{{ MaintenanceDetail }}
Documents such as Excel files (.xls,Xlsx,Xlsm) will need to be downloaded to view please check your download folder
Please note This system only works on modern browsers such as Edge,Chrome,Firefox and Safari (Apple devices)
To download a document use the button. Note: Documents that contain a large number of pages can take some time to process!
AMENDMENTS
- Building heights plan
- Density plan
- Land use plan
- Red line plan
- Illustrative master plan showing revisions
- Revised illustrative master plan
- Revised Design and Access statement
- Revised Cultural Heritage Assessment
- Revised Landscape and Visual appraisal
- Revised Planning Statement
- Biodiversity Impact Assesment calculations
- E mail from applicant regarding highway issues
- Amended Master plan - showing bollards to Adams Close
- Highways Response Note
APPEALS
- Details from Appellant/Agent
- Appellants Statement of Case
- Draft Statement of Common Ground
- Initial Letter from PINS
- Site Notice
- Appeal Programme
- SUPERSEDED Council Statement of Case 23.06.2015
- Amended Council Statement of Case 23.06.2015
- Council Email to Planning Inspectorate 23.06.2015
- Council s Appendix 1
- Council s Appendices 2 to 11
- Council s Proof of Evidence
- Representations from NHS
- Appellants Landscape Proof of Evidence
- Appellants Landscape Appendices to Proof of Evidence
- Appellants Updated Concept Masterplan
- Appellants Highways Proof of Evidence
- Appellants Highways Proof of Evidence - Updated Highways Plan
- Appellants Planning Proof of Evidence
- Appellants Planning Summary Proof of Evidence
- South Warwickshire NHS Addendum
- Signed Statement of Common Ground Received 23.11.2015
- Statement of Common Ground
- Closing Statements 03.12.2015
- 5YHLS Update 04.01.2016
- Update from PINS 14.01.2016
- KV Appendix 3
- KV Appendix 17
- KV Appendix 15
- KV Appendices 12, 13, 14, 16, 18, 19 & 20
- KV Appendices 1, 2, 4, 5, 6, 10, 7, 8, 11 & HLS Statement
- Appeal Decision
APPLICATION
- Framework Travel Plan
- Application forms
- Ecological Assessment
- Flood Risk Assessment Appendices Part 1
- Flood Risk Assessment Appendices Part 2
- Flood Risk Assessment
- Statement of Community Engagement
- Transport Assessment
- Agricultural Land Classification Statement
- Archaeological Geophysical Survey
- Application Form
- Correspondence from Applicant
- Application Form
- Application Form
CONDITIONS
- Application forms (6, 11, 12, 13, 18) - dated 05.06.17
- Condition 6 1705-PL1-09(A) Local Equipped Area of Play details
- Condition 11-08C
- Condition 11- 07(C)
- Condition 11- 09 A
- Condition 11 -04 C
- Conditions 11 -03C
- Conditions 11-02C
- Condition 12 -7782 Cemex Long itchington Management Plan Final
- Condition 12 -7782 Cemex Long itchington Management Plan Final
- Condition 13 -7782 AMS Tree Protection
- Email from E Wrench re condition 18
- Application Form - Condtion 18 rec d 13/7/2017
- Condition 18-Long Itchington, Stockton Road TT Report 17_86
- Ecology Response 14.7.17
- Agent Response to Ecology 17.7.17
- Ecology Response 19.7.17
- Agent/Ecology Correspondance 18.7.17
- Condition 11 Soft Landscping Plan
- SDC Officer Response 29.8.17
- Decision Letter - Condition 18
- Condition 6 Response
- WCC Ecology Response 15.9.17
- Local Equipped Play Area Details
- Helen Smith Response Condition 6
- Decision Letter (approved 6, 11, 12, 13, 18) 31.10.17
- 31/10/17 Application Form - Cond 7
- Condition 7-Drwg 855-02-03 Rev 2
- Condition 7 - Drwg 855-02-04
- Condition 7 - 855-02-S38 Rev 2
- Condition 7 - Drwg 855-03-01
- Condition 7 - Drwg 855-03-104 Rev 1
- Condition 7 - Drwg 855-05-01 Rev 2
- Condition 7 - Drwg 855-05-02 Rev 1
- Condition 7 - Drwg 855-05-03 Rev 2
- Condition 7 - Drwg 855-05-04
- Condition 7 - Drwg 855-06-01 Rev 2
- Condition 7 - Drwg 855-06-02 Rev 1
- Condition 7 - Drwg 855-06-03 Rev 2
- Condition 7 - DWH Standard Private Drive Details
- Condition 7 of Appeal Decision
- Decision Letter
CONDITIONS 007
- Adoptable Drainage Details (roads and sewers) Drawing 855-03-01 dated May 2017, rec d 18.04.18
- Adoptable Drainage Layout Drawing 855-03-04 Rev 4 dated 11 April 2018, rec d 18.04.18
- Finished Levels Layout Sheet 1 Drawing 855-05-01 Rev 6 dated 28 March 2018, rec d 18.04.18
- Finished Levels Layout Sheet 2 Drawing 855-05-02 Rev 3 dated 14 February 2018, rec d 18.04.18
- Finished Levels Layout Sheet 3 Drawing 855-05-03 Rev 6 dated 28 March 2018, rec d 18.04.18
- External Works Layout Sheet 1 Drawing 855-06-01 Rev 5 dated 28 March 2018, rec d 18.04.18
- External Works Layout Sheet 2 Drawing 855-06-02 Rev 3 dated 14 February 2018, rec d 18.04.18
- External Works Layout Sheet 3 Drawing 855-06-03 Rev 5 dated 28 March 2018, rec d 18.04.18
- Private Drive Generic Construction Detail Drawing MUG dated 3 November 2014, rec d 18.04.18
