
- Community Champion Covering Letter - 20/00039/S106
- SUPERSEDED Community Champion Specification - 20/00039/S106
- Application Form - 20/00039/S106
- Community Champion Covering Letter - 20/00039/S106
- SUPERSEDED Community Champion Specification - 20/00039/S106
- Decision Letter 19/03521/S106 Temporary Community Hub (15.1.20)
- Covering Letter - 20/00243/S106
- SUPERSEDED Application Form - 20/00243/S106
- Landscape & Ecological Management Plan Phase 2a - 20/00243/S106
- Landscape & Ecological Management Plan Phase 2c - 20/00243/S106
- Covering Letter - 20/00243/S106
- SUPERSEDED Application Form - 20/00243/S106
- SUPERSEDED LEMP Phase 2a - 20/00243/S106
- SUPERSEDED LEMP Phase 2c - 20/00243/S106
- SUPERSEDED Combined LEMP & Green Infrastructure Specification Phases 2a + 2c 31.3.20
- Revised Application Form 31.3.20
- SUPERSEDED Ph2a+2c Landscape And Ecology Management Plan: Phases 2A and 2C Ref edp5292_r008c
- Application Forms - 20/01902/S106
- Covering Letter 20-01902-S106
- Biodiversity Impact Assessment - 20-01902-S106
- Section 106 Agreement dated 14 December 2017 - 20/01902/S106
- Covering Letter - 20/01902/S106
- Application Forms - 20/01902/S106
- Section 106 Agreement dated 14 December 2017 - 20/01902/S106
- SUPERSEDED Ph2a+2c Landscape And Ecology Management Plan: Phases 2A and 2C Ref edp5292_r008d
- SUPERSEDED Ph2a+2c Landscape And Ecology Management Plan: Phases 2A and 2C Ref edp5292_r008e
- WCC Ecology approval 14.1.21
- Application Forms
- Affordable Housing Specification Form
- Appendix A - S106 Agreement Dated 14th December 2017
- Appendix B - Approved Overall Affordable Housing Delivery Plan
- SUPERSEDED Appendix C - Approved Phase 2A Reserved Matters Layout
- Appendix D (part 1) - Affordable Housing Mix NB Taylor Wimpey element remains but BDW element is Superseded by new Appendix D document.
- Land at Gaydon. Lighthorne Heath, Stratford on Avon - Phase 2A, Affordable Housing Specification April 21
- Application Forms
- Affordable Housing Specification Form
- Appendix A - S106 Agreement Dated 14th December 2017
- Appendix B - Approved Overall Affordable Housing Delivery Plan
- SUPERSEDED Appendix C - Approved Phase 2A Reserved Matters Layout
- Appendix D (part 1) - Affordable Housing Mix NB Taylor Wimpey element remains but BDW element is Superseded by new Appendix D document.
- Land at Gaydon. Lighthorne Heath, Stratford on Avon - Phase 2A, Affordable Housing Specification April 21
- Email 20.5.21 Mark Elliot Affordable Housing
- Appendix D (part 2) NB for BDW only - Affordable Schedule of Accommodation parcels A1 C2 B1 B2
- Appendix C revised - BWA26 PL100G - Overall Masterplan - Linework
- BWA26 PL400D - Site Layout Parcel B1
- BWA26 PL401D - Site Layout Parcel B2
- BWA26 PL402H - Site Layout Parcel A1
- BWA26 PL403H - Site Layout Parcel C2
- Withdrawn Letter
- Withdrawn Letter
- Decision 20/00243/S106 LEMP Ph2a 2c (14.6.21)
- Application Form
- Appendix B - Approved Overall Affordable Housing Delivery Plan
- Appendix Ci - Approved Phase 2A Reserved Matters Layout[41]
- Appendix D - Affordable Housing Mix by Type, Tenure and Size
- Land at Gaydon. Lighthorne Heath, Stratford on Avon - Phase 2A, Affordable Housing Specification April 21 (Revised May 2021)[87]
- Request for Approval of Affordable Housing
- Phase 1 (Bellway) Supplemental Agreement 19.01.2022 Affordable Housing matters