- Bus Turning Evaluaton Drawing CMX-BTE-001 Rev E dated 4 April 2018, rec d 18.04.18
- Decision Letter 08.01.2019 (Condition 7) DISC/00208/18
CONDITIONS 014
- (1) Condition 14 - Adoption of sewer from Adams Close - STW letter to A C Lloyd Homes dated 05 October 2017 (Signed Vesting Certificate 09 April 2013)
- (1) Condition 14 - 855 SW System Results (1-30 years), simulated 13 October 2017 and prepared by Infrastructure Design
- (1) Condition 14 - S104 Application - STW letter dated 06 October 2017 to Infrastructure Design (acknowledging sewer adoption application)
- (1) Condition 14 - 855-03-06, Flood Route Layout, dated October 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855 SW System Results (100 years + 30%) simulated 17 October 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855-07-03 Rev 1, Private Drainage Layout, Sheet 3, dated 11 September 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855-07-04, Drainage Details, dated May 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855-03-185 Rev 1, S185 Adoptable Drainage Diversion Layout, dated 11 September 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855-07-02 Rev 1, Private Drainage Layout, Sheet 2, dated 11 September 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855-03-02, Adoptable Drainage Headwall Details, dated May 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855-03-03 Rev 1, Adoptable Drainage Hydrobrake Chamber, dated 11 September 2017 and prepared by Infrastructure Design
- (1) Condition 14 - 855-03-01, Adoptable Drainage Details, dated May 2017 and prepared by Infrastructure Ltd
- (1) Condition 14 - Submerged Outfall Statement (rec d17/10/17)
- (1) Condition 14 - Electronic Copy of Model Statement (rec d 17/10/17)
- (1) Condition 14 - STW response to Developer Enquiry dated 17/11/16
- (1) Condition 14 - 855-07-01 Rev 1, Private Drainage Layout, Sheet 1, dated 11 September 2017 and prepared by Infrastructure Design
- (1) Condition 14 - LLFA Response (14, more info), dated 01/11/17
- Condition 14 - ADDITIONAL INFO - Applicant email detailing attenuation ponds Schedule of Maintenance and groundwork management (rec d 20/11/17)
- Condition 14 - ADDITIONAL INFO - 855 SW System Results (1-100 years), simulated 15 November 2017 and prepared by Infrastructure Design Ltd (rec d 20/11/17)
- Condition 14 - ADDITIONAL INFO - Cemex Habitat Management Plan (final issue) dated 24 May 2017 and prepared by FPCR Environment and Design Ltd (rec d 20/11/17)
- Condition 14 - ADDITIONAL INFO - Storm Drainage Exceedance Analysis and attached Drawing no 855-03-06, Flood Route Layout, dated October 2017 and prepared by Infrastructure Design Ltd (rec d 20/11/17)
- Email trail admin/applicant re Microdrainage Model and FRA, dated 19 October 2017
- Condition 14 - SUDS Detention Basin Management Plan (rec d 17/10/17)
- Condition 14 - 855-03-104 Rev 1, S104 Adoptable Drainage Layout, dated 11 September 2017 and prepared by Infrastructure Design
- Condition 14 - ADDITIONAL INFO - Report 29421/001 Rev: Final - Flood Risk Assessment - dated April 2014 and prepared by Peter Brett (rec d 17/10/17 and 30/11/17)
- Admin email to LLFA sending applicant s additional info (dated 20/11/17), 08/11/17
- Condition 14 - SUDS Detention Basin Management Plan (rec d 17/10/17)
- Condition 14 - 855-03-104 Rev 1, S104 Adoptable Drainage Layout, dated 11 September 2017 and prepared by Infrastructure Design
- Condition 14 - ADDITIONAL INFO - Report 29421/001 Rev: Final - Flood Risk Assessment - dated April 2014 and prepared by Peter Brett (rec d 17/10/17 and 30/11/17)
- Admin email to LLFA sending applicant s additional info (dated 20/11/17), 08/11/17
- Condition 14 - LLFA response (recommend CRT cons) 12/12/17
- Condition 14 - LLFA response (recommend CRT cons) 12/12/17
- Response from Agent re LLFA consultation
- Canal and River Trust
- CRT response
- Adoptable Drainage Layout Dwg No. 855-03-04 Rev 14
- Application Returned Letter 19.08.20 (DISC/00545/18)
CONDITIONS 015
CONSULTATIONS
- SDC Technical Services
- Building Control
- Warwickshire Police
- National Grid
- WCC Fire and Rescue Services Water Officer - Racha
- Archaeology Team
- Ecology response
- South Warwickshire NHS Foundation Trust
- Parish Council
- Environment Agency
- WCC Rights of Way
- WCC Archaeology
- Conservation advice
- SDC EHO
- SEVERN TRENT WATER
- Cannal Trust
- SDC Landscape advice
- WCC Highways
- WCC Education
- WCC Education - Calculations
- Building Control
- WCC RIghts of Way
- SDC Landscape advice
- SDC Landscpe advice
- SDC Landscape
- WCC Ecology
- WCC Ecology to applicant s Ecologist
- SDC Landscape Consultant
- WCC Ecology
- WCC Highways
- WCC Highways letter
- WCC Libraries calculations
- Ward Member
- Ward member
CORRESPONDENCE
DECISIONS
OFFICER DOCS
PLANS
REPORTS
SECTION 106
SUPERSEDED
{{PageListing}}