- Community Champion Job Specification Feb 2022 - Final
- GLH New Settlement Community Engagement Strategy February 2022
- NOD Approval Community Champion 20/00039/S106 4.3.22
- Application Forms
- Covering Letter
- BIA calcuations for Phase 1A
- Final Layout Plan
- Approved BIA calculations for LWS Phase 2
- Ph1 Kingston Grange LEMP
- Application Forms
- Covering Letter
- BIA calcuations for Phase 1A
- Final Layout Plan
- Approved BIA calculations for LWS Phase 2
- Ph1 Kingston Grange LEMP
- Bio Diversity Application Form
- Biodiversity Impact Assessment
- JT to SDC Gaydon BIA Covering Letter
- Appendix B - Approved Overall Affordable Housing Delivery Plan
- Affordable Housing application form
- Phase 2D affordable housing specification May 2022
- Appendix A Phase 2D TW Parcels Drawing 17066 2011
- S106 Agreement dated 14th December 2017
- Appendix D - Affordable Housing Mix 2D
- Appendix D - Affordable Housing Mix 2D
- BIA Calculation edp5292 WCS_BIA_v.19.1 2B 2D 2E(1.0)
- Covering Letter
- SUPERSEDED LEMP edp5292_r019-A Phases 2b, 2d & 2e
- Covering Letter
- Application Form
- SUPERSEDED LEMP edp5292_r019-A Phases 2b, 2d & 2e
- Section 106 Agreement dated 14 December 2017
- 2b2d2e LEMP WCC Ecology 29.9.22
- Agent agreement to 40 working day matter 3.10.22
- Biodiversity Impact Assessment edp5292_r017-B- (Rec d 13.10.22)
- Application Form
- Covering Letter
- Affordable Housing Specification Phase C2- November 2022
- Application Form
- Covering Letter
- SUPERSEDED Affordable Housing Specification - Phase C2 November 2022
- Section 106
- Section 106
- 2b 2d 2e LEMP edp5292_r019-C-(Rec d 17.5.23),
- 2b2d2e WCC Ecology no reps 24.5.23 revised LEMP
- Unilateral Undertaking dated 15 June 2023
- Avon Valley Bowls Club - Agent email 27.10.23 advising Pt2 Sch3 no longer required
- SUPERSEDED 2b Affordable Housing Specification 11.12.2023
- SUPERSEDED 2b AHS Appendix A
- SUPERSEDED 2b AHS Appendix B
- SUPERSEDED 2b AHS Appendix C
- SUPERSEDED 2b AHS Covering email 22.12.23
- 2b Affordable Housing Specification Gaydon Heritage Grange Phase C2 REV1 2.10.24
- 2b C2 AHS Appendix A Site Layout
- 2b C2 AHS Appendix B Tenure Plan
- 2b C2 AHS Appendix C Affordable Conveyance Plan
- 2b C2 Agent covering email 15.10.24
SECTION 106A
- Covering Letter
- Application Form
- Site Location Plan
- Application Form
- Plan Showing First Home Plots
- Notice of Decision - 15/00976/OUT
- Notice of Decision - 18/03307/REM
- Application Form
- Plan Showing First Home Plots
- Prescribed Clauses
- Section 106 Agreement dated 14/12/2017
- Notice of Decision - 15/00976/OUT
- Notice of Decision - 18/03307/REM
- Prescribed Clauses
- Correspondence from Agent 25.05.2022
- Official Copy of Register of Title - WK295981 dated 08.03.2021
- Official Copy (Title Plan) - WK501422 dated 12.02.2021
- Correspondence from Agent 25.05.2022
- Official Copy of Register of Title - WK295981 dated 08.03.2021
- Official Copy (Title Plan) - WK501422 dated 12.02.2021
SUPERSEDED
- B4100 and Village Centre Access arrangements 1 of 2
- Agricultural Land Classification
- Environmental Statement Appendix - Chapter 13.2 - Built Heritage Assessment
- Sports England
- Sport England withdrawing objection re bowling rinks
- Design and Access Statement - further amendments
- Confirmation of changes to DAS
- Tenure Plan BHSM/P008 Rev E
- Tenure Plan BHSM/P008 Rev E
- Overall Affordable Housing Delivery Plan
{{PageListing}}